RailRadar LogoRailRadar

12814 Train Running Status Today — Steel Express

12814
Steel Express
Arrival
Day 1 - 19 Jul
Departure
12814Superfast Express

Steel Express

Runs On

MonTueWedThuFriSatSun
Distance
250 km
Duration
4h 30m
Halts
9
Avg Speed
55.6 km/h
Max Speed
88.6 km/h
Return
12813
Arrival
Day 1 - Jul 19
Departure
TATANAGAR JUNCTION
0.0 km
6:05AM6:05AM
6:09AM
SALGA JHARI WEST CABIN
2.9 km
6:09AM
6:15AM
GOVINDPUR PH
6.7 km
6:15AM
6:26AM
ASANBONI
14.2 km
6:26AM
6:33AM6:33AM
RAKHA MINES
19.0 km
6:35AM6:35AM
6:40AM
GALUDIH
26.0 km
6:40AM
6:47AM6:47AM
GHATSILA
36.0 km
6:49AM6:49AM
6:53AM
CHIRUGODA
42.2 km
6:53AM
6:57AM
DHALBHUMGARH
48.2 km
6:57AM
7:04AM
KOKPARA
57.8 km
7:04AM
7:10AM7:10AM
CHAKULIA
67.0 km
7:12AM7:12AM
7:16AM
KANIMAHULI PH
73.0 km
7:16AM
7:21AM
GIDHNI
80.5 km
7:21AM
7:27AM
KHATKURA
88.7 km
7:27AM
7:32AM7:32AM
JHARGRAM
96.0 km
7:34AM7:34AM
7:40AM
BANSTALA
103.4 km
7:40AM
7:47AM7:47AM
SARDIHA
111.0 km
7:48AM7:48AM
7:58AM
KHEMASULI
118.3 km
7:58AM
8:07AM
KALAIKUNDA
125.3 km
8:07AM
8:10AM
NIMPURA MARSHALLING YARD
127.6 km
8:10AM
8:18AM8:18AM
KHARAGPUR JUNCTION
134.0 km
8:20AM8:20AM
8:25AM
JAKPUR
141.2 km
8:25AM
8:30AM
MADPUR
147.1 km
8:30AM
8:34AM
SHYAM CHAK
153.2 km
8:34AM
8:38AM
BALICHAK
158.6 km
8:38AM
8:41AM
DUAN
162.0 km
8:41AM
8:43AM
RADHAMOHANPUR
165.0 km
8:43AM
8:46AM
HAUR
169.5 km
8:46AM
8:49AM
KHIRAI
173.9 km
8:49AM
8:53AM
PANSKURA JUNCTION
179.2 km
8:53AM
8:55AM
PANSKURA EAST OUTER CABIN
181.5 km
8:55AM
8:56AM
NARAYAN PAKURIA MURAIL
182.6 km
8:56AM
8:58AM
BHOGPUR
186.2 km
8:58AM
9:00AM
NANDAIGAJAN P.H.
188.7 km
9:00AM
9:02AM
MECHEDA
191.6 km
9:02AM
9:05AM
KOLAGHAT
195.0 km
9:05AM
9:08AM
DEULTI
199.2 km
9:08AM
9:10AM
GHORAGHATA
202.3 km
9:10AM
9:12AM
BAGNAN
205.0 km
9:12AM
9:16AM
KULGACHIA
210.5 km
9:16AM
9:19AM
BIR SHIBPUR
214.0 km
9:19AM
9:22AM
ULUBERIA
218.2 km
9:22AM
9:24AM
FULESWAR
220.6 km
9:24AM
9:25AM
CHENGEL
223.2 km
9:25AM
9:28AM
BAURIA
226.4 km
9:28AM
9:31AM
NALPUR
230.2 km
9:31AM
9:32AM
ABADA
232.7 km
9:32AM
9:34AM
SANKRAIL
234.7 km
9:34AM
9:37AM
ANDUL
238.3 km
9:37AM
9:38AM
MAURIGRAM
240.1 km
9:38AM
9:40AM9:40AM
SANTRAGACHI JUNCTION
243.0 km
9:42AM9:42AM
9:57AM
DASNAGAR
244.9 km
9:57AM
10:01AM
RAMRAJATALA
245.5 km
10:01AM
10:10AM
PADMAPUKUR
246.7 km
10:10AM
10:28AM
TIKIAPARA
249.0 km
10:28AM
10:33AM
HWMM STATION
249.7 km
10:33AM
10:35AM10:35AM
HOWRAH JUNCTION
250.0 km
At TATANAGAR JUNCTION
ScheduledUpdated few seconds ago
TATAHWH
Next StopRHE19km - 6:33AM
To ReachHWH250km - 10:35AM

12814 Steel Express runs from TATANAGAR JUNCTION to HOWRAH JUNCTION. It covers 250 km in 4h 30m, stopping at 9 stations. Departs TATANAGAR JUNCTION at 06:05 and arrives at HOWRAH JUNCTION at 10:35. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.

12814 Schedule — 9 stops

IST
#StationArrDep
1TATANAGAR JUNCTIONTATASRC06:05
5RAKHA MINESRHE06:3306:35
7GHATSILAGTS06:4706:49
11CHAKULIACKU07:1007:12
15JHARGRAMJGM07:3207:34
17SARDIHASUA07:4707:48
21KHARAGPUR JUNCTIONKGP08:1808:20
51SANTRAGACHI JUNCTIONSRC09:4009:42
57HOWRAH JUNCTIONHWH10:35DST

Frequently Asked Questions — 12814 Steel Express

What time does 12814 (Steel Express) start from TATANAGAR JUNCTION?
It departs from TATANAGAR JUNCTION (TATA) at 06:05 and reaches HOWRAH JUNCTION (HWH) at 10:35.
What is the last station for 12814?
The final station of 12814 is HOWRAH JUNCTION (HWH), arriving at 10:35. You can see the full schedule and route map above.
Where is train number 12814 right now?
You can check the live location of 12814 (Steel Express) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 12814?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 12814 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 12814?
It covers a total distance of 250 km from TATANAGAR JUNCTION to HOWRAH JUNCTION in about 4 hours and 30 minutes.
On which days does 12814 run?
This train runs on: Daily. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.