RailRadar LogoRailRadar

66561 Train Running Status Today — Tumakuru - Yesvantpur MEMU

66561
Tumakuru - Yesvantpur MEMU
Arrival
Day 1 - 18 Jul
Departure
66561MEMU

Tumakuru - Yesvantpur MEMU

Runs On

MonTueWedThuFriSatSun
Distance
65 km
Duration
1h 30m
Halts
12
Avg Speed
43.3 km/h
Max Speed
75 km/h
Return
66562
Arrival
Day 1 - Jul 18
Departure
TUMAKURU (TUMKUR)
0.0 km
8:55AM9:01AM
8:56AM9:05AM
KYATSANDRA
6.0 km
8:57AM
8:58AM
KYATSANDRA DEPOT
6.8 km
8:58AM
9:08AM
HIREHALLI
12.0 km
9:09AM9:11AM
9:17AM
DOBBSPET
21.0 km
9:18AM
9:21AM9:18AM
NIDVANDA
24.0 km
9:22AM9:25AM
9:25AM
MUDDALINGANAHALLI HALT
26.0 km
9:26AM9:29AM
9:33AM9:37AM
DODBELE
33.0 km
9:34AM9:37AM
9:38AM9:40AM
BHAIRANAYAKANAHALLI
37.0 km
9:39AM9:44AM
9:45AM9:48AM
GOLHALLI
44.0 km
9:46AM9:50AM
9:54AM9:55AM
SOLDEVANAHALLI
54.0 km
9:55AM9:59AM
9:58AM9:59AM
CHIKKA BANAVARA JUNCTION
57.0 km
9:59AM10:07AM
10:17AM
YESVANTPUR BYPASS RUNNING LINE
62.5 km
10:17AM
10:25AM10:31AM
YESVANTPUR JUNCTION
65.0 km
Arrived at YESVANTPUR JUNCTION
ArrivedUpdated 1 hour 47 minutes ago
TKYPR
Next Stop---- - --
To ReachYPR65km - 10:31AM
Delayed by 5 minutes at YPR

66561 Tumakuru - Yesvantpur MEMU runs from TUMAKURU (TUMKUR) to YESVANTPUR JUNCTION. It covers 65 km in 1h 30m, stopping at 12 stations. Departs TUMAKURU (TUMKUR) at 08:55 and arrives at YESVANTPUR JUNCTION at 10:25. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. This train runs on Mon, Tue, Wed, Thu, Fri, Sat.

66561 Schedule — 12 stops

IST
#StationArrDep
1TUMAKURU (TUMKUR)TKSRC08:55
2KYATSANDRAKIAT08:5608:57
4HIREHALLIHHL09:0809:09
5DOBBSPETDBS09:1709:18
6NIDVANDANDV09:2109:22
7MUDDALINGANAHALLI HALTMDLL09:2509:26
8DODBELEDBL09:3309:34
9BHAIRANAYAKANAHALLIBNKH09:3809:39
10GOLHALLIGHL09:4509:46
11SOLDEVANAHALLISDVL09:5409:55
12CHIKKA BANAVARA JUNCTIONBAW09:5809:59
14YESVANTPUR JUNCTIONYPR10:25DST

Frequently Asked Questions — 66561 Tumakuru - Yesvantpur MEMU

What time does 66561 (Tumakuru - Yesvantpur MEMU) start from TUMAKURU (TUMKUR)?
It departs from TUMAKURU (TUMKUR) (TK) at 08:55 and reaches YESVANTPUR JUNCTION (YPR) at 10:25.
What is the last station for 66561?
The final station of 66561 is YESVANTPUR JUNCTION (YPR), arriving at 10:25. You can see the full schedule and route map above.
Where is train number 66561 right now?
You can check the live location of 66561 (Tumakuru - Yesvantpur MEMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 66561?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 66561 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 66561?
It covers a total distance of 65 km from TUMAKURU (TUMKUR) to YESVANTPUR JUNCTION in about 1 hours and 30 minutes.
On which days does 66561 run?
This train runs on: Mon, Tue, Wed, Thu, Fri, Sat. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.