RailRadar LogoRailRadar

56103 Train Running Status Today — Erode - Mettur Dam Passenger

56103
Erode - Mettur Dam Passenger
Arrival
Day 1 - 18 Jul
Departure
56103Passenger

Erode - Mettur Dam Passenger

Runs On

MonTueWedThuFriSatSun
Distance
100 km
Duration
2h 45m
Halts
11
Avg Speed
36.4 km/h
Max Speed
70.9 km/h
Return
56104
Arrival
Day 1 - Jul 18
Departure
ERODE JUNCTION
0.0 km
5:00AM5:08AM
5:09AM
CAUVERY
4.0 km
5:10AM
5:19AM
ANANGUR
13.0 km
5:20AM
5:29AM
SANKARIDURG
21.0 km
5:30AM
5:37AM
MAVELIPALAIYAM
26.0 km
5:38AM
5:49AM
MAGUDANCHAVADI
39.0 km
5:50AM
5:55AM
MAKUDAN VIRAPANDI BLOCK HUT
44.9 km
5:55AM
5:59AM
VIRAPANDY ROAD
49.0 km
6:00AM
6:04AM
NEYKKARAPATTI
51.2 km
6:04AM
6:11AM
MAGNESITE JUNCTION
55.6 km
6:11AM
6:12AM
MAGNESITE BYPASS CABIN
56.3 km
6:12AM
6:16AM
SALEM OUTER CABIN A
58.7 km
6:16AM
6:17AM
SALEM JUNCTION
59.0 km
6:20AM
6:21AM
SALEM OUTER CABIN A
59.6 km
6:21AM
6:29AM
MAGNESITE BYPASS CABIN
64.4 km
6:29AM
6:39AM
OMALUR JUNCTION
71.0 km
6:40AM
6:49AM
TOLASAMPATTI
78.8 km
6:49AM
6:59AM
MECHERI ROAD
87.0 km
7:00AM
7:09AM
VIRUDASAMPATTY
89.6 km
7:09AM
7:14AM
CHINNA KOOTHANUR
91.0 km
7:14AM
7:18AM
PAZHANGOTTAI
92.3 km
7:18AM
7:45AM8:23AM
METTUR DAM
100.0 km
Arrived at METTUR DAM
ArrivedUpdated 1 hour 4 minutes ago
EDMTDM
Next Stop---- - --
To ReachMTDM100km - 8:23AM
Delayed by 39 minutes at MTDM

56103 Erode - Mettur Dam Passenger runs from ERODE JUNCTION to METTUR DAM. It covers 100 km in 2h 45m, stopping at 11 stations. Departs ERODE JUNCTION at 05:00 and arrives at METTUR DAM at 07:45. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.

56103 Schedule — 11 stops

IST
#StationArrDep
1ERODE JUNCTIONEDSRC05:00
2CAUVERYCV05:0905:10
3ANANGURANU05:1905:20
4SANKARIDURGSGE05:2905:30
5MAVELIPALAIYAMMVPM05:3705:38
6MAGUDANCHAVADIDC05:4905:50
8VIRAPANDY ROADVRPD05:5906:00
13SALEM JUNCTIONSA06:1706:20
16OMALUR JUNCTIONOML06:3906:40
18MECHERI ROADMCRD06:5907:00
22METTUR DAMMTDM07:45DST

Frequently Asked Questions — 56103 Erode - Mettur Dam Passenger

What time does 56103 (Erode - Mettur Dam Passenger) start from ERODE JUNCTION?
It departs from ERODE JUNCTION (ED) at 05:00 and reaches METTUR DAM (MTDM) at 07:45.
What is the last station for 56103?
The final station of 56103 is METTUR DAM (MTDM), arriving at 07:45. You can see the full schedule and route map above.
Where is train number 56103 right now?
You can check the live location of 56103 (Erode - Mettur Dam Passenger) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 56103?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 56103 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 56103?
It covers a total distance of 100 km from ERODE JUNCTION to METTUR DAM in about 2 hours and 45 minutes.
On which days does 56103 run?
This train runs on: Daily. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.