56103 Train Running Status Today — Erode - Mettur Dam Passenger
56103
Erode - Mettur Dam Passenger56103
Erode - Mettur Dam PassengerArrival
Day 1 - 18 Jul
Departure
56103Passenger
Erode - Mettur Dam Passenger
Runs On
MonTueWedThuFriSatSun
Distance
100 kmDuration
2h 45mHalts
11Avg Speed
36.4 km/hMax Speed
70.9 km/hReturn
56104Arrival
Day 1 - Jul 18
Departure
ERODE JUNCTION
0.0 km•
5:00AM5:08AM
5:09AM
CAUVERY
4.0 km•
5:10AM
5:19AM
ANANGUR
13.0 km•
5:20AM
5:29AM
SANKARIDURG
21.0 km•
5:30AM
5:37AM
MAVELIPALAIYAM
26.0 km•
5:38AM
5:49AM
MAGUDANCHAVADI
39.0 km•
5:50AM
5:55AM
MAKUDAN VIRAPANDI BLOCK HUT
44.9 km
5:55AM
5:59AM
VIRAPANDY ROAD
49.0 km•
6:00AM
6:04AM
NEYKKARAPATTI
51.2 km
6:04AM
6:11AM
MAGNESITE JUNCTION
55.6 km
6:11AM
6:12AM
MAGNESITE BYPASS CABIN
56.3 km
6:12AM
6:16AM
SALEM OUTER CABIN A
58.7 km
6:16AM
6:17AM
SALEM JUNCTION
59.0 km•
6:20AM
6:21AM
SALEM OUTER CABIN A
59.6 km
6:21AM
6:29AM
MAGNESITE BYPASS CABIN
64.4 km
6:29AM
6:39AM
OMALUR JUNCTION
71.0 km•
6:40AM
6:49AM
TOLASAMPATTI
78.8 km
6:49AM
6:59AM
MECHERI ROAD
87.0 km•
7:00AM
7:09AM
VIRUDASAMPATTY
89.6 km
7:09AM
7:14AM
CHINNA KOOTHANUR
91.0 km
7:14AM
7:18AM
PAZHANGOTTAI
92.3 km
7:18AM
7:45AM8:23AM
METTUR DAM
100.0 km•
Arrived at METTUR DAM
ArrivedUpdated 1 hour 4 minutes ago
EDMTDM
Next Stop---- - --
To ReachMTDM100km - 8:23AM
Delayed by 39 minutes at MTDM
56103 Erode - Mettur Dam Passenger runs from ERODE JUNCTION to METTUR DAM. It covers 100 km in 2h 45m, stopping at 11 stations. Departs ERODE JUNCTION at 05:00 and arrives at METTUR DAM at 07:45. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.
56103 Schedule — 11 stops
IST| # | Station | Arr | Dep |
|---|---|---|---|
| 1 | ERODE JUNCTIONED | SRC | 05:00 |
| 2 | CAUVERYCV | 05:09 | 05:10 |
| 3 | ANANGURANU | 05:19 | 05:20 |
| 4 | SANKARIDURGSGE | 05:29 | 05:30 |
| 5 | MAVELIPALAIYAMMVPM | 05:37 | 05:38 |
| 6 | MAGUDANCHAVADIDC | 05:49 | 05:50 |
| 8 | VIRAPANDY ROADVRPD | 05:59 | 06:00 |
| 13 | SALEM JUNCTIONSA | 06:17 | 06:20 |
| 16 | OMALUR JUNCTIONOML | 06:39 | 06:40 |
| 18 | MECHERI ROADMCRD | 06:59 | 07:00 |
| 22 | METTUR DAMMTDM | 07:45 | DST |
Frequently Asked Questions — 56103 Erode - Mettur Dam Passenger
- What time does 56103 (Erode - Mettur Dam Passenger) start from ERODE JUNCTION?
- It departs from ERODE JUNCTION (ED) at 05:00 and reaches METTUR DAM (MTDM) at 07:45.
- What is the last station for 56103?
- The final station of 56103 is METTUR DAM (MTDM), arriving at 07:45. You can see the full schedule and route map above.
- Where is train number 56103 right now?
- You can check the live location of 56103 (Erode - Mettur Dam Passenger) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
- How accurate is the running status for train 56103?
- The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
- Why is train 56103 showing offline or not updating?
- If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
- What is the total travel distance of 56103?
- It covers a total distance of 100 km from ERODE JUNCTION to METTUR DAM in about 2 hours and 45 minutes.
- On which days does 56103 run?
- This train runs on: Daily. Please verify the running status before leaving for the station.
Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.