22819 Train Running Status Today — Visakhapatnam Intercity SF Express
22819
Visakhapatnam Intercity SF Express22819
Visakhapatnam Intercity SF ExpressArrival
Day 1 - 19 Jul
Departure
22819Superfast Express
Visakhapatnam Intercity SF Express
Runs On
MonTueWedThuFriSatSun
Distance
456 kmDuration
8h 15mHalts
30Avg Speed
55.3 km/hMax Speed
120 km/hReturn
22820Arrival
Day 1 - Jul 19
Departure
BHUBANESWAR NEW
0.0 km•
7:15AM7:15AM
7:17AM
PATIA P.H.
3.4 km
7:17AM
7:18AM7:18AM
MANCHESWAR
6.0 km•
7:19AM7:19AM
7:22AM
VANI VIHAR
9.6 km
7:22AM
7:25AM7:25AM
BHUBANESWAR
13.0 km•
7:45AM7:45AM
7:49AM
LINGARAJ TEMPLE ROAD
17.5 km
7:49AM
7:51AM
SARKANTRA
20.6 km
7:51AM
7:54AM
RETANG
24.5 km
7:54AM
8:00AM8:00AM
KHURDA ROAD JUNCTION
32.0 km•
8:05AM8:05AM
8:07AM
JAMUNA BLOCK HUT JUNCTION CABIN
35.5 km
8:07AM
8:08AM
ARGUL P.H.
37.1 km
8:08AM
8:11AM
KAIPADAR ROAD
41.0 km
8:11AM
8:14AM
DHAULI MUHAN
45.5 km
8:14AM
8:16AM
TAPANG
49.5 km
8:16AM
8:19AM
GOLABAI
54.0 km
8:19AM
8:22AM8:22AM
NIRAKARPUR
58.0 km•
8:23AM8:23AM
8:30AM8:30AM
BHUSANDPUR
65.0 km•
8:31AM8:31AM
8:34AM
MUKTESWAR PH
70.7 km
8:34AM
8:37AM8:37AM
KALUPARA GHAT
75.0 km•
8:38AM8:38AM
8:45AM8:45AM
KUHURI
82.0 km•
8:46AM8:46AM
8:53AM8:53AM
GANGADHARPUR
90.0 km•
8:54AM8:54AM
8:58AM
SOLARI
95.1 km
8:58AM
9:04AM9:04AM
BALUGAON
103.0 km•
9:05AM9:05AM
9:11AM9:11AM
CHILKA
110.0 km•
9:12AM9:12AM
9:16AM
KALIJAI
115.2 km
9:16AM
9:20AM9:20AM
KHALLIKOT
120.0 km•
9:21AM9:21AM
9:30AM9:30AM
RAMBHA
131.0 km•
9:31AM9:31AM
9:39AM
HUMMA
141.9 km
9:39AM
9:43AM9:43AM
GANJAM
148.0 km•
9:44AM9:44AM
9:50AM
CHATRAPUR COURT
156.0 km
9:50AM
9:51AM9:51AM
CHATRAPUR
157.0 km•
9:52AM9:52AM
9:53AM
CHATRAPUR COURT
157.9 km
9:53AM
9:57AM
NARASIMHAPURA
164.8 km
9:57AM
10:01AM
JAGANNATHPUR
171.0 km
10:01AM
10:06AM10:06AM
BRAHMAPUR
179.0 km•
10:11AM10:11AM
10:14AM
JAGANNATHPUR
182.0 km
10:14AM
10:15AM
NARASIMHAPURA
184.3 km
10:15AM
10:17AM
CHATRAPUR COURT
186.7 km
10:17AM
10:18AM
CHATRAPUR
187.2 km
10:18AM
10:27AM
GOLANTHRA
198.3 km
10:27AM
10:29AM
SURLA ROAD
200.1 km
10:29AM
10:31AM10:31AM
ICHCHAPURAM
203.0 km•
10:32AM10:32AM
10:40AM
JHADUPUDI
214.8 km
10:40AM
10:44AM10:44AM
SOMPETA
221.0 km•
10:45AM10:45AM
10:50AM10:50AM
BARUVA
230.0 km•
10:51AM10:51AM
10:59AM
SUMMADEVI
238.1 km
10:59AM
11:01AM11:01AM
MANDASA ROAD
240.0 km•
11:02AM11:02AM
11:25AM
SUMMADEVI
245.8 km
11:25AM
11:55AM11:55AM
PALASA
253.0 km•
11:57AM11:57AM
12:10PM
PUNDI
264.9 km
12:10PM
12:16PM
ROUTHPURAM HALT
271.0 km
12:16PM
12:24PM12:24PM
NAUPADA JUNCTION
278.0 km•
12:25PM12:25PM
12:26PM
DINDU GOPALA PURAM HALT
280.0 km
12:26PM
12:33PM
HARISCHANDRAPURAM
289.1 km
12:33PM
12:35PM12:35PM
KOTABOMMALI
292.0 km•
12:36PM12:36PM
12:41PM
HARISCHANDRAPURAM
300.5 km
12:41PM
12:45PM12:45PM
TILARU
306.0 km•
12:46PM12:46PM
12:55PM
URLAM
315.5 km
12:55PM
1:05PM1:05PM
SRIKAKULAM ROAD
325.0 km•
1:07PM1:07PM
1:12PM
DUSI
331.7 km
1:12PM
1:19PM1:19PM
PONDURU
341.0 km•
1:20PM1:20PM
1:23PM
DUSI
345.5 km
1:23PM
1:32PM
SIGADAM
357.2 km
1:32PM
1:35PM
BATUVA PH
360.6 km
1:35PM
1:37PM1:37PM
CHIPURUPALLE
364.0 km•
1:38PM1:38PM
1:40PM
GARIVIDI
366.3 km
1:40PM
1:43PM
GUJJANGIVALASA
369.5 km
1:43PM
1:44PM
NELLIMARLA
370.8 km
1:44PM
1:46PM
VIZIANAGARAM BYPASS CABIN A
372.8 km
1:46PM
1:53PM
ALAMANDA
381.5 km
1:53PM
1:56PM
KANTAKAPALLE
384.8 km
1:56PM
2:02PM
KORUKONDA
391.2 km
2:02PM
2:05PM2:05PM
VIZIANAGARAM JUNCTION
395.0 km•
2:10PM2:10PM
2:18PM
KORUKONDA
405.7 km
2:18PM
2:23PM
ALAMANDA
412.9 km
2:23PM
2:30PM
KANTAKAPALLE
422.1 km
2:30PM
2:36PM
KOTTAVALASA JUNCTION
430.1 km
2:36PM
2:43PM
PENDURTI
438.8 km
2:43PM
2:49PM
SIMHACHALAM NORTH
446.6 km
2:49PM
2:50PM2:50PM
SIMHACHALAM
448.0 km•
2:52PM2:52PM
2:58PM
GOPALAPATNAM
449.3 km
2:58PM
3:09PM
MARRIPALEM PH
451.5 km
3:09PM
3:26PM
VISAKHAPATNAM ELECTRIC LOCO SHED
455.2 km
3:26PM
3:30PM3:30PM
VISAKHAPATNAM JUNCTION
456.0 km•
At BHUBANESWAR NEW
ScheduledUpdated few seconds ago
BBSNVSKP
Next StopMCS6km - 7:18AM
To ReachVSKP456km - 3:30PM
22819 Visakhapatnam Intercity SF Express runs from BHUBANESWAR NEW to VISAKHAPATNAM JUNCTION. It covers 456 km in 8h 15m, stopping at 30 stations. Departs BHUBANESWAR NEW at 07:15 and arrives at VISAKHAPATNAM JUNCTION at 15:30. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.
22819 Schedule — 30 stops
IST| # | Station | Arr | Dep |
|---|---|---|---|
| 1 | BHUBANESWAR NEWBBSN | SRC | 07:15 |
| 3 | MANCHESWARMCS | 07:18 | 07:19 |
| 5 | BHUBANESWARBBS | 07:25 | 07:45 |
| 9 | KHURDA ROAD JUNCTIONKUR | 08:00 | 08:05 |
| 16 | NIRAKARPURNKP | 08:22 | 08:23 |
| 17 | BHUSANDPURBSDP | 08:30 | 08:31 |
| 19 | KALUPARA GHATKAPG | 08:37 | 08:38 |
| 20 | KUHURIKUU | 08:45 | 08:46 |
| 21 | GANGADHARPURGNGD | 08:53 | 08:54 |
| 23 | BALUGAONBALU | 09:04 | 09:05 |
| 24 | CHILKACLKA | 09:11 | 09:12 |
| 26 | KHALLIKOTKIT | 09:20 | 09:21 |
| 27 | RAMBHARBA | 09:30 | 09:31 |
| 29 | GANJAMGAM | 09:43 | 09:44 |
| 31 | CHATRAPURCAP | 09:51 | 09:52 |
| 35 | BRAHMAPURBAM | 10:06 | 10:11 |
| 42 | ICHCHAPURAMIPM | 10:31 | 10:32 |
| 44 | SOMPETASPT | 10:44 | 10:45 |
| 45 | BARUVABAV | 10:50 | 10:51 |
| 47 | MANDASA ROADMMS | 11:01 | 11:02 |
| 49 | PALASAPSA | 11:55 | 11:57 |
| 52 | NAUPADA JUNCTIONNWP | 12:24 | 12:25 |
| 55 | KOTABOMMALIKBM | 12:35 | 12:36 |
| 57 | TILARUTIU | 12:45 | 12:46 |
| 59 | SRIKAKULAM ROADCHE | 13:05 | 13:07 |
| 61 | PONDURUPDU | 13:19 | 13:20 |
| 65 | CHIPURUPALLECPP | 13:37 | 13:38 |
| 73 | VIZIANAGARAM JUNCTIONVZM | 14:05 | 14:10 |
| 80 | SIMHACHALAMSCM | 14:50 | 14:52 |
| 84 | VISAKHAPATNAM JUNCTIONVSKP | 15:30 | DST |
Frequently Asked Questions — 22819 Visakhapatnam Intercity SF Express
- What time does 22819 (Visakhapatnam Intercity SF Express) start from BHUBANESWAR NEW?
- It departs from BHUBANESWAR NEW (BBSN) at 07:15 and reaches VISAKHAPATNAM JUNCTION (VSKP) at 15:30.
- What is the last station for 22819?
- The final station of 22819 is VISAKHAPATNAM JUNCTION (VSKP), arriving at 15:30. You can see the full schedule and route map above.
- Where is train number 22819 right now?
- You can check the live location of 22819 (Visakhapatnam Intercity SF Express) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
- How accurate is the running status for train 22819?
- The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
- Why is train 22819 showing offline or not updating?
- If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
- What is the total travel distance of 22819?
- It covers a total distance of 456 km from BHUBANESWAR NEW to VISAKHAPATNAM JUNCTION in about 8 hours and 15 minutes.
- On which days does 22819 run?
- This train runs on: Daily. Please verify the running status before leaving for the station.
Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.