64031 Train Running Status Today — Ghaziabad - Shakurbasti EMU
64031
Ghaziabad - Shakurbasti EMU64031
Ghaziabad - Shakurbasti EMUArrival
Day 1 - 19 Jul
Departure
64031EMU
Ghaziabad - Shakurbasti EMU
Runs On
MonTueWedThuFriSatSun
Distance
37 kmDuration
1h 30mHalts
13Avg Speed
24.7 km/hMax Speed
90 km/hArrival
Day 1 - Jul 19
Departure
GHAZIABAD JUNCTION
0.0 km•
9:00AM9:00AM
9:08AM9:08AM
SAHIBABAD JUNCTION
7.0 km•
9:09AM9:09AM
9:13AM
SHAHDARA B PANEL
9.6 km
9:13AM
9:14AM9:14AM
CHANDRA NAGAR HALT
10.0 km•
9:15AM9:15AM
9:17AM9:17AM
ANAND VIHAR
13.0 km•
9:18AM9:18AM
9:20AM9:20AM
MANDAWALI CHANDRA VIHAR
16.0 km•
9:21AM9:21AM
9:25AM
PRAGATI MAIDAN
21.1 km
9:25AM
9:26AM9:26AM
TILAK BRIDGE
23.0 km•
9:27AM9:27AM
9:30AM9:30AM
SHIVAJI BRIDGE
24.0 km•
9:31AM9:31AM
9:34AM
TILAK BRIDGE
24.4 km
9:34AM
9:45AM9:45AM
NEW DELHI
26.0 km•
9:47AM9:47AM
9:54AM9:54AM
SADAR BAZAR
27.0 km•
9:55AM9:55AM
9:59AM
DELHI KISHAN GANJ OUTER CABIN
28.6 km
9:59AM
10:02AM10:02AM
DELHI KISHAN GANJ
30.0 km•
10:03AM10:03AM
10:07AM10:07AM
VIVEKANAND PURI HALT
31.0 km•
10:08AM10:08AM
10:12AM10:12AM
DAYABASTI
33.0 km•
10:13AM10:13AM
10:21AM
DAYABASTI BYPASS A CABIN
34.9 km
10:21AM
10:30AM10:30AM
SHAKUR BASTI
37.0 km•
At GHAZIABAD JUNCTION
ScheduledUpdated few seconds ago
GZBSSB
Next StopSBB7km - 9:08AM
To ReachSSB37km - 10:30AM
64031 Ghaziabad - Shakurbasti EMU runs from GHAZIABAD JUNCTION to SHAKUR BASTI. It covers 37 km in 1h 30m, stopping at 13 stations. Departs GHAZIABAD JUNCTION at 09:00 and arrives at SHAKUR BASTI at 10:30. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.
64031 Schedule — 13 stops
IST| # | Station | Arr | Dep |
|---|---|---|---|
| 1 | GHAZIABAD JUNCTIONGZB | SRC | 09:00 |
| 2 | SAHIBABAD JUNCTIONSBB | 09:08 | 09:09 |
| 4 | CHANDRA NAGAR HALTCNJ | 09:14 | 09:15 |
| 5 | ANAND VIHARANVR | 09:17 | 09:18 |
| 6 | MANDAWALI CHANDRA VIHARMWC | 09:20 | 09:21 |
| 8 | TILAK BRIDGETKJ | 09:26 | 09:27 |
| 9 | SHIVAJI BRIDGECSB | 09:30 | 09:31 |
| 11 | NEW DELHINDLS | 09:45 | 09:47 |
| 12 | SADAR BAZARDSB | 09:54 | 09:55 |
| 14 | DELHI KISHAN GANJDKZ | 10:02 | 10:03 |
| 15 | VIVEKANAND PURI HALTVVKP | 10:07 | 10:08 |
| 16 | DAYABASTIDBSI | 10:12 | 10:13 |
| 18 | SHAKUR BASTISSB | 10:30 | DST |
Frequently Asked Questions — 64031 Ghaziabad - Shakurbasti EMU
- What time does 64031 (Ghaziabad - Shakurbasti EMU) start from GHAZIABAD JUNCTION?
- It departs from GHAZIABAD JUNCTION (GZB) at 09:00 and reaches SHAKUR BASTI (SSB) at 10:30.
- What is the last station for 64031?
- The final station of 64031 is SHAKUR BASTI (SSB), arriving at 10:30. You can see the full schedule and route map above.
- Where is train number 64031 right now?
- You can check the live location of 64031 (Ghaziabad - Shakurbasti EMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
- How accurate is the running status for train 64031?
- The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
- Why is train 64031 showing offline or not updating?
- If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
- What is the total travel distance of 64031?
- It covers a total distance of 37 km from GHAZIABAD JUNCTION to SHAKUR BASTI in about 1 hours and 30 minutes.
- On which days does 64031 run?
- This train runs on: Daily. Please verify the running status before leaving for the station.
Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.