31344 Train Running Status Today — Kalyani - Sealdah AC Local
31344
Kalyani - Sealdah AC Local31344
Kalyani - Sealdah AC LocalArrival
Day 1 - 18 Jul
Departure
31344Suburban
Kalyani - Sealdah AC Local
Runs On
MonTueWedThuFriSatSun
Distance
51 kmDuration
1h 18mHalts
11Avg Speed
39.2 km/hMax Speed
60 km/hReturn
31343Arrival
Day 1 - Jul 18
Departure
KALYANI
0.0 km•
5:02PM5:02PM
5:05PM5:05PM
KANCHRAPARA
3.0 km•
5:06PM5:06PM
5:08PM
KANCHRAPARA WORKSHOP GATE
4.4 km
5:08PM
5:11PM
HALISAHAR
6.0 km
5:11PM
5:18PM5:18PM
NAIHATI JUNCTION
10.0 km•
5:19PM5:19PM
5:21PM
ER STORE DEPOT NAIHATI
11.6 km
5:21PM
5:22PM
KANKINARA
12.7 km
5:22PM
5:24PM
JAGADDAL
14.8 km
5:24PM
5:27PM5:27PM
SHYAMNAGAR
18.0 km•
5:28PM5:28PM
5:31PM
ICHHAPUR
20.6 km
5:31PM
5:33PM
PALTA
22.1 km
5:33PM
5:38PM5:38PM
BARRACKPORE
26.0 km•
5:39PM5:39PM
5:39PM
TITAGARH
26.3 km
5:39PM
5:41PM
BELGHARIA
27.7 km
5:41PM
5:43PM
AGARPARA
29.3 km
5:43PM
5:43PM
SODPUR
29.6 km
5:43PM
5:44PM5:44PM
KHARDAHA
30.0 km•
5:45PM5:45PM
5:47PM
BELGHARIA
31.6 km
5:47PM
5:48PM
AGARPARA
31.8 km
5:48PM
5:48PM5:48PM
SODPUR
32.0 km•
5:49PM5:49PM
5:50PM
AGARPARA
32.8 km
5:50PM
5:55PM5:55PM
BELGHARIA
37.0 km•
5:56PM5:56PM
6:03PM6:03PM
DUM DUM JUNCTION
41.0 km•
6:04PM6:04PM
6:07PM6:07PM
BIDHAN NAGAR ROAD
44.0 km•
6:08PM6:08PM
6:13PM
KANKURGACHHI ROAD CABIN
46.9 km
6:13PM
6:16PM
NARKELDANGA COACHING YARD
48.5 km
6:16PM
6:20PM6:20PM
SEALDAH
51.0 km•
At KALYANI
ScheduledUpdated few seconds ago
KYISDAH
Next StopKPA3km - 5:05PM
To ReachSDAH51km - 6:20PM
31344 Kalyani - Sealdah AC Local runs from KALYANI to SEALDAH. It covers 51 km in 1h 18m, stopping at 11 stations. Departs KALYANI at 17:02 and arrives at SEALDAH at 18:20. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. This train runs on Mon, Tue, Wed, Thu, Fri, Sat.
31344 Schedule — 11 stops
IST| # | Station | Arr | Dep |
|---|---|---|---|
| 1 | KALYANIKYI | SRC | 17:02 |
| 2 | KANCHRAPARAKPA | 17:05 | 17:06 |
| 5 | NAIHATI JUNCTIONNH | 17:18 | 17:19 |
| 9 | SHYAMNAGARSNR | 17:27 | 17:28 |
| 12 | BARRACKPOREBP | 17:38 | 17:39 |
| 17 | KHARDAHAKDH | 17:44 | 17:45 |
| 20 | SODPURSEP | 17:48 | 17:49 |
| 22 | BELGHARIABLH | 17:55 | 17:56 |
| 23 | DUM DUM JUNCTIONDDJ | 18:03 | 18:04 |
| 24 | BIDHAN NAGAR ROADBNXR | 18:07 | 18:08 |
| 27 | SEALDAHSDAH | 18:20 | DST |
Frequently Asked Questions — 31344 Kalyani - Sealdah AC Local
- What time does 31344 (Kalyani - Sealdah AC Local) start from KALYANI?
- It departs from KALYANI (KYI) at 17:02 and reaches SEALDAH (SDAH) at 18:20.
- What is the last station for 31344?
- The final station of 31344 is SEALDAH (SDAH), arriving at 18:20. You can see the full schedule and route map above.
- Where is train number 31344 right now?
- You can check the live location of 31344 (Kalyani - Sealdah AC Local) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
- How accurate is the running status for train 31344?
- The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
- Why is train 31344 showing offline or not updating?
- If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
- What is the total travel distance of 31344?
- It covers a total distance of 51 km from KALYANI to SEALDAH in about 1 hours and 18 minutes.
- On which days does 31344 run?
- This train runs on: Mon, Tue, Wed, Thu, Fri, Sat. Please verify the running status before leaving for the station.
Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.