61619 Train Running Status Today — Bina - Katni Murwara MEMU
61619
Bina - Katni Murwara MEMU61619
Bina - Katni Murwara MEMUArrival
Day 1 - 19 Jul
Departure
61619MEMU
Bina - Katni Murwara MEMU
Runs On
MonTueWedThuFriSatSun
Distance
260 kmDuration
7hHalts
30Avg Speed
37.1 km/hMax Speed
96 km/hReturn
61620Arrival
Day 1 - Jul 19
Departure
BINA JUNCTION
0.0 km•
10:20AM10:20AM
10:28AM10:28AM
BINA MALKHEDI JUNCTION
4.0 km•
10:30AM10:30AM
10:38AM10:38AM
BAGHORA
10.0 km•
10:40AM10:40AM
10:50AM10:50AM
KHURAI
22.0 km•
10:52AM10:52AM
11:00AM11:00AM
SUMRERI
31.0 km•
11:02AM11:02AM
11:13AM11:13AM
JERUWA KHERA
40.0 km•
11:15AM11:15AM
11:23AM11:23AM
ISARWARA
49.0 km•
11:25AM11:25AM
11:33AM11:33AM
NARIAOLI
56.0 km•
11:35AM11:35AM
11:43AM11:43AM
RATONA
68.0 km•
11:45AM11:45AM
12:00PM12:00PM
SAUGOR
75.0 km•
12:05PM12:05PM
12:18PM12:18PM
MAKRONIA
82.0 km•
12:20PM12:20PM
12:28PM12:28PM
LIDHORA KHURD
89.0 km•
12:30PM12:30PM
12:38PM12:38PM
GIRWAR
99.0 km•
12:40PM12:40PM
12:47PM12:47PM
DANGIDHAR
105.0 km•
12:48PM12:48PM
12:53PM12:53PM
GANESHGANJ
113.0 km•
12:55PM12:55PM
1:08PM1:08PM
PATHARIA
126.0 km•
1:10PM1:10PM
1:29PM1:29PM
ASLANA
139.0 km•
1:30PM1:30PM
1:55PM1:55PM
DAMOH
152.0 km•
2:00PM2:00PM
2:13PM2:13PM
KARHIYA BHADOLI
160.0 km•
2:15PM2:15PM
2:28PM2:28PM
BANDAKPUR
168.0 km•
2:30PM2:30PM
2:38PM2:38PM
GHATERA
178.0 km•
2:40PM2:40PM
2:48PM2:48PM
GOLAPATTI
186.0 km•
2:50PM2:50PM
2:58PM2:58PM
SAGONI
194.0 km•
3:00PM3:00PM
3:14PM3:14PM
RATANGAON
205.0 km•
3:15PM3:15PM
3:28PM3:28PM
SALAIA
213.0 km•
3:30PM3:30PM
3:38PM3:38PM
BAKHLETA
224.0 km•
3:40PM3:40PM
3:48PM3:48PM
RITHI
231.0 km•
3:50PM3:50PM
3:59PM3:59PM
PATOHAN
237.0 km•
4:00PM4:00PM
4:08PM4:08PM
HARDUA
246.0 km•
4:10PM4:10PM
4:49PM
MAJHAGAWAN PHATAK
253.7 km
4:49PM
5:04PM
NEW MAJHAGAWAN PHATAK
256.7 km
5:04PM
5:20PM5:20PM
KATNI MURWARA
260.0 km•
At BINA JUNCTION
ScheduledUpdated few seconds ago
BINAKMZ
Next StopMAKR4km - 10:28AM
To ReachKMZ260km - 5:20PM
61619 Bina - Katni Murwara MEMU runs from BINA JUNCTION to KATNI MURWARA. It covers 260 km in 7h, stopping at 30 stations. Departs BINA JUNCTION at 10:20 and arrives at KATNI MURWARA at 17:20. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.
61619 Schedule — 30 stops
IST| # | Station | Arr | Dep |
|---|---|---|---|
| 1 | BINA JUNCTIONBINA | SRC | 10:20 |
| 2 | BINA MALKHEDI JUNCTIONMAKR | 10:28 | 10:30 |
| 3 | BAGHORABJQ | 10:38 | 10:40 |
| 4 | KHURAIKYE | 10:50 | 10:52 |
| 5 | SUMRERISMRR | 11:00 | 11:02 |
| 6 | JERUWA KHERAJRK | 11:13 | 11:15 |
| 7 | ISARWARAISH | 11:23 | 11:25 |
| 8 | NARIAOLINOI | 11:33 | 11:35 |
| 9 | RATONARTZ | 11:43 | 11:45 |
| 10 | SAUGORSGO | 12:00 | 12:05 |
| 11 | MAKRONIAMKRN | 12:18 | 12:20 |
| 12 | LIDHORA KHURDLDA | 12:28 | 12:30 |
| 13 | GIRWARGW | 12:38 | 12:40 |
| 14 | DANGIDHARDGD | 12:47 | 12:48 |
| 15 | GANESHGANJGAJ | 12:53 | 12:55 |
| 16 | PATHARIAPHA | 13:08 | 13:10 |
| 17 | ASLANAANA | 13:29 | 13:30 |
| 18 | DAMOHDMO | 13:55 | 14:00 |
| 19 | KARHIYA BHADOLIKYX | 14:13 | 14:15 |
| 20 | BANDAKPURBNU | 14:28 | 14:30 |
| 21 | GHATERAGEA | 14:38 | 14:40 |
| 22 | GOLAPATTIGTY | 14:48 | 14:50 |
| 23 | SAGONISAO | 14:58 | 15:00 |
| 24 | RATANGAONRTGN | 15:14 | 15:15 |
| 25 | SALAIASYA | 15:28 | 15:30 |
| 26 | BAKHLETABQQ | 15:38 | 15:40 |
| 27 | RITHIREI | 15:48 | 15:50 |
| 28 | PATOHANPTHD | 15:59 | 16:00 |
| 29 | HARDUAHDU | 16:08 | 16:10 |
| 32 | KATNI MURWARAKMZ | 17:20 | DST |
Frequently Asked Questions — 61619 Bina - Katni Murwara MEMU
- What time does 61619 (Bina - Katni Murwara MEMU) start from BINA JUNCTION?
- It departs from BINA JUNCTION (BINA) at 10:20 and reaches KATNI MURWARA (KMZ) at 17:20.
- What is the last station for 61619?
- The final station of 61619 is KATNI MURWARA (KMZ), arriving at 17:20. You can see the full schedule and route map above.
- Where is train number 61619 right now?
- You can check the live location of 61619 (Bina - Katni Murwara MEMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
- How accurate is the running status for train 61619?
- The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
- Why is train 61619 showing offline or not updating?
- If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
- What is the total travel distance of 61619?
- It covers a total distance of 260 km from BINA JUNCTION to KATNI MURWARA in about 7 hours and 0 minutes.
- On which days does 61619 run?
- This train runs on: Daily. Please verify the running status before leaving for the station.
Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.