RailRadar LogoRailRadar

66502 Train Running Status Today — Vijayapura - SSS Hubballi MEMU

66502
Vijayapura - SSS Hubballi MEMU
Arrival
Day 1 - 18 Jul
Departure
66502EMU

Vijayapura - SSS Hubballi MEMU

Runs On

MonTueWedThuFriSatSun
Distance
249.5 km
Duration
5h 15m
Halts
12
Avg Speed
47.5 km/h
Max Speed
73.1 km/h
Return
66501
Arrival
Day 1 - Jul 18
Departure
VIJAYAPURA (BIJAPUR)
0.0 km
5:45AM5:45AM
5:51AM5:51AM
IBRAHIMPUR
4.3 km
5:52AM5:52AM
6:00AM
JUMNAL
13.8 km
6:00AM
6:04AM
HONAGANAHALLI
18.8 km
6:04AM
6:10AM
MULVAD
25.8 km
6:10AM
6:16AM
KALGURKI HALT
33.3 km
6:16AM
6:21AM
KUDGI
40.0 km
6:21AM
6:25AM6:25AM
BASAVANA BAGEWADI ROAD
44.5 km
6:26AM6:26AM
6:30AM
ANGADGERI HALT
48.3 km
6:30AM
6:35AM
WANDAL
53.1 km
6:35AM
6:39AM
BENAL HALT
57.4 km
6:39AM
6:44AM6:44AM
ALMATTI
62.3 km
6:45AM6:45AM
6:50AM
KUDALA SANGAM ROAD
66.7 km
6:50AM
6:55AM
SITIMANI
71.7 km
6:55AM
7:01AM
JADRAMAKUNTI
77.2 km
7:01AM
7:09AM
KADLIMATTI
84.4 km
7:09AM
7:14AM
MUGALALLI HALT
89.5 km
7:14AM
7:23AM7:23AM
BAGALKOT
97.4 km
7:25AM7:25AM
7:28AM
NAVANAGARA
100.6 km
7:28AM
7:36AM7:36AM
GULEDAGUDDA ROAD
110.5 km
7:37AM7:37AM
7:50AM7:50AM
BADAMI
123.9 km
7:51AM7:51AM
7:57AM
YARAGOPPA
130.6 km
7:57AM
8:02AM
LAKHMAPUR
135.2 km
8:02AM
8:07AM
JAKANUR
141.0 km
8:07AM
8:09AM8:09AM
HOLE ALUR
143.0 km
8:10AM8:10AM
8:17AM
SOMANKATTI
149.8 km
8:17AM
8:27AM8:27AM
MALLAPUR
160.4 km
8:28AM8:28AM
8:36AM
SOMANKATTI
165.4 km
8:36AM
9:01AM
BALGANUR
180.6 km
9:01AM
9:09AM
HOMBAL
185.0 km
9:09AM
9:17AM
GADAG BYPASS CABIN
189.9 km
9:17AM
9:20AM9:20AM
GADAG JUNCTION
191.9 km
9:25AM9:25AM
9:33AM
BINKADAKATTI
196.9 km
9:33AM
9:45AM
HULKOTI
204.3 km
9:45AM
9:55AM
KONDIKOPPA
210.4 km
9:55AM
10:02AM
ANNIGERI
214.6 km
10:02AM
10:16AM
NAVALGUND ROAD
223.1 km
10:16AM
10:23AM
SISVINHALLI
226.9 km
10:23AM
10:29AM
HEBSUR
230.8 km
10:29AM
10:44AM
KUSUGAL
239.9 km
10:44AM
10:52AM10:52AM
BAMMAPUR
244.8 km
10:52AM10:52AM
10:56AM
HUBBALLI OUTER CABIN
247.1 km
10:56AM
10:57AM
HUBBALLI EAST CABIN
247.9 km
10:57AM
11:00AM11:00AM
SSS HUBBALLI JUNCTION (HUBLI)
249.5 km
At VIJAYAPURA (BIJAPUR)
ScheduledUpdated few seconds ago
BJPUBL
Next StopIMR4.3km - 5:51AM
To ReachUBL249.5km - 11:00AM

66502 Vijayapura - SSS Hubballi MEMU runs from VIJAYAPURA (BIJAPUR) to SSS HUBBALLI JUNCTION (HUBLI). It covers 249.5 km in 5h 15m, stopping at 12 stations. Departs VIJAYAPURA (BIJAPUR) at 05:45 and arrives at SSS HUBBALLI JUNCTION (HUBLI) at 11:00. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.

66502 Schedule — 12 stops

IST
#StationArrDep
1VIJAYAPURA (BIJAPUR)BJPSRC05:45
2IBRAHIMPURIMR05:5105:52
8BASAVANA BAGEWADI ROADBSRX06:2506:26
12ALMATTILMT06:4406:45
18BAGALKOTBGK07:2307:25
20GULEDAGUDDA ROADGED07:3607:37
21BADAMIBDM07:5007:51
25HOLE ALURHLAR08:0908:10
27MALLAPURMLP08:2708:28
32GADAG JUNCTIONGDG09:2009:25
41BAMMAPURBMAP10:5210:52
44SSS HUBBALLI JUNCTION (HUBLI)UBL11:00DST

Frequently Asked Questions — 66502 Vijayapura - SSS Hubballi MEMU

What time does 66502 (Vijayapura - SSS Hubballi MEMU) start from VIJAYAPURA (BIJAPUR)?
It departs from VIJAYAPURA (BIJAPUR) (BJP) at 05:45 and reaches SSS HUBBALLI JUNCTION (HUBLI) (UBL) at 11:00.
What is the last station for 66502?
The final station of 66502 is SSS HUBBALLI JUNCTION (HUBLI) (UBL), arriving at 11:00. You can see the full schedule and route map above.
Where is train number 66502 right now?
You can check the live location of 66502 (Vijayapura - SSS Hubballi MEMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 66502?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 66502 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 66502?
It covers a total distance of 249.5 km from VIJAYAPURA (BIJAPUR) to SSS HUBBALLI JUNCTION (HUBLI) in about 5 hours and 15 minutes.
On which days does 66502 run?
This train runs on: Daily. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.