RailRadar LogoRailRadar

55104 Train Running Status Today — Chhapra Kacheri - Thawe Passenger

55104
Chhapra Kacheri - Thawe Passenger
Arrival
Day 1 - 18 Jul
Departure
55104Passenger

Chhapra Kacheri - Thawe Passenger

Runs On

MonTueWedThuFriSatSun
Distance
99 km
Duration
3h 25m
Halts
27
Avg Speed
29 km/h
Max Speed
90 km/h
Return
55103
Arrival
Day 1 - Jul 18
Departure
CHHAPRA KACHERI
0.0 km
12:40PM12:40PM
12:49PM12:49PM
TENUA DUMARIA HALT
5.0 km
12:50PM12:50PM
12:52PM12:52PM
KHAIRAH
7.0 km
12:54PM12:54PM
1:00PM1:00PM
BANNI MAHAMMAN PATTI
11.0 km
1:01PM1:01PM
1:06PM1:06PM
BAHUARA HALT
12.0 km
1:07PM1:07PM
1:09PM1:09PM
PATERHI
15.0 km
1:11PM1:11PM
1:17PM1:17PM
TEJPURWA HALT
18.0 km
1:18PM1:18PM
1:22PM1:22PM
SHILHAURI HALT
21.0 km
1:23PM1:23PM
1:25PM1:25PM
MARHAURA
22.0 km
1:27PM1:27PM
1:33PM1:33PM
TERHA HALT
25.0 km
1:34PM1:34PM
1:38PM1:38PM
AGAUTHAR HALT
26.0 km
1:39PM1:39PM
1:48PM1:48PM
SHAMKAURIA
30.0 km
1:50PM1:50PM
1:53PM1:53PM
PARSA KERWAN HALT
31.0 km
1:54PM1:54PM
1:57PM1:57PM
GUNRAJPUR DHAMA HALT
32.0 km
1:58PM1:58PM
2:09PM2:09PM
MASHRAKH JUNCTION
35.0 km
2:10PM2:10PM
2:20PM2:20PM
RAJAPATTI
44.0 km
2:22PM2:22PM
2:26PM2:26PM
ALEHPUR HALT
46.0 km
2:27PM2:27PM
2:32PM2:32PM
KATALPUR HALT
49.0 km
2:33PM2:33PM
2:41PM2:41PM
DIGHWA DUBAULI
54.0 km
2:43PM2:43PM
2:50PM2:50PM
TRIVIKRAMDEO NAGAR
59.0 km
2:51PM2:51PM
2:55PM2:55PM
BRAJKISHORE HALT
62.0 km
2:56PM2:56PM
3:01PM3:01PM
SIDHWALIA
66.0 km
3:03PM3:03PM
3:09PM3:09PM
SHER
71.0 km
3:10PM3:10PM
3:16PM3:16PM
RATAN SARAI
77.0 km
3:18PM3:18PM
3:29PM3:29PM
MANJHAGARH
85.0 km
3:31PM3:31PM
3:43PM3:43PM
GOPALGANJ
94.0 km
3:45PM3:45PM
3:47PM
THAWE JUNCTION B CABIN
94.6 km
3:47PM
4:05PM4:05PM
THAWE JUNCTION
99.0 km
At CHHAPRA KACHERI
ScheduledUpdated few seconds ago
CITHE
Next StopTMUR5km - 12:49PM
To ReachTHE99km - 4:05PM

55104 Chhapra Kacheri - Thawe Passenger runs from CHHAPRA KACHERI to THAWE JUNCTION. It covers 99 km in 3h 25m, stopping at 27 stations. Departs CHHAPRA KACHERI at 12:40 and arrives at THAWE JUNCTION at 16:05. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.

55104 Schedule — 27 stops

IST
#StationArrDep
1CHHAPRA KACHERICISRC12:40
2TENUA DUMARIA HALTTMUR12:4912:50
3KHAIRAHKYH12:5212:54
4BANNI MAHAMMAN PATTIBMPT13:0013:01
5BAHUARA HALTBURA13:0613:07
6PATERHIPEE13:0913:11
7TEJPURWA HALTTJW13:1713:18
8SHILHAURI HALTSLHI13:2213:23
9MARHAURAMEW13:2513:27
10TERHA HALTTERH13:3313:34
11AGAUTHAR HALTAGTR13:3813:39
12SHAMKAURIASMKR13:4813:50
13PARSA KERWAN HALTPKRH13:5313:54
14GUNRAJPUR DHAMA HALTGNDM13:5713:58
15MASHRAKH JUNCTIONMHC14:0914:10
16RAJAPATTIRPV14:2014:22
17ALEHPUR HALTAPRH14:2614:27
18KATALPUR HALTKTLP14:3214:33
19DIGHWA DUBAULIDWDI14:4114:43
20TRIVIKRAMDEO NAGARTKND14:5014:51
21BRAJKISHORE HALTBKRH14:5514:56
22SIDHWALIASQW15:0115:03
23SHERSHER15:0915:10
24RATAN SARAIRTU15:1615:18
25MANJHAGARHMJV15:2915:31
26GOPALGANJGOPG15:4315:45
28THAWE JUNCTIONTHE16:05DST

Frequently Asked Questions — 55104 Chhapra Kacheri - Thawe Passenger

What time does 55104 (Chhapra Kacheri - Thawe Passenger) start from CHHAPRA KACHERI?
It departs from CHHAPRA KACHERI (CI) at 12:40 and reaches THAWE JUNCTION (THE) at 16:05.
What is the last station for 55104?
The final station of 55104 is THAWE JUNCTION (THE), arriving at 16:05. You can see the full schedule and route map above.
Where is train number 55104 right now?
You can check the live location of 55104 (Chhapra Kacheri - Thawe Passenger) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 55104?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 55104 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 55104?
It covers a total distance of 99 km from CHHAPRA KACHERI to THAWE JUNCTION in about 3 hours and 25 minutes.
On which days does 55104 run?
This train runs on: Daily. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.