59231 Train Running Status Today — Gandhigram - Bhavnagar Terminus Passenger
59231
Gandhigram - Bhavnagar Terminus Passenger59231
Gandhigram - Bhavnagar Terminus PassengerArrival
Day 1 - 18 Jul
Departure
59231Passenger
Gandhigram - Bhavnagar Terminus Passenger
Runs On
MonTueWedThuFriSatSun
Distance
251.1 kmDuration
4h 50mHalts
11Avg Speed
52 km/hMax Speed
136 km/hReturn
59232Arrival
Day 1 - Jul 18
Departure
GANDHIGRAM (AHMEDABAD)
0.0 km•
6:35AM6:35AM
6:44AM6:44AM
VASTRAPUR
6.1 km•
6:45AM6:45AM
6:55AM6:55AM
SARKHEJ
10.0 km•
6:56AM6:56AM
7:00AM
SANATHAL
13.9 km
7:00AM
7:05AM
MORAIYA
18.7 km
7:05AM
7:12AM
MATODA
25.4 km
7:12AM
7:19AM7:19AM
BAVLA
32.4 km•
7:20AM7:20AM
7:23AM
SALJADASALJADA
38.8 km
7:23AM
7:26AM7:26AM
DHOLKA
46.0 km•
7:27AM7:27AM
7:35AM
GODHANESHWAR
54.8 km
7:35AM
7:43AM
KOTH GANGAD
64.3 km
7:43AM
7:48AM
ARNEJ
70.4 km
7:48AM
7:53AM
LOTHAL BHURKHI
76.0 km
7:53AM
7:59AM
LOLIYA
83.4 km
7:59AM
8:04AM
HADALA BHAL
88.3 km
8:04AM
8:11AM
DHOLI BHAL
96.6 km
8:11AM
8:15AM
RAYAKA
101.0 km
8:15AM
8:21AM8:21AM
DHANDHUKA
108.3 km•
8:22AM8:22AM
8:31AM
TAGDI
118.6 km
8:31AM
8:36AM
BHIMNATH
125.5 km
8:36AM
8:41AM
CHANDARWA
131.0 km
8:41AM
8:47AM
JALILA ROAD
138.1 km
8:47AM
8:53AM
SARANGPUR ROAD
145.2 km
8:53AM
8:57AM
ALAU
150.8 km
8:57AM
9:04AM9:04AM
BOTAD JUNCTION
158.9 km•
9:06AM9:06AM
9:17AM
LATHIDAD
170.0 km
9:17AM
9:24AM
NINGALA
177.2 km
9:24AM
9:32AM
ALAMPAR
184.9 km
9:32AM
9:39AM
UJALVAV
191.5 km
9:39AM
9:49AM9:49AM
DHOLA JUNCTION
201.8 km•
9:50AM9:50AM
9:56AM
SANOSARA
212.9 km
9:56AM
9:58AM
BAJUD
217.3 km
9:58AM
10:01AM
SONGADH
223.2 km
10:01AM
10:03AM
MOTA SURKA
226.8 km
10:03AM
10:05AM10:05AM
SIHOR JUNCTION
230.7 km•
10:06AM10:06AM
10:15AM
KHODIYAR MANDIR
236.0 km
10:15AM
10:23AM
VARTEJ
241.3 km
10:23AM
10:28AM
NARI ROAD
244.4 km
10:28AM
10:35AM10:35AM
BHAVNAGAR PARA
248.5 km•
10:36AM10:36AM
11:25AM11:25AM
BHAVNAGAR TERMINUS
251.1 km•
At GANDHIGRAM (AHMEDABAD)
ScheduledUpdated few seconds ago
GGBVC
Next StopVTP6.1km - 6:44AM
To ReachBVC251.1km - 11:25AM
59231 Gandhigram - Bhavnagar Terminus Passenger runs from GANDHIGRAM (AHMEDABAD) to BHAVNAGAR TERMINUS. It covers 251.1 km in 4h 50m, stopping at 11 stations. Departs GANDHIGRAM (AHMEDABAD) at 06:35 and arrives at BHAVNAGAR TERMINUS at 11:25. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.
59231 Schedule — 11 stops
IST| # | Station | Arr | Dep |
|---|---|---|---|
| 1 | GANDHIGRAM (AHMEDABAD)GG | SRC | 06:35 |
| 2 | VASTRAPURVTP | 06:44 | 06:45 |
| 3 | SARKHEJSEJ | 06:55 | 06:56 |
| 7 | BAVLAVLA | 07:19 | 07:20 |
| 9 | DHOLKADOK | 07:26 | 07:27 |
| 18 | DHANDHUKADCK | 08:21 | 08:22 |
| 25 | BOTAD JUNCTIONBTD | 09:04 | 09:06 |
| 30 | DHOLA JUNCTIONDLJ | 09:49 | 09:50 |
| 35 | SIHOR JUNCTIONSOJN | 10:05 | 10:06 |
| 39 | BHAVNAGAR PARABVP | 10:35 | 10:36 |
| 40 | BHAVNAGAR TERMINUSBVC | 11:25 | DST |
Frequently Asked Questions — 59231 Gandhigram - Bhavnagar Terminus Passenger
- What time does 59231 (Gandhigram - Bhavnagar Terminus Passenger) start from GANDHIGRAM (AHMEDABAD)?
- It departs from GANDHIGRAM (AHMEDABAD) (GG) at 06:35 and reaches BHAVNAGAR TERMINUS (BVC) at 11:25.
- What is the last station for 59231?
- The final station of 59231 is BHAVNAGAR TERMINUS (BVC), arriving at 11:25. You can see the full schedule and route map above.
- Where is train number 59231 right now?
- You can check the live location of 59231 (Gandhigram - Bhavnagar Terminus Passenger) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
- How accurate is the running status for train 59231?
- The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
- Why is train 59231 showing offline or not updating?
- If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
- What is the total travel distance of 59231?
- It covers a total distance of 251.1 km from GANDHIGRAM (AHMEDABAD) to BHAVNAGAR TERMINUS in about 4 hours and 50 minutes.
- On which days does 59231 run?
- This train runs on: Daily. Please verify the running status before leaving for the station.
Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.