55810 Train Running Status Today — Guwahati - New Bongaigaon Passenger
55810
Guwahati - New Bongaigaon Passenger55810
Guwahati - New Bongaigaon PassengerArrival
Day 1 - 19 Jul
Departure
55810Passenger
Guwahati - New Bongaigaon Passenger
Runs On
MonTueWedThuFriSatSun
Distance
157.7 kmDuration
5h 10mHalts
22Avg Speed
30.5 km/hMax Speed
80.6 km/hReturn
55809Arrival
Day 1 - Jul 19
Departure
GUWAHATI
0.0 km•
5:00AM5:00AM
5:15AM5:15AM
KAMAKHYA JUNCTION
6.8 km•
5:17AM5:17AM
5:29AM5:29AM
AGTHORI
13.9 km•
5:30AM5:30AM
5:40AM5:40AM
CHANGSARI
22.0 km•
5:41AM5:41AM
5:51AM5:51AM
BAIHATA
32.3 km•
5:52AM5:52AM
6:00AM6:00AM
KENDUKONA
37.7 km•
6:01AM6:01AM
6:09AM6:09AM
RANGIYA JUNCTION
47.7 km•
6:10AM6:10AM
6:20AM6:20AM
GHOGRAPAR
55.6 km•
6:21AM6:21AM
6:30AM6:30AM
NALBARI
64.6 km•
6:31AM6:31AM
6:41AM6:41AM
KAITHALKUCHI
74.1 km•
6:42AM6:42AM
6:52AM6:52AM
TIHU
82.0 km•
6:53AM6:53AM
7:02AM7:02AM
NIZSARIHA HALT
86.8 km•
7:03AM7:03AM
7:06AM
TIHU
88.1 km
7:06AM
7:13AM7:13AM
PATHSALA
91.4 km•
7:14AM7:14AM
7:23AM7:23AM
SORUPETA
102.3 km•
7:24AM7:24AM
7:30AM
BARPETA ROAD
105.6 km
7:30AM
7:33AM7:33AM
GUAGACHHA
107.6 km•
7:34AM7:34AM
7:45AM7:45AM
BARPETA ROAD
113.5 km•
7:46AM7:46AM
7:55AM7:55AM
SORBHOG
121.1 km•
7:56AM7:56AM
8:03AM8:03AM
PATILADAHA
130.5 km•
8:04AM8:04AM
8:15AM8:15AM
BIJNI
140.4 km•
8:16AM8:16AM
8:30AM8:30AM
CHAPRAKATA
150.0 km•
8:31AM8:31AM
9:11AM9:11AM
BONGAIGAON
155.4 km•
9:12AM9:12AM
10:10AM10:10AM
NEW BONGAIGAON JUNCTION
157.7 km•
At GUWAHATI
ScheduledUpdated few seconds ago
GHYNBQ
Next StopKYQ6.8km - 5:15AM
To ReachNBQ157.7km - 10:10AM
55810 Guwahati - New Bongaigaon Passenger runs from GUWAHATI to NEW BONGAIGAON JUNCTION. It covers 157.7 km in 5h 10m, stopping at 22 stations. Departs GUWAHATI at 05:00 and arrives at NEW BONGAIGAON JUNCTION at 10:10. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.
55810 Schedule — 22 stops
IST| # | Station | Arr | Dep |
|---|---|---|---|
| 1 | GUWAHATIGHY | SRC | 05:00 |
| 2 | KAMAKHYA JUNCTIONKYQ | 05:15 | 05:17 |
| 3 | AGTHORIAGT | 05:29 | 05:30 |
| 4 | CHANGSARICGS | 05:40 | 05:41 |
| 5 | BAIHATABIZ | 05:51 | 05:52 |
| 6 | KENDUKONAKDKN | 06:00 | 06:01 |
| 7 | RANGIYA JUNCTIONRNY | 06:09 | 06:10 |
| 8 | GHOGRAPARGOE | 06:20 | 06:21 |
| 9 | NALBARINLV | 06:30 | 06:31 |
| 10 | KAITHALKUCHIKTCH | 06:41 | 06:42 |
| 11 | TIHUTIHU | 06:52 | 06:53 |
| 12 | NIZSARIHA HALTNSRH | 07:02 | 07:03 |
| 14 | PATHSALAPBL | 07:13 | 07:14 |
| 15 | SORUPETASPQ | 07:23 | 07:24 |
| 17 | GUAGACHHAGSA | 07:33 | 07:34 |
| 18 | BARPETA ROADBPRD | 07:45 | 07:46 |
| 19 | SORBHOGSBE | 07:55 | 07:56 |
| 20 | PATILADAHAPTLD | 08:03 | 08:04 |
| 21 | BIJNIBJF | 08:15 | 08:16 |
| 22 | CHAPRAKATACPQ | 08:30 | 08:31 |
| 23 | BONGAIGAONBNGN | 09:11 | 09:12 |
| 24 | NEW BONGAIGAON JUNCTIONNBQ | 10:10 | DST |
Frequently Asked Questions — 55810 Guwahati - New Bongaigaon Passenger
- What time does 55810 (Guwahati - New Bongaigaon Passenger) start from GUWAHATI?
- It departs from GUWAHATI (GHY) at 05:00 and reaches NEW BONGAIGAON JUNCTION (NBQ) at 10:10.
- What is the last station for 55810?
- The final station of 55810 is NEW BONGAIGAON JUNCTION (NBQ), arriving at 10:10. You can see the full schedule and route map above.
- Where is train number 55810 right now?
- You can check the live location of 55810 (Guwahati - New Bongaigaon Passenger) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
- How accurate is the running status for train 55810?
- The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
- Why is train 55810 showing offline or not updating?
- If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
- What is the total travel distance of 55810?
- It covers a total distance of 157.7 km from GUWAHATI to NEW BONGAIGAON JUNCTION in about 5 hours and 10 minutes.
- On which days does 55810 run?
- This train runs on: Daily. Please verify the running status before leaving for the station.
Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.