64425 Train Running Status Today — Ghaziabad - New Delhi EMU
64425
Ghaziabad - New Delhi EMU64425
Ghaziabad - New Delhi EMUArrival
Day 1 - 18 Jul
Departure
64425EMU
Ghaziabad - New Delhi EMU
Runs On
MonTueWedThuFriSatSun
Distance
26 kmDuration
55mHalts
8Avg Speed
28.4 km/hMax Speed
105 km/hReturn
64426Arrival
Day 1 - Jul 18
Departure
GHAZIABAD JUNCTION
0.0 km•
12:40PM12:40PM
12:48PM12:48PM
SAHIBABAD JUNCTION
7.0 km•
12:49PM12:49PM
12:53PM
SHAHDARA B PANEL
9.6 km
12:53PM
12:54PM12:54PM
CHANDRA NAGAR HALT
10.0 km•
12:55PM12:55PM
12:57PM12:57PM
ANAND VIHAR
13.0 km•
12:58PM12:58PM
1:00PM1:00PM
MANDAWALI CHANDRA VIHAR
16.0 km•
1:01PM1:01PM
1:04PM
PRAGATI MAIDAN
21.1 km
1:04PM
1:05PM1:05PM
TILAK BRIDGE
23.0 km•
1:06PM1:06PM
1:09PM1:09PM
SHIVAJI BRIDGE
24.0 km•
1:10PM1:10PM
1:16PM
TILAK BRIDGE
24.4 km
1:16PM
1:35PM1:35PM
NEW DELHI
26.0 km•
At GHAZIABAD JUNCTION
ScheduledUpdated few seconds ago
GZBNDLS
Next StopSBB7km - 12:48PM
To ReachNDLS26km - 1:35PM
64425 Ghaziabad - New Delhi EMU runs from GHAZIABAD JUNCTION to NEW DELHI. It covers 26 km in 0h 55m, stopping at 8 stations. Departs GHAZIABAD JUNCTION at 12:40 and arrives at NEW DELHI at 13:35. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.
64425 Schedule — 8 stops
IST| # | Station | Arr | Dep |
|---|---|---|---|
| 1 | GHAZIABAD JUNCTIONGZB | SRC | 12:40 |
| 2 | SAHIBABAD JUNCTIONSBB | 12:48 | 12:49 |
| 4 | CHANDRA NAGAR HALTCNJ | 12:54 | 12:55 |
| 5 | ANAND VIHARANVR | 12:57 | 12:58 |
| 6 | MANDAWALI CHANDRA VIHARMWC | 13:00 | 13:01 |
| 8 | TILAK BRIDGETKJ | 13:05 | 13:06 |
| 9 | SHIVAJI BRIDGECSB | 13:09 | 13:10 |
| 11 | NEW DELHINDLS | 13:35 | DST |
Frequently Asked Questions — 64425 Ghaziabad - New Delhi EMU
- What time does 64425 (Ghaziabad - New Delhi EMU) start from GHAZIABAD JUNCTION?
- It departs from GHAZIABAD JUNCTION (GZB) at 12:40 and reaches NEW DELHI (NDLS) at 13:35.
- What is the last station for 64425?
- The final station of 64425 is NEW DELHI (NDLS), arriving at 13:35. You can see the full schedule and route map above.
- Where is train number 64425 right now?
- You can check the live location of 64425 (Ghaziabad - New Delhi EMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
- How accurate is the running status for train 64425?
- The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
- Why is train 64425 showing offline or not updating?
- If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
- What is the total travel distance of 64425?
- It covers a total distance of 26 km from GHAZIABAD JUNCTION to NEW DELHI in about 0 hours and 55 minutes.
- On which days does 64425 run?
- This train runs on: Daily. Please verify the running status before leaving for the station.
Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.