RailRadar LogoRailRadar

11100 Train Running Status Today — Mumbai LTT Express

11100
Mumbai LTT Express
Arrival
Day 1 - 18 Jul
Departure
11100Mail/Express

Mumbai LTT Express

Runs On

MonTueWedThuFriSatSun
Distance
567.9 km
Duration
12h 15m
Halts
12
Avg Speed
46.4 km/h
Max Speed
69.8 km/h
Return
11099
Arrival
Day 1 - Jul 18
Departure
MADGAON JUNCTION
0.0 km
11:30AM11:52AM
11:35AM
SURAVALI
4.4 km
11:35AM
11:38AM
MAJORDA JUNCTION
7.6 km
11:38AM
11:43AM12:09PM
VERNA
12.5 km
11:43AM12:16PM
12:00PM12:29PM
KARMALI
28.6 km
12:02PM12:44PM
12:20PM12:55PM
THIVIM
47.1 km
12:22PM1:09PM
12:32PM1:16PM
PERNEM
58.1 km
12:32PM1:23PM
12:43PM
MADURE
69.0 km
12:43PM
12:50PM1:47PM
SAWANTWADI ROAD
76.6 km
12:52PM1:49PM
1:04PM
ZARAP
87.2 km
1:04PM
1:16PM
KUDAL
97.5 km
1:16PM
1:28PM
SINDHUDURG
108.1 km
1:28PM
1:48PM2:45PM
KANKAVALI
125.8 km
1:50PM2:47PM
2:12PM
NANDGAON ROAD
141.3 km
2:12PM
2:22PM
ACHIRNE
148.0 km
2:22PM
2:35PM
VAIBHAVWADI ROAD
156.9 km
2:35PM
2:46PM
KHAREPATAN ROAD
165.1 km
2:46PM
2:58PM
RAJAPUR ROAD
173.5 km
2:58PM
3:09PM
SAUNDAL
180.9 km
3:09PM
3:22PM
VILAVADE
190.2 km
3:22PM
3:30PM
VERAVALI
195.6 km
3:30PM
3:45PM
ADAVALI
205.8 km
3:45PM
4:08PM
NIVASAR
222.1 km
4:08PM
4:30PM5:27PM
RATNAGIRI
237.3 km
4:35PM5:32PM
4:42PM
BHOKE
244.0 km
4:42PM
4:56PM
UKSHI
256.5 km
4:56PM
5:10PM
SANGAMESHWAR ROAD
270.2 km
5:10PM
5:18PM
KADAVAI
277.6 km
5:18PM
5:25PM
ARAVALI ROAD
284.2 km
5:25PM
5:36PM
SAVARDA
294.6 km
5:36PM
5:46PM
KAMATHE
303.3 km
5:46PM
5:56PM6:53PM
CHIPLUN
313.0 km
5:58PM6:55PM
6:13PM
ANJANI
329.3 km
6:13PM
6:26PM7:23PM
KHED
342.7 km
6:28PM7:25PM
6:37PM
KALAMBANI BUDRUK
350.2 km
6:37PM
6:50PM
DIWAN KHAVATI
360.3 km
6:50PM
7:00PM
VINHERE
368.2 km
7:00PM
7:12PM
KARANJADI
378.2 km
7:12PM
7:21PM
SAPE WAMNE
385.8 km
7:21PM
7:31PM
VEER
393.8 km
7:31PM
7:39PM
GOREGAON ROAD
399.9 km
7:39PM
7:52PM
MANGAON
410.3 km
7:52PM
8:00PM
INDAPUR
416.9 km
8:00PM
8:13PM
KOLAD
427.6 km
8:13PM
8:30PM9:27PM
ROHA
441.2 km
8:33PM9:30PM
8:37PM
NIDI
446.2 km
8:37PM
8:46PM
NAGOTHANE
456.3 km
8:46PM
9:37PM10:34PM
PANVEL
515.7 km
9:40PM10:37PM
9:43PM
KHANDESHWAR
518.4 km
9:43PM
9:45PM
MANSAROVAR
519.9 km
9:45PM
9:48PM
KHARGHAR
522.2 km
9:48PM
9:50PM
BELAPUR CBD
524.0 km
9:50PM
9:52PM
SEAWOODSDARAVE
525.9 km
9:52PM
9:54PM
NERUL
527.0 km
9:54PM
9:56PM
JUINAGAR
529.0 km
9:56PM
9:58PM
TURBHE
530.8 km
9:58PM
10:01PM
KOPAR KHAIRANE
533.3 km
10:01PM
10:03PM
GHANSOLI
534.4 km
10:03PM
10:05PM
RABALE
536.3 km
10:05PM
10:11PM
DIGHA GAON
541.6 km
10:11PM
10:13PM
AIROLI
543.2 km
10:13PM
10:16PM
THANE C CABIN
545.9 km
10:16PM
10:23PM11:20PM
THANE
551.3 km
10:25PM11:22PM
10:38PM
MULUND
553.9 km
10:38PM
10:43PM
MULUND DEPOT
555.0 km
10:43PM
10:48PM
NAHUR
556.2 km
10:48PM
10:56PM
BHANDUP
557.8 km
10:56PM
11:05PM
KANJUR MARG
559.7 km
11:05PM
11:15PM
VIKHROLI
561.6 km
11:15PM
11:32PM
GHATKOPAR
565.3 km
11:32PM
11:45PM12:42AM
MUMBAI LTT
567.9 km
Departed PERNEM
52m LateUpdated few seconds ago
MAOLTT
Next StopSWV76.6km - 1:47PM
To ReachLTT567.9km - 12:42AM
Delayed by 52 minutes at PERN

11100 Mumbai LTT Express runs from MADGAON JUNCTION to MUMBAI LTT. It covers 567.9 km in 12h 15m, stopping at 12 stations. Departs MADGAON JUNCTION at 11:30 and arrives at MUMBAI LTT at 23:45. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. This train runs on Mon, Sat.

11100 Schedule — 12 stops

IST
#StationArrDep
1MADGAON JUNCTIONMAOSRC11:30
5KARMALIKRMI12:0012:02
6THIVIMTHVM12:2012:22
9SAWANTWADI ROADSWV12:5012:52
13KANKAVALIKKW13:4813:50
24RATNAGIRIRN16:3016:35
32CHIPLUNCHI17:5617:58
34KHEDKHED18:2618:28
45ROHAROHA20:3020:33
48PANVELPNVL21:3721:40
63THANETNA22:2322:25
71MUMBAI LTTLTT23:45DST

Frequently Asked Questions — 11100 Mumbai LTT Express

What time does 11100 (Mumbai LTT Express) start from MADGAON JUNCTION?
It departs from MADGAON JUNCTION (MAO) at 11:30 and reaches MUMBAI LTT (LTT) at 23:45.
What is the last station for 11100?
The final station of 11100 is MUMBAI LTT (LTT), arriving at 23:45. You can see the full schedule and route map above.
Where is train number 11100 right now?
You can check the live location of 11100 (Mumbai LTT Express) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 11100?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 11100 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 11100?
It covers a total distance of 567.9 km from MADGAON JUNCTION to MUMBAI LTT in about 12 hours and 15 minutes.
On which days does 11100 run?
This train runs on: Mon, Sat. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.