RailRadar LogoRailRadar

67283 Train Running Status Today — Bhimavaram Junction - Nidadavolu MEMU

67283
Bhimavaram Junction - Nidadavolu MEMU
Arrival
Day 1 - 18 Jul
Departure
67283MEMU

Bhimavaram Junction - Nidadavolu MEMU

Runs On

MonTueWedThuFriSatSun
Distance
46 km
Duration
1h 30m
Halts
12
Avg Speed
30.7 km/h
Max Speed
100 km/h
Return
67284
Arrival
Day 1 - Jul 18
Departure
BHIMAVARAM JUNCTION
0.0 km
4:10PM4:10PM
4:11PM
BHIMAVARAM A CABIN
1.3 km
4:11PM
4:14PM4:14PM
VENDRA
6.0 km
4:15PM4:15PM
4:17PM4:17PM
LAKSHMINARAYANAPURAM
8.0 km
4:18PM4:18PM
4:20PM4:20PM
ARAVALLI
11.0 km
4:21PM4:21PM
4:24PM4:24PM
MANCHILI
16.0 km
4:25PM4:25PM
4:29PM4:29PM
ATTILI
18.0 km
4:30PM4:30PM
4:33PM4:33PM
RELANGI
23.0 km
4:34PM4:34PM
4:36PM4:36PM
VELPURU
25.0 km
4:37PM4:37PM
4:44PM4:44PM
TANUKU
28.0 km
4:45PM4:45PM
4:48PM4:48PM
SATYAVADA
33.0 km
4:49PM4:49PM
4:54PM4:54PM
KALDHARI
38.0 km
4:55PM4:55PM
5:40PM5:40PM
NIDADAVOLU JUNCTION
46.0 km
At BHIMAVARAM JUNCTION
ScheduledUpdated few seconds ago
BVRMNDD
Next StopVND6km - 4:14PM
To ReachNDD46km - 5:40PM

67283 Bhimavaram Junction - Nidadavolu MEMU runs from BHIMAVARAM JUNCTION to NIDADAVOLU JUNCTION. It covers 46 km in 1h 30m, stopping at 12 stations. Departs BHIMAVARAM JUNCTION at 16:10 and arrives at NIDADAVOLU JUNCTION at 17:40. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.

67283 Schedule — 12 stops

IST
#StationArrDep
1BHIMAVARAM JUNCTIONBVRMSRC16:10
3VENDRAVND16:1416:15
4LAKSHMINARAYANAPURAMLKSH16:1716:18
5ARAVALLIAVLI16:2016:21
6MANCHILIMCLE16:2416:25
7ATTILIAL16:2916:30
8RELANGIRLG16:3316:34
9VELPURUVPU16:3616:37
10TANUKUTNKU16:4416:45
11SATYAVADASTVA16:4816:49
12KALDHARIKLDI16:5416:55
13NIDADAVOLU JUNCTIONNDD17:40DST

Frequently Asked Questions — 67283 Bhimavaram Junction - Nidadavolu MEMU

What time does 67283 (Bhimavaram Junction - Nidadavolu MEMU) start from BHIMAVARAM JUNCTION?
It departs from BHIMAVARAM JUNCTION (BVRM) at 16:10 and reaches NIDADAVOLU JUNCTION (NDD) at 17:40.
What is the last station for 67283?
The final station of 67283 is NIDADAVOLU JUNCTION (NDD), arriving at 17:40. You can see the full schedule and route map above.
Where is train number 67283 right now?
You can check the live location of 67283 (Bhimavaram Junction - Nidadavolu MEMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 67283?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 67283 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 67283?
It covers a total distance of 46 km from BHIMAVARAM JUNCTION to NIDADAVOLU JUNCTION in about 1 hours and 30 minutes.
On which days does 67283 run?
This train runs on: Daily. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.