RailRadar LogoRailRadar

64170 Train Running Status Today — Etawah - Phaphund MEMU

64170
Etawah - Phaphund MEMU
Arrival
Day 1 - 19 Jul
Departure
64170MEMU

Etawah - Phaphund MEMU

Runs On

MonTueWedThuFriSatSun
Distance
56 km
Duration
55m
Halts
7
Avg Speed
61.1 km/h
Max Speed
77.1 km/h
Return
64169
Arrival
Day 1 - Jul 19
Departure
ETAWAH JUNCTION
0.0 km
5:00AM5:00AM
5:09AM5:09AM
EKDIL
10.0 km
5:10AM5:10AM
5:18AM5:18AM
BHARTHANA
20.0 km
5:19AM5:19AM
5:27AM5:27AM
SAMHON
30.0 km
5:28AM5:28AM
5:31AM
GHASARA HALT
33.6 km
5:31AM
5:36AM5:36AM
ACHALDA
39.0 km
5:37AM5:37AM
5:44AM5:44AM
PATA
48.0 km
5:45AM5:45AM
5:49AM
KANCHAUSI
51.6 km
5:49AM
5:51AM
PARJANI
52.7 km
5:51AM
5:52AM
JHINJHAK
53.9 km
5:52AM
5:55AM5:55AM
PHAPHUND
56.0 km
At ETAWAH JUNCTION
ScheduledUpdated few seconds ago
ETWPHD
Next StopEKL10km - 5:09AM
To ReachPHD56km - 5:55AM

64170 Etawah - Phaphund MEMU runs from ETAWAH JUNCTION to PHAPHUND. It covers 56 km in 0h 55m, stopping at 7 stations. Departs ETAWAH JUNCTION at 05:00 and arrives at PHAPHUND at 05:55. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.

64170 Schedule — 7 stops

IST
#StationArrDep
1ETAWAH JUNCTIONETWSRC05:00
2EKDILEKL05:0905:10
3BHARTHANABNT05:1805:19
4SAMHONSHW05:2705:28
6ACHALDAULD05:3605:37
7PATAPATA05:4405:45
11PHAPHUNDPHD05:55DST

Frequently Asked Questions — 64170 Etawah - Phaphund MEMU

What time does 64170 (Etawah - Phaphund MEMU) start from ETAWAH JUNCTION?
It departs from ETAWAH JUNCTION (ETW) at 05:00 and reaches PHAPHUND (PHD) at 05:55.
What is the last station for 64170?
The final station of 64170 is PHAPHUND (PHD), arriving at 05:55. You can see the full schedule and route map above.
Where is train number 64170 right now?
You can check the live location of 64170 (Etawah - Phaphund MEMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 64170?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 64170 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 64170?
It covers a total distance of 56 km from ETAWAH JUNCTION to PHAPHUND in about 0 hours and 55 minutes.
On which days does 64170 run?
This train runs on: Daily. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.