63516 Train Running Status Today — Asansol - Barddhaman MEMU
63516
Asansol - Barddhaman MEMU63516
Asansol - Barddhaman MEMUArrival
Day 1 - 19 Jul
Departure
63516MEMU
Asansol - Barddhaman MEMU
Runs On
MonTueWedThuFriSatSun
Distance
104 kmDuration
2h 20mHalts
14Avg Speed
44.6 km/hMax Speed
108 km/hReturn
63515Arrival
Day 1 - Jul 19
Departure
ASANSOL JUNCTION
0.0 km•
10:15AM10:15AM
10:17AM
ASANSOL EAST CABIN
2.0 km
10:17AM
10:20AM10:20AM
KALIPAHARI
5.0 km•
10:21AM10:21AM
10:22AM
ASANSOL EAST CABIN
6.2 km
10:22AM
10:23AM
ASANSOL JUNCTION
7.0 km
10:23AM
10:25AM
BARACHAK JUNCTION
8.9 km
10:25AM
10:31AM
NIMCHA
16.2 km
10:31AM
10:33AM10:33AM
RANIGANJ
18.0 km•
10:34AM10:34AM
10:36AM
BAKHTARNAGAR
20.6 km
10:36AM
10:37AM
EMPTY YARD ( ANDAL )
20.9 km
10:37AM
10:37AM
ANDAL WEST CABIN
22.0 km
10:37AM
10:39AM
ANDAL LINK CABIN
23.4 km
10:39AM
10:39AM
ANDAL EAST CABIN
24.1 km
10:39AM
10:41AM10:41AM
ANDAL JUNCTION
26.0 km•
10:42AM10:42AM
10:44AM
ANDAL LINK CABIN
28.6 km
10:44AM
10:45AM
ANDAL EAST CABIN
29.3 km
10:45AM
10:45AM
ANDAL INTER YARD CABIN
29.9 km
10:45AM
10:46AM
ANDAL EAST OUTER CABIN
30.4 km
10:46AM
10:46AM
PINJRAPOL
31.2 km
10:46AM
10:48AM10:48AM
WARIA
33.0 km•
10:49AM10:49AM
10:53AM
DURGAPUR COKE OVEN PLANT
39.4 km
10:53AM
10:54AM10:54AM
DURGAPUR
42.0 km•
10:56AM10:56AM
11:03AM11:03AM
RAJBANDH
50.0 km•
11:04AM11:04AM
11:10AM11:10AM
PANAGARH
57.0 km•
11:12AM11:12AM
11:21AM11:21AM
MANKAR
67.0 km•
11:22AM11:22AM
11:29AM11:29AM
PARAJ
75.0 km•
11:30AM11:30AM
11:36AM11:36AM
GALSI
81.0 km•
11:37AM11:37AM
11:53AM
KHANA LINK CABIN
87.8 km
11:53AM
12:00PM12:00PM
KHANA JUNCTION
91.0 km•
12:01PM12:01PM
12:06PM12:06PM
TALIT
97.0 km•
12:07PM12:07PM
12:31PM
BARDDHAMAN UP YARD
103.0 km
12:31PM
12:35PM12:35PM
BARDDHAMAN JUNCTION
104.0 km•
At ASANSOL JUNCTION
ScheduledUpdated few seconds ago
ASNBWN
Next StopKPK5km - 10:20AM
To ReachBWN104km - 12:35PM
63516 Asansol - Barddhaman MEMU runs from ASANSOL JUNCTION to BARDDHAMAN JUNCTION. It covers 104 km in 2h 20m, stopping at 14 stations. Departs ASANSOL JUNCTION at 10:15 and arrives at BARDDHAMAN JUNCTION at 12:35. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.
63516 Schedule — 14 stops
IST| # | Station | Arr | Dep |
|---|---|---|---|
| 1 | ASANSOL JUNCTIONASN | SRC | 10:15 |
| 3 | KALIPAHARIKPK | 10:20 | 10:21 |
| 8 | RANIGANJRNG | 10:33 | 10:34 |
| 14 | ANDAL JUNCTIONUDL | 10:41 | 10:42 |
| 20 | WARIAOYR | 10:48 | 10:49 |
| 22 | DURGAPURDGR | 10:54 | 10:56 |
| 23 | RAJBANDHRBH | 11:03 | 11:04 |
| 24 | PANAGARHPAN | 11:10 | 11:12 |
| 25 | MANKARMNAE | 11:21 | 11:22 |
| 26 | PARAJPAJ | 11:29 | 11:30 |
| 27 | GALSIGLI | 11:36 | 11:37 |
| 29 | KHANA JUNCTIONKAN | 12:00 | 12:01 |
| 30 | TALITTIT | 12:06 | 12:07 |
| 32 | BARDDHAMAN JUNCTIONBWN | 12:35 | DST |
Frequently Asked Questions — 63516 Asansol - Barddhaman MEMU
- What time does 63516 (Asansol - Barddhaman MEMU) start from ASANSOL JUNCTION?
- It departs from ASANSOL JUNCTION (ASN) at 10:15 and reaches BARDDHAMAN JUNCTION (BWN) at 12:35.
- What is the last station for 63516?
- The final station of 63516 is BARDDHAMAN JUNCTION (BWN), arriving at 12:35. You can see the full schedule and route map above.
- Where is train number 63516 right now?
- You can check the live location of 63516 (Asansol - Barddhaman MEMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
- How accurate is the running status for train 63516?
- The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
- Why is train 63516 showing offline or not updating?
- If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
- What is the total travel distance of 63516?
- It covers a total distance of 104 km from ASANSOL JUNCTION to BARDDHAMAN JUNCTION in about 2 hours and 20 minutes.
- On which days does 63516 run?
- This train runs on: Daily. Please verify the running status before leaving for the station.
Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.