RailRadar LogoRailRadar

54755 Train Running Status Today — Bathinda - Shri Ganganagar Passenger

54755
Bathinda - Shri Ganganagar Passenger
Arrival
Day 1 - 18 Jul
Departure
54755Passenger

Bathinda - Shri Ganganagar Passenger

Runs On

MonTueWedThuFriSatSun
Distance
127 km
Duration
3h
Halts
18
Avg Speed
42.3 km/h
Max Speed
85.7 km/h
Return
54756
Arrival
Day 1 - Jul 18
Departure
BATHINDA JUNCTION
0.0 km
7:25AM7:33AM
7:33AM7:39AM
BAHMAN DIWANA
10.0 km
7:34AM7:41AM
7:44AM7:52AM
BULLUANA
16.0 km
7:45AM
7:50AM
KARAMGARH SARDARGARH HALT
19.4 km
7:50AM
7:58AM
DAULA KOT BHAI
24.2 km
7:58AM
8:04AM8:03AM
GIDDARBAHA
28.0 km
8:06AM8:11AM
8:15AM8:12AM
FAQAR SAR
34.0 km
8:16AM8:19AM
8:23AM8:24AM
MALOUT
44.0 km
8:25AM8:31AM
8:31AM
QUBARWALA
50.7 km
8:31AM
8:38AM8:39AM
PAKKI
58.0 km
8:39AM8:43AM
8:47AM
BAHAWAL BASI
66.0 km
8:48AM8:48AM
8:52AM
KILANWALI
70.0 km
8:52AM
8:55AM8:56AM
ABOHAR JUNCTION
73.0 km
8:57AM9:05AM
9:06AM9:18AM
KILANWALI
81.0 km
9:07AM9:19AM
9:14AM9:26AM
PANJ KOSI
87.0 km
9:15AM9:27AM
9:22AM9:34AM
BAKAYANWALA
93.0 km
9:23AM9:35AM
9:30AM9:42AM
KOTHA PAKKI
97.0 km
9:31AM9:43AM
9:37AM9:49AM
HINDUMALKOTE
101.0 km
9:38AM9:50AM
9:45AM9:57AM
ORKI
106.0 km
9:46AM9:58AM
9:55AM10:07AM
FATUHI
111.0 km
9:56AM10:08AM
10:01AM
KHAT LABANA
116.6 km
10:01AM
10:05AM10:17AM
MOHANPURA
121.0 km
10:06AM10:18AM
10:25AM10:37AM
SHRI GANGANAGAR JUNCTION
127.0 km
1.5 km to KILANWALI
6m LateUpdated few seconds ago
BTISGNR
Next StopKLWL70km - 8:52AM
To ReachSGNR127km - 10:37AM
Delayed by 6 minutes at ABS

54755 Bathinda - Shri Ganganagar Passenger runs from BATHINDA JUNCTION to SHRI GANGANAGAR JUNCTION. It covers 127 km in 3h, stopping at 18 stations. Departs BATHINDA JUNCTION at 07:25 and arrives at SHRI GANGANAGAR JUNCTION at 10:25. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.

54755 Schedule — 18 stops

IST
#StationArrDep
1BATHINDA JUNCTIONBTISRC07:25
2BAHMAN DIWANABWX07:3307:34
3BULLUANABHX07:4407:45
6GIDDARBAHAGDB08:0408:06
7FAQAR SARFSR08:1508:16
8MALOUTMOT08:2308:25
10PAKKIPKK08:3808:39
11BAHAWAL BASIBFE08:4708:48
13ABOHAR JUNCTIONABS08:5508:57
14KILANWALIKLWL09:0609:07
15PANJ KOSIPJK09:1409:15
16BAKAYANWALABKWA09:2209:23
17KOTHA PAKKIKTPK09:3009:31
18HINDUMALKOTEHMK09:3709:38
19ORKIORKI09:4509:46
20FATUHIFTH09:5509:56
22MOHANPURAMOPR10:0510:06
23SHRI GANGANAGAR JUNCTIONSGNR10:25DST

Frequently Asked Questions — 54755 Bathinda - Shri Ganganagar Passenger

What time does 54755 (Bathinda - Shri Ganganagar Passenger) start from BATHINDA JUNCTION?
It departs from BATHINDA JUNCTION (BTI) at 07:25 and reaches SHRI GANGANAGAR JUNCTION (SGNR) at 10:25.
What is the last station for 54755?
The final station of 54755 is SHRI GANGANAGAR JUNCTION (SGNR), arriving at 10:25. You can see the full schedule and route map above.
Where is train number 54755 right now?
You can check the live location of 54755 (Bathinda - Shri Ganganagar Passenger) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 54755?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 54755 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 54755?
It covers a total distance of 127 km from BATHINDA JUNCTION to SHRI GANGANAGAR JUNCTION in about 3 hours and 0 minutes.
On which days does 54755 run?
This train runs on: Daily. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.