59271 Train Running Status Today — Botad - Bhavnagar Terminus Passenger
59271
Botad - Bhavnagar Terminus Passenger59271
Botad - Bhavnagar Terminus PassengerArrival
Day 1 - 18 Jul
Departure
59271Passenger
Botad - Bhavnagar Terminus Passenger
Runs On
MonTueWedThuFriSatSun
Distance
92 kmDuration
2h 20mHalts
11Avg Speed
39.4 km/hMax Speed
120 km/hReturn
59272Arrival
Day 1 - Jul 18
Departure
BOTAD JUNCTION
0.0 km•
3:50PM3:50PM
3:55PM
LATHIDAD
10.9 km
3:55PM
3:59PM3:59PM
NINGALA
18.0 km•
4:00PM4:00PM
4:07PM4:07PM
ALAMPAR
26.0 km•
4:08PM4:08PM
4:15PM4:15PM
UJALVAV
33.0 km•
4:16PM4:16PM
4:24PM4:24PM
DHOLA JUNCTION
43.0 km•
4:25PM4:25PM
4:35PM4:35PM
SANOSARA
54.0 km•
4:36PM4:36PM
4:43PM
BAJUD
58.3 km
4:43PM
4:53PM4:53PM
SONGADH
64.0 km•
4:54PM4:54PM
4:56PM
MOTA SURKA
67.8 km
4:56PM
4:58PM4:58PM
SIHOR JUNCTION
72.0 km•
4:59PM4:59PM
5:04PM
KHODIYAR MANDIR
77.0 km
5:04PM
5:10PM5:10PM
VARTEJ
82.0 km•
5:11PM5:11PM
5:15PM
NARI ROAD
85.0 km
5:15PM
5:21PM5:21PM
BHAVNAGAR PARA
89.0 km•
5:35PM5:35PM
6:10PM6:10PM
BHAVNAGAR TERMINUS
92.0 km•
At BOTAD JUNCTION
ScheduledUpdated few seconds ago
BTDBVC
Next StopNGA18km - 3:59PM
To ReachBVC92km - 6:10PM
59271 Botad - Bhavnagar Terminus Passenger runs from BOTAD JUNCTION to BHAVNAGAR TERMINUS. It covers 92 km in 2h 20m, stopping at 11 stations. Departs BOTAD JUNCTION at 15:50 and arrives at BHAVNAGAR TERMINUS at 18:10. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.
59271 Schedule — 11 stops
IST| # | Station | Arr | Dep |
|---|---|---|---|
| 1 | BOTAD JUNCTIONBTD | SRC | 15:50 |
| 3 | NINGALANGA | 15:59 | 16:00 |
| 4 | ALAMPARALMR | 16:07 | 16:08 |
| 5 | UJALVAVUJ | 16:15 | 16:16 |
| 6 | DHOLA JUNCTIONDLJ | 16:24 | 16:25 |
| 7 | SANOSARASOA | 16:35 | 16:36 |
| 9 | SONGADHSGD | 16:53 | 16:54 |
| 11 | SIHOR JUNCTIONSOJN | 16:58 | 16:59 |
| 13 | VARTEJVTJ | 17:10 | 17:11 |
| 15 | BHAVNAGAR PARABVP | 17:21 | 17:35 |
| 16 | BHAVNAGAR TERMINUSBVC | 18:10 | DST |
Frequently Asked Questions — 59271 Botad - Bhavnagar Terminus Passenger
- What time does 59271 (Botad - Bhavnagar Terminus Passenger) start from BOTAD JUNCTION?
- It departs from BOTAD JUNCTION (BTD) at 15:50 and reaches BHAVNAGAR TERMINUS (BVC) at 18:10.
- What is the last station for 59271?
- The final station of 59271 is BHAVNAGAR TERMINUS (BVC), arriving at 18:10. You can see the full schedule and route map above.
- Where is train number 59271 right now?
- You can check the live location of 59271 (Botad - Bhavnagar Terminus Passenger) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
- How accurate is the running status for train 59271?
- The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
- Why is train 59271 showing offline or not updating?
- If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
- What is the total travel distance of 59271?
- It covers a total distance of 92 km from BOTAD JUNCTION to BHAVNAGAR TERMINUS in about 2 hours and 20 minutes.
- On which days does 59271 run?
- This train runs on: Daily. Please verify the running status before leaving for the station.
Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.