13330 Train Running Status Today — Ganga Damodar Express
13330
Ganga Damodar Express13330
Ganga Damodar ExpressArrival
Day 1 - 18 Jul
Departure
13330Mail/Express
Ganga Damodar Express
Runs On
MonTueWedThuFriSatSun
Distance
291 kmDuration
6hHalts
11Avg Speed
48.5 km/hMax Speed
101.5 km/hReturn
13329Arrival
Day 1 - Jul 18
Departure
PATNA JUNCTION
0.0 km•
11:20PM11:20PM
11:25PM
PARSA BAZAR
6.0 km
11:25PM
11:28PM
RAMGOVINDSINGH MAHULI HALT
9.4 km
11:28PM
11:31PM
PUNPUN
12.7 km
11:31PM
11:34PM
MARANCHI HALT
17.2 km
11:34PM
11:39PM
NEMA HALT
23.2 km
11:39PM
11:44PM
MASAUDHI COURT HALT
28.4 km
11:44PM
11:45PM11:45PM
TAREGNA
30.0 km•
11:47PM11:47PM
11:50PM
CHHOTAKI MASAUDHI HALT
32.7 km
11:50PM
11:52PM
TENERI HALT
34.8 km
11:52PM
11:54PM
NADAUL
36.7 km
11:54PM
11:55PM
SEONAN HALT
38.4 km
11:55PM
11:58PM
KARONA HALT
40.7 km
11:58PM
Day 2 - Sun, Jul 19
12:02AM12:02AM
JEHANABAD
45.0 km•
12:04AM12:04AM
12:14AM
MAI HALT
51.3 km
12:14AM
12:21AM
MIRA BIGHA HALT
55.6 km
12:21AM
12:24AM
TEHTA
57.6 km
12:24AM
12:31AM
MAKHDUMPUR GAYA
61.5 km
12:31AM
12:34AM
WANAWAR KOTESHWARNATH DHAM
63.2 km
12:34AM
12:35AM
WW STATION
64.0 km
12:35AM
12:38AM
NER HALT
65.8 km
12:38AM
12:43AM
BARABAR HALT
69.3 km
12:43AM
12:48AM
BELA
72.4 km
12:48AM
12:56AM
NEYAMATPUR
76.9 km
12:56AM
12:58AM
ORE HALT
78.5 km
12:58AM
1:04AM
CHAKAND
82.3 km
1:04AM
1:20AM1:20AM
GAYA JUNCTION
92.0 km•
1:40AM1:40AM
1:46AM
MANPUR BYPASS CABIN
98.6 km
1:46AM
1:58AM
TANKUPPA
110.9 km
1:58AM
2:04AM
BANSINALA HALT
117.5 km
2:04AM
2:10AM
PAHARPUR
124.6 km
2:10AM
2:22AM
GURPA
137.4 km
2:22AM
2:30AM
BASKATWA B. H.
145.2 km
2:30AM
2:39AM
LALBAG BLOCK HUT
155.3 km
2:39AM
2:51AM2:51AM
KODERMA JUNCTION
168.0 km•
2:53AM2:53AM
2:55AM
LARABAD BLOCK HUT
171.8 km
2:55AM
2:59AM
HIRODIH
177.1 km
2:59AM
3:03AM
SARMATANR
184.7 km
3:03AM
3:06AM
YADUDIH
189.4 km
3:06AM
3:09AM3:09AM
PARSABAD
194.0 km•
3:11AM3:11AM
3:15AM
DASARA
200.5 km
3:15AM
3:18AM
CHAUBE
205.5 km
3:18AM
3:21AM
KESHWARI
210.3 km
3:21AM
3:24AM3:24AM
HAZARIBAGH ROAD
216.0 km•
3:26AM3:26AM
3:30AM
GAREA BIHAR
221.0 km
3:30AM
3:33AM
CHICHAKI
225.7 km
3:33AM
3:36AM
KARMABAD
229.8 km
3:36AM
3:38AM
CHAUDHRIBANDH
233.6 km
3:38AM
3:42AM
CHEGRO
238.7 km
3:42AM
3:45AM3:45AM
PARASNATH
243.0 km•
3:47AM3:47AM
3:57AM
NIMIAGHAT
250.6 km
3:57AM
4:04AM
BHOLIDIH
256.2 km
4:04AM
4:10AM4:10AM
NSCB JUNCTION GOMOH
261.0 km•
4:15AM4:15AM
4:19AM
KHARIO P.H.
266.4 km
4:19AM
4:22AM
MATARI
270.7 km
4:22AM
4:25AM
NICHITPUR
275.0 km
4:25AM
4:27AM
KATRASGARH
278.0 km
4:27AM
4:30AM4:30AM
TETULMARI
282.0 km•
4:32AM4:32AM
5:20AM5:20AM
DHANBAD JUNCTION
291.0 km•
At PATNA JUNCTION
ScheduledUpdated few seconds ago
PNBEDHN
Next StopTEA30km - 11:45PM
To ReachDHN291km - 5:20AM
13330 Ganga Damodar Express runs from PATNA JUNCTION to DHANBAD JUNCTION. It covers 291 km in 6h, stopping at 11 stations. Departs PATNA JUNCTION at 23:20 and arrives at DHANBAD JUNCTION at 05:20. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.
13330 Schedule — 11 stops
IST| # | Station | Arr | Dep |
|---|---|---|---|
| 1 | PATNA JUNCTIONPNBE | SRC | 23:20 |
| 8 | TAREGNATEA | 23:45 | 23:47 |
| 14 | JEHANABADJHD | 00:02 | 00:04 |
| 27 | GAYA JUNCTIONGAYA | 01:20 | 01:40 |
| 35 | KODERMA JUNCTIONKQR | 02:51 | 02:53 |
| 40 | PARSABADPSB | 03:09 | 03:11 |
| 44 | HAZARIBAGH ROADHZD | 03:24 | 03:26 |
| 50 | PARASNATHPNME | 03:45 | 03:47 |
| 53 | NSCB JUNCTION GOMOHGMO | 04:10 | 04:15 |
| 58 | TETULMARITET | 04:30 | 04:32 |
| 59 | DHANBAD JUNCTIONDHN | 05:20 | DST |
Frequently Asked Questions — 13330 Ganga Damodar Express
- What time does 13330 (Ganga Damodar Express) start from PATNA JUNCTION?
- It departs from PATNA JUNCTION (PNBE) at 23:20 and reaches DHANBAD JUNCTION (DHN) at 05:20.
- What is the last station for 13330?
- The final station of 13330 is DHANBAD JUNCTION (DHN), arriving at 05:20. You can see the full schedule and route map above.
- Where is train number 13330 right now?
- You can check the live location of 13330 (Ganga Damodar Express) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
- How accurate is the running status for train 13330?
- The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
- Why is train 13330 showing offline or not updating?
- If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
- What is the total travel distance of 13330?
- It covers a total distance of 291 km from PATNA JUNCTION to DHANBAD JUNCTION in about 6 hours and 0 minutes.
- On which days does 13330 run?
- This train runs on: Daily. Please verify the running status before leaving for the station.
Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.