33061 Train Running Status Today — Canning - Barasat Local
33061
Canning - Barasat Local33061
Canning - Barasat LocalArrival
Day 1 - 18 Jul
Departure
33061Suburban
Canning - Barasat Local
Runs On
MonTueWedThuFriSatSun
Distance
66 kmDuration
2h 12mHalts
28Avg Speed
30 km/hMax Speed
120 km/hArrival
Day 1 - Jul 18
Departure
CANNING
0.0 km•
2:32PM
2:36PM
MATLA HALT
4.7 km
2:36PM
2:38PM2:40PM
TALDI
7.0 km•
2:39PM2:43PM
2:42PM2:49PM
BETBERIA GHOLA
11.0 km•
2:43PM2:52PM
2:47PM
GHUTIARI SHARIF
14.6 km
2:47PM2:54PM
2:50PM2:56PM
GOURDAHA HALT
17.0 km•
2:51PM2:56PM
2:51PM3:08PM
BIDYADHARPUR
17.4 km
2:51PM3:10PM
2:52PM
KALIKAPUR
17.8 km
2:52PM3:05PM
2:52PM3:03PM
CHAMPAHATI
17.9 km
2:52PM3:04PM
2:52PM2:59PM
PIALI
18.0 km•
2:53PM3:01PM
2:55PM3:04PM
CHAMPAHATI
21.0 km•
2:56PM3:05PM
2:59PM
KALIKAPUR
23.0 km•
3:00PM3:05PM
3:02PM3:10PM
BIDYADHARPUR
26.0 km•
3:03PM3:13PM
3:13PM3:16PM
SONARPUR JUNCTION
29.0 km•
3:14PM
3:16PM3:19PM
NARENDRAPUR HALT
31.0 km•
3:17PM3:19PM
3:18PM3:19PM
GARIA
33.0 km•
3:19PM3:23PM
3:20PM3:22PM
NEW GARIA
34.0 km•
3:21PM
3:23PM3:25PM
BAGHAJATIN
35.0 km•
3:24PM3:29PM
3:26PM3:27PM
JADABPUR
37.0 km•
3:27PM
3:29PM3:33PM
DHAKURIA
39.0 km•
3:30PM
3:35PM3:37PM
BALLYGUNGE JUNCTION
40.0 km•
3:36PM3:41PM
3:41PM3:43PM
PARK CIRCUS
42.0 km•
3:42PM3:50PM
3:44PM3:36PM
BALLYGUNGE JUNCTION
43.0 km
3:44PM3:40PM
3:49PM
KAMARDANGA HALT
45.1 km
3:49PM
3:51PM3:55PM
SIR GURUDAS BANERJEE HALT
46.0 km•
3:52PM
3:55PM
KANKURGACHHI ROAD CABIN
46.6 km
3:55PM
4:03PM4:15PM
BIDHAN NAGAR ROAD
48.0 km•
4:04PM4:15PM
4:10PM4:22PM
DUM DUM JUNCTION
51.0 km•
4:11PM
4:16PM4:28PM
DUM DUM CANTT.
54.0 km•
4:17PM4:34PM
4:19PM4:29PM
DURGANAGAR
56.0 km•
4:20PM4:39PM
4:22PM4:30PM
BIRATI
58.0 km•
4:23PM4:30PM
4:25PM4:41PM
BISHARPARA KODALIYA
59.0 km•
4:26PM4:39PM
4:26PM4:43PM
NEW BARRACKPORE
61.0 km•
4:27PM
4:33PM4:45PM
MADHYAMGRAM
62.0 km•
4:34PM4:47PM
4:36PM4:50PM
HRIDAYPUR
64.0 km•
4:37PM4:55PM
4:44PM4:56PM
BARASAT JUNCTION
66.0 km•
Arrived at BARASAT JUNCTION
ArrivedUpdated 1 minute ago
CGBT
Next Stop---- - --
To ReachBT66km - 4:56PM
Delayed by 12 minutes at BT
33061 Canning - Barasat Local runs from CANNING to BARASAT JUNCTION. It covers 66 km in 2h 12m, stopping at 28 stations. Departs CANNING at 14:32 and arrives at BARASAT JUNCTION at 16:44. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.
33061 Schedule — 28 stops
IST| # | Station | Arr | Dep |
|---|---|---|---|
| 1 | CANNINGCG | SRC | 14:32 |
| 3 | TALDITLX | 14:38 | 14:39 |
| 4 | BETBERIA GHOLABTPG | 14:42 | 14:43 |
| 6 | GOURDAHA HALTGQD | 14:50 | 14:51 |
| 10 | PIALIPLF | 14:52 | 14:53 |
| 11 | CHAMPAHATICHT | 14:55 | 14:56 |
| 12 | KALIKAPURKLKR | 14:59 | 15:00 |
| 13 | BIDYADHARPURBDYP | 15:02 | 15:03 |
| 14 | SONARPUR JUNCTIONSPR | 15:13 | 15:14 |
| 15 | NARENDRAPUR HALTNRPR | 15:16 | 15:17 |
| 16 | GARIAGIA | 15:18 | 15:19 |
| 17 | NEW GARIANGRI | 15:20 | 15:21 |
| 18 | BAGHAJATINBGJT | 15:23 | 15:24 |
| 19 | JADABPURJDP | 15:26 | 15:27 |
| 20 | DHAKURIADHK | 15:29 | 15:30 |
| 21 | BALLYGUNGE JUNCTIONBLN | 15:35 | 15:36 |
| 22 | PARK CIRCUSPQS | 15:41 | 15:42 |
| 25 | SIR GURUDAS BANERJEE HALTSGBA | 15:51 | 15:52 |
| 27 | BIDHAN NAGAR ROADBNXR | 16:03 | 16:04 |
| 28 | DUM DUM JUNCTIONDDJ | 16:10 | 16:11 |
| 29 | DUM DUM CANTT.DDC | 16:16 | 16:17 |
| 30 | DURGANAGARDGNR | 16:19 | 16:20 |
| 31 | BIRATIBBT | 16:22 | 16:23 |
| 32 | BISHARPARA KODALIYABRPK | 16:25 | 16:26 |
| 33 | NEW BARRACKPORENBE | 16:26 | 16:27 |
| 34 | MADHYAMGRAMMMG | 16:33 | 16:34 |
| 35 | HRIDAYPURHHR | 16:36 | 16:37 |
| 36 | BARASAT JUNCTIONBT | 16:44 | DST |
Frequently Asked Questions — 33061 Canning - Barasat Local
- What time does 33061 (Canning - Barasat Local) start from CANNING?
- It departs from CANNING (CG) at 14:32 and reaches BARASAT JUNCTION (BT) at 16:44.
- What is the last station for 33061?
- The final station of 33061 is BARASAT JUNCTION (BT), arriving at 16:44. You can see the full schedule and route map above.
- Where is train number 33061 right now?
- You can check the live location of 33061 (Canning - Barasat Local) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
- How accurate is the running status for train 33061?
- The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
- Why is train 33061 showing offline or not updating?
- If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
- What is the total travel distance of 33061?
- It covers a total distance of 66 km from CANNING to BARASAT JUNCTION in about 2 hours and 12 minutes.
- On which days does 33061 run?
- This train runs on: Daily. Please verify the running status before leaving for the station.
Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.