RailRadar LogoRailRadar

64031 Train Running Status Today — Ghaziabad - Shakurbasti EMU

64031
Ghaziabad - Shakurbasti EMU
Arrival
Day 1 - 19 Jul
Departure
64031EMU

Ghaziabad - Shakurbasti EMU

Runs On

MonTueWedThuFriSatSun
Distance
37 km
Duration
1h 30m
Halts
13
Avg Speed
24.7 km/h
Max Speed
90 km/h
Arrival
Day 1 - Jul 19
Departure
GHAZIABAD JUNCTION
0.0 km
9:00AM9:00AM
9:08AM9:08AM
SAHIBABAD JUNCTION
7.0 km
9:09AM9:09AM
9:13AM
SHAHDARA B PANEL
9.6 km
9:13AM
9:14AM9:14AM
CHANDRA NAGAR HALT
10.0 km
9:15AM9:15AM
9:17AM9:17AM
ANAND VIHAR
13.0 km
9:18AM9:18AM
9:20AM9:20AM
MANDAWALI CHANDRA VIHAR
16.0 km
9:21AM9:21AM
9:25AM
PRAGATI MAIDAN
21.1 km
9:25AM
9:26AM9:26AM
TILAK BRIDGE
23.0 km
9:27AM9:27AM
9:30AM9:30AM
SHIVAJI BRIDGE
24.0 km
9:31AM9:31AM
9:34AM
TILAK BRIDGE
24.4 km
9:34AM
9:45AM9:45AM
NEW DELHI
26.0 km
9:47AM9:47AM
9:54AM9:54AM
SADAR BAZAR
27.0 km
9:55AM9:55AM
9:59AM
DELHI KISHAN GANJ OUTER CABIN
28.6 km
9:59AM
10:02AM10:02AM
DELHI KISHAN GANJ
30.0 km
10:03AM10:03AM
10:07AM10:07AM
VIVEKANAND PURI HALT
31.0 km
10:08AM10:08AM
10:12AM10:12AM
DAYABASTI
33.0 km
10:13AM10:13AM
10:21AM
DAYABASTI BYPASS A CABIN
34.9 km
10:21AM
10:30AM10:30AM
SHAKUR BASTI
37.0 km
At GHAZIABAD JUNCTION
ScheduledUpdated few seconds ago
GZBSSB
Next StopSBB7km - 9:08AM
To ReachSSB37km - 10:30AM

64031 Ghaziabad - Shakurbasti EMU runs from GHAZIABAD JUNCTION to SHAKUR BASTI. It covers 37 km in 1h 30m, stopping at 13 stations. Departs GHAZIABAD JUNCTION at 09:00 and arrives at SHAKUR BASTI at 10:30. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.

64031 Schedule — 13 stops

IST
#StationArrDep
1GHAZIABAD JUNCTIONGZBSRC09:00
2SAHIBABAD JUNCTIONSBB09:0809:09
4CHANDRA NAGAR HALTCNJ09:1409:15
5ANAND VIHARANVR09:1709:18
6MANDAWALI CHANDRA VIHARMWC09:2009:21
8TILAK BRIDGETKJ09:2609:27
9SHIVAJI BRIDGECSB09:3009:31
11NEW DELHINDLS09:4509:47
12SADAR BAZARDSB09:5409:55
14DELHI KISHAN GANJDKZ10:0210:03
15VIVEKANAND PURI HALTVVKP10:0710:08
16DAYABASTIDBSI10:1210:13
18SHAKUR BASTISSB10:30DST

Frequently Asked Questions — 64031 Ghaziabad - Shakurbasti EMU

What time does 64031 (Ghaziabad - Shakurbasti EMU) start from GHAZIABAD JUNCTION?
It departs from GHAZIABAD JUNCTION (GZB) at 09:00 and reaches SHAKUR BASTI (SSB) at 10:30.
What is the last station for 64031?
The final station of 64031 is SHAKUR BASTI (SSB), arriving at 10:30. You can see the full schedule and route map above.
Where is train number 64031 right now?
You can check the live location of 64031 (Ghaziabad - Shakurbasti EMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 64031?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 64031 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 64031?
It covers a total distance of 37 km from GHAZIABAD JUNCTION to SHAKUR BASTI in about 1 hours and 30 minutes.
On which days does 64031 run?
This train runs on: Daily. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.