RailRadar LogoRailRadar

05021 Train Running Status Today — SPN INAUGURAL SPL

05021
SPN INAUGURAL SPL
Arrival
Day 1 - 6 Jul
Departure
05021Mail/Express

SPN INAUGURAL SPL

Runs On

MonTueWedThuFriSatSun
Distance
89.2 km
Duration
2h 45m
Halts
16
Avg Speed
32.4 km/h
Max Speed
98.6 km/h
Arrival
Day 1 - Jul 6
Departure
PILIBHIT JN
0.0 km
10:45AM10:45AM
10:56AM10:56AM
Pratabpur
6.3 km
10:58AM10:58AM
11:04AM11:04AM
Pauta
11.2 km
11:06AM11:06AM
11:13AM11:13AM
Bhopatpur
19.3 km
11:15AM11:15AM
11:24AM11:24AM
SHERGANJ
27.3 km
11:26AM11:26AM
11:34AM11:34AM
Bisalpur
37.3 km
11:36AM11:36AM
11:42AM11:42AM
MIGHAUNA
42.9 km
11:44AM11:44AM
11:49AM11:49AM
Chak Safaura Halt
46.6 km
11:51AM11:51AM
11:55AM11:55AM
Zindpura
49.1 km
11:57AM11:57AM
12:02PM12:02PM
Vazeerpur Halt
53.8 km
12:04PM12:04PM
12:16PM12:16PM
NIGOHI
56.2 km
12:18PM12:18PM
12:25PM12:25PM
DHAKIA TIWARI
67.7 km
12:27PM12:27PM
12:29PM
KHIRIA KHURD
71.3 km
12:29PM
1 intermediate station
12:31PM12:31PM
ARELI
74.1 km
12:33PM12:33PM
12:38PM12:38PM
KHIRIA KHURD
76.9 km
12:40PM12:40PM
12:46PM
ARELI
79.7 km
12:46PM
1 intermediate station
12:56PM12:56PM
SHAHBAZNAGAR
84.4 km
12:58PM12:58PM
1:30PM1:30PM
SHAHJAHANPUR JN.
89.2 km
At PILIBHIT JN
ScheduledUpdated few seconds ago
PBESPN
Next StopPTPR6.3km - 10:56AM
To ReachSPN89.2km - 1:30PM

05021 SPN INAUGURAL SPL runs from PILIBHIT JN to SHAHJAHANPUR JN.. It covers 89.2 km in 2h 45m, stopping at 16 stations. Departs PILIBHIT JN at 10:45 and arrives at SHAHJAHANPUR JN. at 13:30. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. This train runs on Mon.

05021 Schedule — 16 stops

IST
#StationArrDep
1PILIBHIT JNPBESRC10:45
2PratabpurPTPR10:5610:58
3PautaPUF11:0411:06
4BhopatpurBFPA11:1311:15
5SHERGANJSNZ11:2411:26
6BisalpurBSUR11:3411:36
7MIGHAUNAMIW11:4211:44
8Chak Safaura HaltCKSR11:4911:51
9ZindpuraZNP11:5511:57
10Vazeerpur HaltVZPH12:0212:04
11NIGOHINOH12:1612:18
12DHAKIA TIWARIDOT12:2512:27
14ARELIARX12:3112:33
15KHIRIA KHURDKIE12:3812:40
17SHAHBAZNAGARSZN12:5612:58
18SHAHJAHANPUR JN.SPN13:30DST

Frequently Asked Questions — 05021 SPN INAUGURAL SPL

What time does 05021 (SPN INAUGURAL SPL) start from PILIBHIT JN?
It departs from PILIBHIT JN (PBE) at 10:45 and reaches SHAHJAHANPUR JN. (SPN) at 13:30.
What is the last station for 05021?
The final station of 05021 is SHAHJAHANPUR JN. (SPN), arriving at 13:30. You can see the full schedule and route map above.
Where is train number 05021 right now?
You can check the live location of 05021 (SPN INAUGURAL SPL) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 05021?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 05021 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 05021?
It covers a total distance of 89.2 km from PILIBHIT JN to SHAHJAHANPUR JN. in about 2 hours and 45 minutes.
On which days does 05021 run?
This train runs on: Mon. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.