RailRadar LogoRailRadar

56604 Train Running Status Today — Shoranur - Coimbatore Passenger

56604
Shoranur - Coimbatore Passenger
Arrival
Day 1 - 19 Jul
Departure
56604Passenger

Shoranur - Coimbatore Passenger

Runs On

MonTueWedThuFriSatSun
Distance
99 km
Duration
2h 45m
Halts
13
Avg Speed
36 km/h
Max Speed
78 km/h
Return
56603
Arrival
Day 1 - Jul 19
Departure
SHORANUR JUNCTION
0.0 km
8:20AM8:20AM
8:23AM
SHORANUR A CABIN
1.5 km
8:23AM
8:31AM8:31AM
MANNANUR
5.9 km
8:32AM8:32AM
8:39AM8:39AM
OTTAPPALAM
12.9 km
8:40AM8:40AM
8:45AM
PALAPPURAM
16.4 km
8:45AM
8:50AM8:50AM
LAKKITI
20.4 km
8:51AM8:51AM
8:57AM8:57AM
MANKARA
28.2 km
8:58AM8:58AM
9:05AM9:05AM
PARLI
35.6 km
9:06AM9:06AM
9:15AM9:15AM
PALAKKAD JUNCTION (PALGHAT)
44.4 km
9:20AM9:20AM
9:27AM
KOTTEKAD
50.9 km
9:27AM
9:34AM9:34AM
KANJIKODE
58.0 km
9:35AM9:35AM
9:47AM9:47AM
WALAYAR
69.3 km
9:48AM9:48AM
9:59AM9:59AM
ETTIMADAI
78.1 km
10:00AM10:00AM
10:09AM10:09AM
MADUKARAI
83.3 km
10:10AM10:10AM
10:29AM10:29AM
PODANUR JUNCTION
93.0 km
10:30AM10:30AM
11:05AM11:05AM
COIMBATORE JUNCTION
99.0 km
At SHORANUR JUNCTION
ScheduledUpdated few seconds ago
SRRCBE
Next StopMNUR5.9km - 8:31AM
To ReachCBE99km - 11:05AM

56604 Shoranur - Coimbatore Passenger runs from SHORANUR JUNCTION to COIMBATORE JUNCTION. It covers 99 km in 2h 45m, stopping at 13 stations. Departs SHORANUR JUNCTION at 08:20 and arrives at COIMBATORE JUNCTION at 11:05. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.

56604 Schedule — 13 stops

IST
#StationArrDep
1SHORANUR JUNCTIONSRRSRC08:20
3MANNANURMNUR08:3108:32
4OTTAPPALAMOTP08:3908:40
6LAKKITILDY08:5008:51
7MANKARAMNY08:5708:58
8PARLIPLL09:0509:06
9PALAKKAD JUNCTION (PALGHAT)PGT09:1509:20
11KANJIKODEKJKD09:3409:35
12WALAYARWRA09:4709:48
13ETTIMADAIETMD09:5910:00
14MADUKARAIMDKI10:0910:10
15PODANUR JUNCTIONPTJ10:2910:30
16COIMBATORE JUNCTIONCBE11:05DST

Frequently Asked Questions — 56604 Shoranur - Coimbatore Passenger

What time does 56604 (Shoranur - Coimbatore Passenger) start from SHORANUR JUNCTION?
It departs from SHORANUR JUNCTION (SRR) at 08:20 and reaches COIMBATORE JUNCTION (CBE) at 11:05.
What is the last station for 56604?
The final station of 56604 is COIMBATORE JUNCTION (CBE), arriving at 11:05. You can see the full schedule and route map above.
Where is train number 56604 right now?
You can check the live location of 56604 (Shoranur - Coimbatore Passenger) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 56604?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 56604 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 56604?
It covers a total distance of 99 km from SHORANUR JUNCTION to COIMBATORE JUNCTION in about 2 hours and 45 minutes.
On which days does 56604 run?
This train runs on: Daily. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.