01425 Train Running Status Today — Kalaburagi Special
01425
Kalaburagi Special01425
Kalaburagi SpecialArrival
Day 1 - 19 Jul
Departure
01425Train on Demand
Kalaburagi Special
Runs On
MonTueWedThuFriSatSun
Distance
301 kmDuration
6h 20mHalts
16Avg Speed
47.5 km/hMax Speed
96 km/hReturn
01426Arrival
Day 1 - Jul 19
Departure
DAUND JUNCTION
0.0 km•
5:00AM5:00AM
5:01AM
DAUND ELECTRIC LOCO SHED
1.4 km
5:01AM
5:09AM
BORIBEL
10.5 km
5:09AM
5:17AM
MALTHAN
19.9 km
5:17AM
5:24AM5:24AM
BHIGWAN
28.0 km•
5:25AM5:25AM
5:38AM
JINTI ROAD
39.7 km
5:38AM
5:49AM5:49AM
KETTUR (PAREWADI)
49.0 km•
5:50AM5:50AM
6:00AM
WASHIMBE
56.3 km
6:00AM
6:12AM
POPHLAJ
66.1 km
6:12AM
6:24AM6:24AM
JEUR
75.0 km•
6:25AM6:25AM
6:28AM
BHALWANI
77.4 km
6:28AM
6:34AM
DHAVALAS
82.7 km
6:34AM
6:44AM6:44AM
KEM
91.0 km•
6:45AM6:45AM
6:58AM
DHAVALAS
99.5 km
6:58AM
7:12AM7:12AM
KURDUWADI JUNCTION
109.0 km•
7:15AM7:15AM
7:22AM
WADSINGE
117.2 km
7:22AM
7:29AM7:29AM
MADHA
125.0 km•
7:30AM7:30AM
7:36AM
VAKAV
132.2 km
7:36AM
7:41AM
ANGAR
138.5 km
7:41AM
7:46AM
MALIKPETH
145.6 km
7:46AM
7:54AM7:54AM
MOHOL
155.0 km•
7:55AM7:55AM
8:06AM
MUNDHEWADI
162.8 km
8:06AM
8:18AM
PAKNI
171.7 km
8:18AM
8:31AM
BALE
181.7 km
8:31AM
8:40AM8:40AM
SOLAPUR
188.0 km•
8:45AM8:45AM
8:54AM8:54AM
TIKEKAR WADI
195.0 km•
8:55AM8:55AM
9:00AM9:00AM
HOTGI JUNCTION
203.0 km•
9:01AM9:01AM
9:02AM
HOTGI CHORD CABIN
204.6 km
9:02AM
9:05AM
TILATI
209.3 km
9:05AM
9:14AM9:14AM
AKALKOT ROAD
223.0 km•
9:15AM9:15AM
9:20AM
NAGANSUR
228.4 km
9:20AM
9:29AM9:29AM
BOROTI
237.0 km•
9:30AM9:30AM
9:44AM9:44AM
DUDHANI
251.0 km•
9:45AM9:45AM
9:53AM
KULALI
260.6 km
9:53AM
9:59AM
GAUDGAON
267.8 km
9:59AM
10:04AM10:04AM
GANAGAPUR ROAD
274.0 km•
10:05AM10:05AM
10:23AM
HUNSIHADGIL
280.4 km
10:23AM
10:43AM
SAWALGI
287.8 km
10:43AM
11:04AM
BABLAD
295.4 km
11:04AM
11:20AM11:20AM
KALABURAGI JUNCTION
301.0 km•
At DAUND JUNCTION
ScheduledUpdated few seconds ago
DDKLBG
Next StopBGVN28km - 5:24AM
To ReachKLBG301km - 11:20AM
01425 Kalaburagi Special runs from DAUND JUNCTION to KALABURAGI JUNCTION. It covers 301 km in 6h 20m, stopping at 16 stations. Departs DAUND JUNCTION at 05:00 and arrives at KALABURAGI JUNCTION at 11:20. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. This train runs on Thu, Sun.
01425 Schedule — 16 stops
IST| # | Station | Arr | Dep |
|---|---|---|---|
| 1 | DAUND JUNCTIONDD | SRC | 05:00 |
| 5 | BHIGWANBGVN | 05:24 | 05:25 |
| 7 | KETTUR (PAREWADI)KEU | 05:49 | 05:50 |
| 10 | JEURJEUR | 06:24 | 06:25 |
| 13 | KEMKEM | 06:44 | 06:45 |
| 15 | KURDUWADI JUNCTIONKWV | 07:12 | 07:15 |
| 17 | MADHAMA | 07:29 | 07:30 |
| 21 | MOHOLMO | 07:54 | 07:55 |
| 25 | SOLAPURSUR | 08:40 | 08:45 |
| 26 | TIKEKAR WADITKWD | 08:54 | 08:55 |
| 27 | HOTGI JUNCTIONHG | 09:00 | 09:01 |
| 30 | AKALKOT ROADAKOR | 09:14 | 09:15 |
| 32 | BOROTIBOT | 09:29 | 09:30 |
| 33 | DUDHANIDUD | 09:44 | 09:45 |
| 36 | GANAGAPUR ROADGUR | 10:04 | 10:05 |
| 40 | KALABURAGI JUNCTIONKLBG | 11:20 | DST |
Frequently Asked Questions — 01425 Kalaburagi Special
- What time does 01425 (Kalaburagi Special) start from DAUND JUNCTION?
- It departs from DAUND JUNCTION (DD) at 05:00 and reaches KALABURAGI JUNCTION (KLBG) at 11:20.
- What is the last station for 01425?
- The final station of 01425 is KALABURAGI JUNCTION (KLBG), arriving at 11:20. You can see the full schedule and route map above.
- Where is train number 01425 right now?
- You can check the live location of 01425 (Kalaburagi Special) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
- How accurate is the running status for train 01425?
- The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
- Why is train 01425 showing offline or not updating?
- If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
- What is the total travel distance of 01425?
- It covers a total distance of 301 km from DAUND JUNCTION to KALABURAGI JUNCTION in about 6 hours and 20 minutes.
- On which days does 01425 run?
- This train runs on: Thu, Sun. Please verify the running status before leaving for the station.
Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.