RailRadar LogoRailRadar

66501 Train Running Status Today — SSS Hubballi - Vijayapura MEMU

66501
SSS Hubballi - Vijayapura MEMU
Arrival
Day 1 - 18 Jul
Departure
66501EMU

SSS Hubballi - Vijayapura MEMU

Runs On

MonTueWedThuFriSatSun
Distance
249.5 km
Duration
5h 25m
Halts
13
Avg Speed
46.1 km/h
Max Speed
67 km/h
Return
66502
Arrival
Day 1 - Jul 18
Departure
SSS HUBBALLI JUNCTION (HUBLI)
0.0 km
4:45PM4:45PM
4:47PM
HUBBALLI EAST CABIN
1.6 km
4:47PM
4:48PM
HUBBALLI OUTER CABIN
2.4 km
4:48PM
4:50PM4:50PM
BAMMAPUR
4.7 km
4:50PM4:50PM
4:56PM4:56PM
KUSUGAL
9.6 km
4:56PM4:56PM
5:07PM
HEBSUR
18.8 km
5:07PM
5:12PM
SISVINHALLI
22.6 km
5:12PM
5:17PM
NAVALGUND ROAD
26.5 km
5:17PM
5:27PM
ANNIGERI
34.9 km
5:27PM
5:32PM
KONDIKOPPA
39.1 km
5:32PM
5:40PM
HULKOTI
45.2 km
5:40PM
5:49PM
BINKADAKATTI
52.6 km
5:49PM
5:55PM5:55PM
GADAG JUNCTION
57.6 km
6:00PM6:00PM
6:02PM
GADAG BYPASS CABIN
59.6 km
6:02PM
6:07PM
HOMBAL
64.5 km
6:07PM
6:11PM
BALGANUR
68.9 km
6:11PM
6:20PM
SOMANKATTI
78.2 km
6:20PM
6:30PM6:30PM
MALLAPUR
89.1 km
6:31PM6:31PM
6:41PM
SOMANKATTI
99.7 km
6:41PM
6:47PM6:47PM
HOLE ALUR
106.5 km
6:48PM6:48PM
6:50PM
JAKANUR
108.5 km
6:50PM
6:57PM
LAKHMAPUR
114.3 km
6:57PM
7:02PM
YARAGOPPA
118.9 km
7:02PM
7:09PM7:09PM
BADAMI
125.6 km
7:10PM7:10PM
7:22PM7:22PM
GULEDAGUDDA ROAD
139.0 km
7:23PM7:23PM
7:36PM
NAVANAGARA
148.9 km
7:36PM
7:40PM7:40PM
BAGALKOT
152.1 km
7:42PM7:42PM
7:49PM
MUGALALLI HALT
160.0 km
7:49PM
7:54PM
KADLIMATTI
165.1 km
7:54PM
8:00PM
JADRAMAKUNTI
172.3 km
8:00PM
8:05PM
SITIMANI
177.8 km
8:05PM
8:10PM
KUDALA SANGAM ROAD
182.8 km
8:10PM
8:14PM8:14PM
ALMATTI
187.2 km
8:15PM8:15PM
8:22PM
BENAL HALT
192.1 km
8:22PM
8:28PM
WANDAL
196.4 km
8:28PM
8:35PM
ANGADGERI HALT
201.2 km
8:35PM
8:41PM8:41PM
BASAVANA BAGEWADI ROAD
205.0 km
8:42PM8:42PM
8:46PM
KUDGI
209.5 km
8:46PM
8:53PM
KALGURKI HALT
216.2 km
8:53PM
9:00PM
MULVAD
223.7 km
9:00PM
9:06PM
HONAGANAHALLI
230.7 km
9:06PM
9:11PM
JUMNAL
235.7 km
9:11PM
9:20PM9:20PM
IBRAHIMPUR
245.2 km
9:21PM9:21PM
10:10PM10:10PM
VIJAYAPURA (BIJAPUR)
249.5 km
At SSS HUBBALLI JUNCTION (HUBLI)
ScheduledUpdated few seconds ago
UBLBJP
Next StopBMAP4.7km - 4:50PM
To ReachBJP249.5km - 10:10PM

66501 SSS Hubballi - Vijayapura MEMU runs from SSS HUBBALLI JUNCTION (HUBLI) to VIJAYAPURA (BIJAPUR). It covers 249.5 km in 5h 25m, stopping at 13 stations. Departs SSS HUBBALLI JUNCTION (HUBLI) at 16:45 and arrives at VIJAYAPURA (BIJAPUR) at 22:10. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.

66501 Schedule — 13 stops

IST
#StationArrDep
1SSS HUBBALLI JUNCTION (HUBLI)UBLSRC16:45
4BAMMAPURBMAP16:5016:50
5KUSUGALKUG16:5616:56
13GADAG JUNCTIONGDG17:5518:00
18MALLAPURMLP18:3018:31
20HOLE ALURHLAR18:4718:48
24BADAMIBDM19:0919:10
25GULEDAGUDDA ROADGED19:2219:23
27BAGALKOTBGK19:4019:42
33ALMATTILMT20:1420:15
37BASAVANA BAGEWADI ROADBSRX20:4120:42
43IBRAHIMPURIMR21:2021:21
44VIJAYAPURA (BIJAPUR)BJP22:10DST

Frequently Asked Questions — 66501 SSS Hubballi - Vijayapura MEMU

What time does 66501 (SSS Hubballi - Vijayapura MEMU) start from SSS HUBBALLI JUNCTION (HUBLI)?
It departs from SSS HUBBALLI JUNCTION (HUBLI) (UBL) at 16:45 and reaches VIJAYAPURA (BIJAPUR) (BJP) at 22:10.
What is the last station for 66501?
The final station of 66501 is VIJAYAPURA (BIJAPUR) (BJP), arriving at 22:10. You can see the full schedule and route map above.
Where is train number 66501 right now?
You can check the live location of 66501 (SSS Hubballi - Vijayapura MEMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 66501?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 66501 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 66501?
It covers a total distance of 249.5 km from SSS HUBBALLI JUNCTION (HUBLI) to VIJAYAPURA (BIJAPUR) in about 5 hours and 25 minutes.
On which days does 66501 run?
This train runs on: Daily. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.