RailRadar LogoRailRadar

64425 Train Running Status Today — Ghaziabad - New Delhi EMU

64425
Ghaziabad - New Delhi EMU
Arrival
Day 1 - 18 Jul
Departure
64425EMU

Ghaziabad - New Delhi EMU

Runs On

MonTueWedThuFriSatSun
Distance
26 km
Duration
55m
Halts
8
Avg Speed
28.4 km/h
Max Speed
105 km/h
Return
64426
Arrival
Day 1 - Jul 18
Departure
GHAZIABAD JUNCTION
0.0 km
12:40PM12:40PM
12:48PM12:48PM
SAHIBABAD JUNCTION
7.0 km
12:49PM12:49PM
12:53PM
SHAHDARA B PANEL
9.6 km
12:53PM
12:54PM12:54PM
CHANDRA NAGAR HALT
10.0 km
12:55PM12:55PM
12:57PM12:57PM
ANAND VIHAR
13.0 km
12:58PM12:58PM
1:00PM1:00PM
MANDAWALI CHANDRA VIHAR
16.0 km
1:01PM1:01PM
1:04PM
PRAGATI MAIDAN
21.1 km
1:04PM
1:05PM1:05PM
TILAK BRIDGE
23.0 km
1:06PM1:06PM
1:09PM1:09PM
SHIVAJI BRIDGE
24.0 km
1:10PM1:10PM
1:16PM
TILAK BRIDGE
24.4 km
1:16PM
1:35PM1:35PM
NEW DELHI
26.0 km
At GHAZIABAD JUNCTION
ScheduledUpdated few seconds ago
GZBNDLS
Next StopSBB7km - 12:48PM
To ReachNDLS26km - 1:35PM

64425 Ghaziabad - New Delhi EMU runs from GHAZIABAD JUNCTION to NEW DELHI. It covers 26 km in 0h 55m, stopping at 8 stations. Departs GHAZIABAD JUNCTION at 12:40 and arrives at NEW DELHI at 13:35. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.

64425 Schedule — 8 stops

IST
#StationArrDep
1GHAZIABAD JUNCTIONGZBSRC12:40
2SAHIBABAD JUNCTIONSBB12:4812:49
4CHANDRA NAGAR HALTCNJ12:5412:55
5ANAND VIHARANVR12:5712:58
6MANDAWALI CHANDRA VIHARMWC13:0013:01
8TILAK BRIDGETKJ13:0513:06
9SHIVAJI BRIDGECSB13:0913:10
11NEW DELHINDLS13:35DST

Frequently Asked Questions — 64425 Ghaziabad - New Delhi EMU

What time does 64425 (Ghaziabad - New Delhi EMU) start from GHAZIABAD JUNCTION?
It departs from GHAZIABAD JUNCTION (GZB) at 12:40 and reaches NEW DELHI (NDLS) at 13:35.
What is the last station for 64425?
The final station of 64425 is NEW DELHI (NDLS), arriving at 13:35. You can see the full schedule and route map above.
Where is train number 64425 right now?
You can check the live location of 64425 (Ghaziabad - New Delhi EMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 64425?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 64425 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 64425?
It covers a total distance of 26 km from GHAZIABAD JUNCTION to NEW DELHI in about 0 hours and 55 minutes.
On which days does 64425 run?
This train runs on: Daily. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.