RailRadar LogoRailRadar

31419 Train Running Status Today — Sealdah - Naihati Local

31419
Sealdah - Naihati Local
Arrival
Day 1 - 18 Jul
Departure
31419Suburban

Sealdah - Naihati Local

Runs On

MonTueWedThuFriSatSun
Distance
41 km
Duration
1h 1m
Halts
15
Avg Speed
40.3 km/h
Max Speed
120 km/h
Return
31420
Arrival
Day 1 - Jul 18
Departure
SEALDAH
0.0 km
10:45AM
10:47AM
NARKELDANGA COACHING YARD
2.5 km
10:47AM
10:49AM
KANKURGACHHI ROAD CABIN
4.1 km
10:49AM
10:52AM10:48AM
BIDHAN NAGAR ROAD
7.0 km
10:53AM10:58AM
10:56AM11:04AM
DUM DUM JUNCTION
10.0 km
10:57AM
11:01AM11:08AM
BELGHARIA
14.0 km
11:02AM11:12AM
11:04AM11:14AM
AGARPARA
17.0 km
11:05AM
11:07AM
SODPUR
19.0 km
11:08AM11:22AM
11:08AM
AGARPARA
19.2 km
11:08AM
11:09AM
BELGHARIA
19.4 km
11:09AM
11:11AM11:23AM
KHARDAHA
21.0 km
11:12AM
11:12AM
SODPUR
21.2 km
11:12AM
11:12AM
AGARPARA
21.4 km
11:12AM
11:13AM
BELGHARIA
22.3 km
11:13AM
11:14AM11:30AM
TITAGARH
23.0 km
11:15AM11:31AM
11:18AM11:29AM
BARRACKPORE
25.0 km
11:19AM11:31AM
11:21AM11:32AM
PALTA
28.0 km
11:22AM11:33AM
11:23AM
SHYAMNAGAR
28.6 km
11:23AM
11:23AM
JAGADDAL
28.9 km
11:23AM
11:24AM11:36AM
ICHHAPUR
30.0 km
11:25AM11:37AM
11:26AM
ER STORE DEPOT NAIHATI
31.4 km
11:26AM
11:27AM
NAIHATI JUNCTION
31.9 km
11:27AM
11:27AM
KANKINARA
32.2 km
11:27AM
11:28AM
JAGADDAL
32.5 km
11:28AM
11:28AM11:43AM
SHYAMNAGAR
33.0 km
11:29AM11:44AM
11:32AM11:47AM
JAGADDAL
36.0 km
11:33AM
11:34AM11:49AM
KANKINARA
38.0 km
11:35AM
11:40AM
ER STORE DEPOT NAIHATI
39.3 km
11:40AM
11:46AM11:56AM
NAIHATI JUNCTION
41.0 km
Arrived at NAIHATI JUNCTION
ArrivedUpdated 1 hour 34 minutes ago
SDAHNH
Next Stop---- - --
To ReachNH31.9km - 11:27AM
Delayed by 10 minutes at NH

31419 Sealdah - Naihati Local runs from SEALDAH to NAIHATI JUNCTION. It covers 41 km in 1h 1m, stopping at 15 stations. Departs SEALDAH at 10:45 and arrives at NAIHATI JUNCTION at 11:46. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.

31419 Schedule — 15 stops

IST
#StationArrDep
1SEALDAHSDAHSRC10:45
4BIDHAN NAGAR ROADBNXR10:5210:53
5DUM DUM JUNCTIONDDJ10:5610:57
6BELGHARIABLH11:0111:02
7AGARPARAAGP11:0411:05
8SODPURSEP11:0711:08
11KHARDAHAKDH11:1111:12
15TITAGARHTGH11:1411:15
16BARRACKPOREBP11:1811:19
17PALTAPTF11:2111:22
20ICHHAPURIP11:2411:25
25SHYAMNAGARSNR11:2811:29
26JAGADDALJGDL11:3211:33
27KANKINARAKNR11:3411:35
29NAIHATI JUNCTIONNH11:46DST

Frequently Asked Questions — 31419 Sealdah - Naihati Local

What time does 31419 (Sealdah - Naihati Local) start from SEALDAH?
It departs from SEALDAH (SDAH) at 10:45 and reaches NAIHATI JUNCTION (NH) at 11:46.
What is the last station for 31419?
The final station of 31419 is NAIHATI JUNCTION (NH), arriving at 11:46. You can see the full schedule and route map above.
Where is train number 31419 right now?
You can check the live location of 31419 (Sealdah - Naihati Local) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 31419?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 31419 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 31419?
It covers a total distance of 41 km from SEALDAH to NAIHATI JUNCTION in about 1 hours and 1 minutes.
On which days does 31419 run?
This train runs on: Daily. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.