RailRadar LogoRailRadar

59229 Train Running Status Today — Botad - Bhavnagar Terminus Passenger

59229
Botad - Bhavnagar Terminus Passenger
Arrival
Day 1 - 19 Jul
Departure
59229Passenger

Botad - Bhavnagar Terminus Passenger

Runs On

MonTueWedThuFriSatSun
Distance
92 km
Duration
2h 20m
Halts
14
Avg Speed
39.4 km/h
Max Speed
72 km/h
Return
59230
Arrival
Day 1 - Jul 19
Departure
BOTAD JUNCTION
0.0 km
6:50AM6:50AM
7:00AM7:00AM
LATHIDAD
11.0 km
7:01AM7:01AM
7:09AM7:09AM
NINGALA
18.0 km
7:10AM7:10AM
7:17AM7:17AM
ALAMPAR
26.0 km
7:18AM7:18AM
7:25AM7:25AM
UJALVAV
33.0 km
7:26AM7:26AM
7:36AM7:36AM
DHOLA JUNCTION
43.0 km
7:37AM7:37AM
7:47AM7:47AM
SANOSARA
54.0 km
7:48AM7:48AM
7:54AM7:54AM
BAJUD
58.0 km
7:55AM7:55AM
8:00AM8:00AM
SONGADH
64.0 km
8:01AM8:01AM
8:04AM
MOTA SURKA
67.8 km
8:04AM
8:08AM8:08AM
SIHOR JUNCTION
72.0 km
8:09AM8:09AM
8:15AM8:15AM
KHODIYAR MANDIR
77.0 km
8:16AM8:16AM
8:25AM8:25AM
VARTEJ
82.0 km
8:26AM8:26AM
8:32AM
NARI ROAD
85.0 km
8:32AM
8:39AM8:39AM
BHAVNAGAR PARA
89.0 km
8:40AM8:40AM
9:10AM9:10AM
BHAVNAGAR TERMINUS
92.0 km
At BOTAD JUNCTION
ScheduledUpdated few seconds ago
BTDBVC
Next StopLTD11km - 7:00AM
To ReachBVC92km - 9:10AM

59229 Botad - Bhavnagar Terminus Passenger runs from BOTAD JUNCTION to BHAVNAGAR TERMINUS. It covers 92 km in 2h 20m, stopping at 14 stations. Departs BOTAD JUNCTION at 06:50 and arrives at BHAVNAGAR TERMINUS at 09:10. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.

59229 Schedule — 14 stops

IST
#StationArrDep
1BOTAD JUNCTIONBTDSRC06:50
2LATHIDADLTD07:0007:01
3NINGALANGA07:0907:10
4ALAMPARALMR07:1707:18
5UJALVAVUJ07:2507:26
6DHOLA JUNCTIONDLJ07:3607:37
7SANOSARASOA07:4707:48
8BAJUDBJUD07:5407:55
9SONGADHSGD08:0008:01
11SIHOR JUNCTIONSOJN08:0808:09
12KHODIYAR MANDIRKDMR08:1508:16
13VARTEJVTJ08:2508:26
15BHAVNAGAR PARABVP08:3908:40
16BHAVNAGAR TERMINUSBVC09:10DST

Frequently Asked Questions — 59229 Botad - Bhavnagar Terminus Passenger

What time does 59229 (Botad - Bhavnagar Terminus Passenger) start from BOTAD JUNCTION?
It departs from BOTAD JUNCTION (BTD) at 06:50 and reaches BHAVNAGAR TERMINUS (BVC) at 09:10.
What is the last station for 59229?
The final station of 59229 is BHAVNAGAR TERMINUS (BVC), arriving at 09:10. You can see the full schedule and route map above.
Where is train number 59229 right now?
You can check the live location of 59229 (Botad - Bhavnagar Terminus Passenger) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 59229?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 59229 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 59229?
It covers a total distance of 92 km from BOTAD JUNCTION to BHAVNAGAR TERMINUS in about 2 hours and 20 minutes.
On which days does 59229 run?
This train runs on: Daily. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.