RailRadar

RailRadar

08144
Rourkela Junction - Tatanagar Junction Passenger
Real-time tracking unavailable. Showing scheduled times.
Arrival
Day 1 - 28 Jun
Departure
08144MEMU

Rourkela Junction - Tatanagar Junction Passenger

Runs On

MonTueWedThuFriSatSun
Distance
163.2 km
Duration
4h 10m
Halts
21
Avg Speed
39.2 km/h
Max Speed
113 km/h
Return
08143
Arrival
Departure
Rourkela Junction
0.0 km
5:10AM5:10AM
5:13AM
Bondamunda K Cabin
4.4 km
5:13AM
5:15AM
Bondamunda
6.5 km
5:15AM
5:19AM
Bondamunda A Cabin
10.0 km
5:19AM
3 intermediate stations
5:24AM5:24AM
Bisra
14.1 km
5:26AM5:26AM
5:31AM5:31AM
Bhalulata
21.0 km
5:33AM5:33AM
5:39AM5:39AM
Jaraikela
28.5 km
5:41AM5:41AM
5:47AM5:47AM
Manoharpur
39.8 km
5:49AM5:49AM
5:54AM5:54AM
Ghaghra
45.0 km
5:56AM5:56AM
6:01AM6:01AM
Posoita
50.8 km
6:03AM6:03AM
6:09AM6:09AM
Derowan P. Halt
57.7 km
6:11AM6:11AM
6:17AM
Mahadevsal
62.5 km
6:17AM
1 intermediate station
6:24AM6:24AM
Goilkera
67.5 km
6:26AM6:26AM
6:32AM6:32AM
Tunia
74.8 km
6:34AM6:34AM
6:38AM6:38AM
Sonua
80.1 km
6:40AM6:40AM
6:48AM6:48AM
Lotapahar
91.6 km
6:50AM6:50AM
7:10AM7:10AM
Chakradharpur
101.0 km
7:15AM7:15AM
7:25AM7:25AM
Barabambo
111.8 km
7:27AM7:27AM
7:33AM
Rajkharsawan Outer Cabin
119.1 km
7:33AM
1 intermediate station
7:35AM7:35AM
Rajkharsawan Junction
121.2 km
7:37AM7:37AM
7:42AM7:42AM
Mahali Marup
128.7 km
7:44AM7:44AM
7:50AM7:50AM
Sini Junction
136.5 km
7:52AM7:52AM
7:58AM7:58AM
Birbans
143.4 km
8:00AM8:00AM
8:08AM8:08AM
Gamharia Junction
152.5 km
8:10AM8:10AM
8:16AM8:16AM
Adityapur
158.5 km
8:18AM8:18AM
9:20AM9:20AM
Tatanagar Junction
163.2 km
At Rourkela Junction
ScheduledSIMULATINGUpdated few seconds ago
ROUTATA
Next StopBZR14.1km - 5:24AM
To ReachTATA163.2km - 9:20AM

08144 Rourkela Junction - Tatanagar Junction Passenger runs from Rourkela Junction to Tatanagar Junction. It covers 163.2 km in 4h 10m, stopping at 21 stations. Departs Rourkela Junction at 05:10 and arrives at Tatanagar Junction at 09:20. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. This train runs on Sun.

08144 Schedule — 21 stops

IST
#StationArrDep
1Rourkela JunctionROUSRC05:10
5BisraBZR05:2405:26
6BhalulataBUL05:3105:33
7JaraikelaJRA05:3905:41
8ManoharpurMOU05:4705:49
9GhaghraGHAA05:5405:56
10PosoitaPST06:0106:03
11Derowan P. HaltDRWN06:0906:11
13GoilkeraGOL06:2406:26
14TuniaTUX06:3206:34
15SonuaSWR06:3806:40
16LotapaharLPH06:4806:50
17ChakradharpurCKP07:1007:15
18BarabamboBRM07:2507:27
20Rajkharsawan JunctionRKSN07:3507:37
21Mahali MarupMMV07:4207:44
22Sini JunctionSINI07:5007:52
23BirbansBRBS07:5808:00
24Gamharia JunctionGMH08:0808:10
25AdityapurADTP08:1608:18
26Tatanagar JunctionTATA09:20DST

About 08144 Rourkela Junction - Tatanagar Junction Passenger

What time does Rourkela Junction - Tatanagar Junction Passenger depart from Rourkela Junction?
Rourkela Junction - Tatanagar Junction Passenger departs from Rourkela Junction (ROU) at 05:10 and arrives at Tatanagar Junction at 09:20. Check live status for today's actual departure time and delays.
What is the last stop of 08144 Rourkela Junction - Tatanagar Junction Passenger?
The final destination is Tatanagar Junction (TATA), scheduled arrival at 09:20. Track the train's exact progress on the map above.
How long is the journey from Rourkela Junction to Tatanagar Junction?
Rourkela Junction - Tatanagar Junction Passenger covers 163.2 km from Rourkela Junction to Tatanagar Junction in 4h 10m, with 21 stops along the route.
On which days does Rourkela Junction - Tatanagar Junction Passenger run?
Rourkela Junction - Tatanagar Junction Passenger runs Sun. Always verify on the day of travel — Indian Railways may announce cancellations or rescheduling on short notice.
Where is Rourkela Junction - Tatanagar Junction Passenger right now?
The current position of Rourkela Junction - Tatanagar Junction Passenger is shown on the live map at the top of this page. RailRadar uses crowdsourced GPS from passengers on board, updated every 30 seconds — much faster than traditional NTES station reports.
Why does the train show delayed or offline?
Delays occur due to track congestion, signal failures, priority to faster trains, or late source departure. 'Offline' means no passengers are currently sharing GPS data — status updates automatically when data becomes available.

More trains: from Rourkela Junction·to Tatanagar Junction·RourkelaTatanagar direct trains

RailRadar is not affiliated with Indian Railways, IRCTC, or NTES. Live status is crowdsourced and may differ from official NTES data. Always confirm platform numbers at the station.