RailRadar LogoRailRadar

56104 Train Running Status Today — Mettur Dam - Erode Passenger

56104
Mettur Dam - Erode Passenger
Arrival
Day 1 - 18 Jul
Departure
56104Passenger

Mettur Dam - Erode Passenger

Runs On

MonTueWedThuFriSatSun
Distance
100 km
Duration
2h 40m
Halts
11
Avg Speed
37.5 km/h
Max Speed
80 km/h
Return
56103
Arrival
Day 1 - Jul 18
Departure
METTUR DAM
0.0 km
7:25PM7:25PM
7:35PM
PAZHANGOTTAI
7.7 km
7:35PM
7:37PM
CHINNA KOOTHANUR
9.0 km
7:37PM
7:39PM
VIRUDASAMPATTY
10.4 km
7:39PM
7:42PM7:42PM
MECHERI ROAD
13.0 km
7:43PM7:43PM
7:51PM
TOLASAMPATTI
21.2 km
7:51PM
7:59PM7:59PM
OMALUR JUNCTION
29.0 km
8:00PM8:00PM
8:09PM
MAGNESITE BYPASS CABIN
35.6 km
8:09PM
8:16PM
SALEM OUTER CABIN A
40.4 km
8:16PM
8:17PM8:17PM
SALEM JUNCTION
41.0 km
8:20PM8:20PM
8:20PM
SALEM OUTER CABIN A
41.3 km
8:20PM
8:22PM
MAGNESITE BYPASS CABIN
43.7 km
8:22PM
8:23PM
MAGNESITE JUNCTION
44.4 km
8:23PM
8:27PM
NEYKKARAPATTI
48.8 km
8:27PM
8:29PM8:29PM
VIRAPANDY ROAD
51.0 km
8:30PM8:30PM
8:34PM
MAKUDAN VIRAPANDI BLOCK HUT
55.5 km
8:34PM
8:39PM8:39PM
MAGUDANCHAVADI
62.0 km
8:40PM8:40PM
8:54PM8:54PM
MAVELIPALAIYAM
74.0 km
8:55PM8:55PM
9:02PM9:02PM
SANKARIDURG
79.0 km
9:03PM9:03PM
9:09PM9:09PM
ANANGUR
87.0 km
9:10PM9:10PM
9:24PM9:24PM
CAUVERY
96.0 km
9:25PM9:25PM
10:05PM10:05PM
ERODE JUNCTION
100.0 km
At METTUR DAM
ScheduledUpdated few seconds ago
MTDMED
Next StopMCRD13km - 7:42PM
To ReachED100km - 10:05PM

56104 Mettur Dam - Erode Passenger runs from METTUR DAM to ERODE JUNCTION. It covers 100 km in 2h 40m, stopping at 11 stations. Departs METTUR DAM at 19:25 and arrives at ERODE JUNCTION at 22:05. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.

56104 Schedule — 11 stops

IST
#StationArrDep
1METTUR DAMMTDMSRC19:25
5MECHERI ROADMCRD19:4219:43
7OMALUR JUNCTIONOML19:5920:00
10SALEM JUNCTIONSA20:1720:20
15VIRAPANDY ROADVRPD20:2920:30
17MAGUDANCHAVADIDC20:3920:40
18MAVELIPALAIYAMMVPM20:5420:55
19SANKARIDURGSGE21:0221:03
20ANANGURANU21:0921:10
21CAUVERYCV21:2421:25
22ERODE JUNCTIONED22:05DST

Frequently Asked Questions — 56104 Mettur Dam - Erode Passenger

What time does 56104 (Mettur Dam - Erode Passenger) start from METTUR DAM?
It departs from METTUR DAM (MTDM) at 19:25 and reaches ERODE JUNCTION (ED) at 22:05.
What is the last station for 56104?
The final station of 56104 is ERODE JUNCTION (ED), arriving at 22:05. You can see the full schedule and route map above.
Where is train number 56104 right now?
You can check the live location of 56104 (Mettur Dam - Erode Passenger) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 56104?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 56104 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 56104?
It covers a total distance of 100 km from METTUR DAM to ERODE JUNCTION in about 2 hours and 40 minutes.
On which days does 56104 run?
This train runs on: Daily. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.