59204 Train Running Status Today — Bhavnagar Terminus - Botad Passenger
59204
Bhavnagar Terminus - Botad Passenger59204
Bhavnagar Terminus - Botad PassengerArrival
Day 1 - 18 Jul
Departure
59204Passenger
Bhavnagar Terminus - Botad Passenger
Runs On
MonTueWedThuFriSatSun
Distance
92 kmDuration
2h 10mHalts
14Avg Speed
42.5 km/hMax Speed
73.3 km/hReturn
59203Arrival
Day 1 - Jul 18
Departure
BHAVNAGAR TERMINUS
0.0 km•
11:00AM11:06AM
11:08AM11:06AM
BHAVNAGAR PARA
3.0 km•
11:09AM11:14AM
11:15AM11:19AM
NARI ROAD
7.0 km
11:15AM11:19AM
11:19AM11:40AM
VARTEJ
10.0 km•
11:20AM11:44AM
11:29AM11:56AM
KHODIYAR MANDIR
15.0 km•
11:30AM11:56AM
11:37AM12:00PM
SIHOR JUNCTION
20.0 km•
11:38AM11:55AM
11:42AM
MOTA SURKA
24.2 km
11:42AM
11:46AM12:12PM
SONGADH
28.0 km•
11:47AM12:18PM
11:53AM12:19PM
BAJUD
34.0 km•
11:54AM12:23PM
12:00PM12:25PM
SANOSARA
38.0 km•
12:01PM12:25PM
12:10PM12:40PM
DHOLA JUNCTION
49.0 km•
12:11PM12:49PM
12:21PM12:57PM
UJALVAV
59.0 km•
12:22PM12:59PM
12:29PM
ALAMPAR
66.0 km•
12:30PM1:09PM
12:37PM1:14PM
NINGALA
74.0 km•
12:38PM1:15PM
12:47PM1:24PM
LATHIDAD
81.0 km•
12:48PM1:36PM
1:10PM2:29PM
BOTAD JUNCTION
92.0 km•
0.9 km to BOTAD JUNCTION
48m LateUpdated 25 minutes ago
BVCBTD
Next StopBTD92km - 2:29PM
To ReachBTD92km - 2:29PM
Delayed by 48 minutes at LTD
59204 Bhavnagar Terminus - Botad Passenger runs from BHAVNAGAR TERMINUS to BOTAD JUNCTION. It covers 92 km in 2h 10m, stopping at 14 stations. Departs BHAVNAGAR TERMINUS at 11:00 and arrives at BOTAD JUNCTION at 13:10. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.
59204 Schedule — 14 stops
IST| # | Station | Arr | Dep |
|---|---|---|---|
| 1 | BHAVNAGAR TERMINUSBVC | SRC | 11:00 |
| 2 | BHAVNAGAR PARABVP | 11:08 | 11:09 |
| 4 | VARTEJVTJ | 11:19 | 11:20 |
| 5 | KHODIYAR MANDIRKDMR | 11:29 | 11:30 |
| 6 | SIHOR JUNCTIONSOJN | 11:37 | 11:38 |
| 8 | SONGADHSGD | 11:46 | 11:47 |
| 9 | BAJUDBJUD | 11:53 | 11:54 |
| 10 | SANOSARASOA | 12:00 | 12:01 |
| 11 | DHOLA JUNCTIONDLJ | 12:10 | 12:11 |
| 12 | UJALVAVUJ | 12:21 | 12:22 |
| 13 | ALAMPARALMR | 12:29 | 12:30 |
| 14 | NINGALANGA | 12:37 | 12:38 |
| 15 | LATHIDADLTD | 12:47 | 12:48 |
| 16 | BOTAD JUNCTIONBTD | 13:10 | DST |
Frequently Asked Questions — 59204 Bhavnagar Terminus - Botad Passenger
- What time does 59204 (Bhavnagar Terminus - Botad Passenger) start from BHAVNAGAR TERMINUS?
- It departs from BHAVNAGAR TERMINUS (BVC) at 11:00 and reaches BOTAD JUNCTION (BTD) at 13:10.
- What is the last station for 59204?
- The final station of 59204 is BOTAD JUNCTION (BTD), arriving at 13:10. You can see the full schedule and route map above.
- Where is train number 59204 right now?
- You can check the live location of 59204 (Bhavnagar Terminus - Botad Passenger) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
- How accurate is the running status for train 59204?
- The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
- Why is train 59204 showing offline or not updating?
- If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
- What is the total travel distance of 59204?
- It covers a total distance of 92 km from BHAVNAGAR TERMINUS to BOTAD JUNCTION in about 2 hours and 10 minutes.
- On which days does 59204 run?
- This train runs on: Daily. Please verify the running status before leaving for the station.
Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.