33718 Train Running Status Today — Bangaon - Ranaghat Local
33718
Bangaon - Ranaghat Local33718
Bangaon - Ranaghat LocalArrival
Day 1 - 19 Jul
Departure
33718Suburban
Bangaon - Ranaghat Local
Runs On
MonTueWedThuFriSatSun
Distance
32 kmDuration
47mHalts
9Avg Speed
40.9 km/hMax Speed
100 km/hReturn
33717Arrival
Day 1 - Jul 19
Departure
BANGAON JUNCTION
0.0 km•
9:23AM9:23AM
9:28AM9:28AM
SATBERIA
5.0 km•
9:29AM9:29AM
9:33AM9:33AM
GOPAL NAGAR
10.0 km•
9:34AM9:34AM
9:38AM9:38AM
AKAIPUR HALT
15.0 km•
9:39AM9:39AM
9:43AM9:43AM
MAJHERGRAM
18.0 km•
9:44AM9:44AM
9:48AM9:48AM
GANGNAPUR
22.0 km•
9:49AM9:49AM
9:52AM9:52AM
NABA RAYNAGAR HALT
27.0 km•
9:53AM9:53AM
9:55AM9:55AM
COOPERS HALT
29.0 km•
9:56AM9:56AM
10:10AM10:10AM
RANAGHAT JUNCTION
32.0 km•
At BANGAON JUNCTION
ScheduledUpdated few seconds ago
BNJRHA
Next StopSTBB5km - 9:28AM
To ReachRHA32km - 10:10AM
33718 Bangaon - Ranaghat Local runs from BANGAON JUNCTION to RANAGHAT JUNCTION. It covers 32 km in 0h 47m, stopping at 9 stations. Departs BANGAON JUNCTION at 09:23 and arrives at RANAGHAT JUNCTION at 10:10. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.
33718 Schedule — 9 stops
IST| # | Station | Arr | Dep |
|---|---|---|---|
| 1 | BANGAON JUNCTIONBNJ | SRC | 09:23 |
| 2 | SATBERIASTBB | 09:28 | 09:29 |
| 3 | GOPAL NAGARGN | 09:33 | 09:34 |
| 4 | AKAIPUR HALTAKIP | 09:38 | 09:39 |
| 5 | MAJHERGRAMMAJ | 09:43 | 09:44 |
| 6 | GANGNAPURGGP | 09:48 | 09:49 |
| 7 | NABA RAYNAGAR HALTNBRN | 09:52 | 09:53 |
| 8 | COOPERS HALTCPHT | 09:55 | 09:56 |
| 9 | RANAGHAT JUNCTIONRHA | 10:10 | DST |
Frequently Asked Questions — 33718 Bangaon - Ranaghat Local
- What time does 33718 (Bangaon - Ranaghat Local) start from BANGAON JUNCTION?
- It departs from BANGAON JUNCTION (BNJ) at 09:23 and reaches RANAGHAT JUNCTION (RHA) at 10:10.
- What is the last station for 33718?
- The final station of 33718 is RANAGHAT JUNCTION (RHA), arriving at 10:10. You can see the full schedule and route map above.
- Where is train number 33718 right now?
- You can check the live location of 33718 (Bangaon - Ranaghat Local) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
- How accurate is the running status for train 33718?
- The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
- Why is train 33718 showing offline or not updating?
- If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
- What is the total travel distance of 33718?
- It covers a total distance of 32 km from BANGAON JUNCTION to RANAGHAT JUNCTION in about 0 hours and 47 minutes.
- On which days does 33718 run?
- This train runs on: Daily. Please verify the running status before leaving for the station.
Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.