RailRadar LogoRailRadar

61009 Train Running Status Today — Vasai Road - Diva MEMU

61009
Vasai Road - Diva MEMU
Arrival
Day 1 - 18 Jul
Departure
61009MEMU

Vasai Road - Diva MEMU

Runs On

MonTueWedThuFriSatSun
Distance
42 km
Duration
52m
Halts
7
Avg Speed
48.5 km/h
Max Speed
84 km/h
Return
61010
Arrival
Day 1 - Jul 18
Departure
VASAI ROAD
0.0 km
7:15PM7:15PM
7:21PM7:21PM
JUCHANDRA
4.0 km
7:22PM7:22PM
7:27PM7:27PM
KAMAN ROAD
11.0 km
7:28PM7:28PM
7:34PM7:34PM
KHARBAV
19.0 km
7:35PM7:35PM
7:42PM7:42PM
BHIWANDI ROAD
27.0 km
7:43PM7:43PM
7:46PM
ULHAS BRIDGE CABIN
29.8 km
7:46PM
7:49PM
DOMBIVLI CENTRAL CABIN
34.2 km
7:49PM
7:51PM7:51PM
KOPAR (UPPER LEVEL)
36.0 km
7:52PM7:52PM
7:54PM
DOMBIVLI CENTRAL CABIN
36.8 km
7:54PM
8:01PM
THAKURLI
39.6 km
8:01PM
8:02PM
1A STATION
40.1 km
8:02PM
8:05PM
DIVA JUNCTION CABIN
41.4 km
8:05PM
8:07PM8:07PM
DIVA JUNCTION
42.0 km
At VASAI ROAD
ScheduledUpdated few seconds ago
BSRDIVA
Next StopJCNR4km - 7:21PM
To ReachDIVA42km - 8:07PM

61009 Vasai Road - Diva MEMU runs from VASAI ROAD to DIVA JUNCTION. It covers 42 km in 0h 52m, stopping at 7 stations. Departs VASAI ROAD at 19:15 and arrives at DIVA JUNCTION at 20:07. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.

61009 Schedule — 7 stops

IST
#StationArrDep
1VASAI ROADBSRSRC19:15
2JUCHANDRAJCNR19:2119:22
3KAMAN ROADKARD19:2719:28
4KHARBAVKHBV19:3419:35
5BHIWANDI ROADBIRD19:4219:43
8KOPAR (UPPER LEVEL)KORU19:5119:52
13DIVA JUNCTIONDIVA20:07DST

Frequently Asked Questions — 61009 Vasai Road - Diva MEMU

What time does 61009 (Vasai Road - Diva MEMU) start from VASAI ROAD?
It departs from VASAI ROAD (BSR) at 19:15 and reaches DIVA JUNCTION (DIVA) at 20:07.
What is the last station for 61009?
The final station of 61009 is DIVA JUNCTION (DIVA), arriving at 20:07. You can see the full schedule and route map above.
Where is train number 61009 right now?
You can check the live location of 61009 (Vasai Road - Diva MEMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 61009?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 61009 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 61009?
It covers a total distance of 42 km from VASAI ROAD to DIVA JUNCTION in about 0 hours and 52 minutes.
On which days does 61009 run?
This train runs on: Daily. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.