68112 Train Running Status Today — Bankura - Masagram MEMU
68112
Bankura - Masagram MEMU68112
Bankura - Masagram MEMUArrival
Day 1 - 19 Jul
Departure
68112MEMU
Bankura - Masagram MEMU
Runs On
MonTueWedThuFriSatSun
Distance
118 kmDuration
3hHalts
32Avg Speed
39.3 km/hMax Speed
72 km/hReturn
68111Arrival
Day 1 - Jul 19
Departure
BANKURA JUNCTION
0.0 km•
6:05PM6:05PM
6:10PM6:10PM
BIKNA
4.0 km•
6:11PM6:11PM
6:16PM6:16PM
NOBANDA
9.0 km•
6:17PM6:17PM
6:20PM6:20PM
BELBONI
11.0 km•
6:21PM6:21PM
6:29PM6:29PM
BELIATORE
19.0 km•
6:30PM6:30PM
6:34PM6:34PM
CHHANDAR
23.0 km•
6:35PM6:35PM
6:39PM6:39PM
BRINDABANPUR
26.0 km•
6:40PM6:40PM
6:45PM6:45PM
SRIRAMPUR P.H.
30.0 km•
6:46PM6:46PM
6:51PM6:51PM
HAMIRHATI PH
35.0 km•
6:52PM6:52PM
6:59PM6:59PM
SONAMUKHI
41.0 km•
7:00PM7:00PM
7:10PM7:10PM
DHANSIMLA
47.0 km•
7:11PM7:11PM
7:16PM7:16PM
DHAGARIA
52.0 km•
7:17PM7:17PM
7:22PM7:22PM
PATRASAYER
56.0 km•
7:23PM7:23PM
7:28PM7:28PM
BETUR
62.0 km•
7:29PM7:29PM
7:32PM7:32PM
KUMRUL
64.0 km•
7:33PM7:33PM
7:37PM7:37PM
INDAS
68.0 km•
7:38PM7:38PM
7:42PM7:42PM
SHANKRUL
71.0 km•
7:43PM7:43PM
7:46PM7:46PM
SAHASPUR ROAD
74.0 km•
7:47PM7:47PM
7:52PM7:52PM
BOWAICHANDI
79.0 km•
7:53PM7:53PM
7:57PM7:57PM
GUIR SARANGA
82.0 km•
7:58PM7:58PM
8:01PM8:01PM
KAIYAR
84.0 km•
8:02PM8:02PM
8:07PM8:07PM
SEHARA BAZAR
87.0 km•
8:08PM8:08PM
8:13PM8:13PM
GOPINATHPUR
92.0 km•
8:14PM8:14PM
8:16PM8:16PM
SHYAMSUNDAR
94.0 km•
8:17PM8:17PM
8:20PM8:20PM
RAINAGAR
97.0 km•
8:21PM8:21PM
8:29PM8:29PM
BOKRA
102.0 km•
8:30PM8:30PM
8:35PM8:35PM
MATHNASHIPUR
108.0 km•
8:36PM8:36PM
8:39PM8:39PM
BERUGRAM
110.0 km•
8:40PM8:40PM
8:42PM8:42PM
GRAM DADPUR
112.0 km•
8:43PM8:43PM
8:46PM8:46PM
HABASPUR
113.0 km•
8:47PM8:47PM
8:51PM8:51PM
MUSTAPHACHAK
115.0 km•
8:52PM8:52PM
9:05PM9:05PM
MASAGRAM
118.0 km•
At BANKURA JUNCTION
ScheduledUpdated few seconds ago
BQAMSAE
Next StopBKNO4km - 6:10PM
To ReachMSAE118km - 9:05PM
68112 Bankura - Masagram MEMU runs from BANKURA JUNCTION to MASAGRAM. It covers 118 km in 3h, stopping at 32 stations. Departs BANKURA JUNCTION at 18:05 and arrives at MASAGRAM at 21:05. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. This train runs on Mon, Tue, Wed, Thu, Fri, Sun.
68112 Schedule — 32 stops
IST| # | Station | Arr | Dep |
|---|---|---|---|
| 1 | BANKURA JUNCTIONBQA | SRC | 18:05 |
| 2 | BIKNABKNO | 18:10 | 18:11 |
| 3 | NOBANDANOB | 18:16 | 18:17 |
| 4 | BELBONIBEX | 18:20 | 18:21 |
| 5 | BELIATOREBZC | 18:29 | 18:30 |
| 6 | CHHANDARCNRF | 18:34 | 18:35 |
| 7 | BRINDABANPURBDPR | 18:39 | 18:40 |
| 8 | SRIRAMPUR P.H.SIMR | 18:45 | 18:46 |
| 9 | HAMIRHATI PHHAM | 18:51 | 18:52 |
| 10 | SONAMUKHISONA | 18:59 | 19:00 |
| 11 | DHANSIMLADIM | 19:10 | 19:11 |
| 12 | DHAGARIADGF | 19:16 | 19:17 |
| 13 | PATRASAYERPSF | 19:22 | 19:23 |
| 14 | BETURBTRB | 19:28 | 19:29 |
| 15 | KUMRULKMRL | 19:32 | 19:33 |
| 16 | INDASINS | 19:37 | 19:38 |
| 17 | SHANKRULSHKL | 19:42 | 19:43 |
| 18 | SAHASPUR ROADSHJ | 19:46 | 19:47 |
| 19 | BOWAICHANDIBWCN | 19:52 | 19:53 |
| 20 | GUIR SARANGAGSQ | 19:57 | 19:58 |
| 21 | KAIYARKYB | 20:01 | 20:02 |
| 22 | SEHARA BAZARSRBZ | 20:07 | 20:08 |
| 23 | GOPINATHPURGOR | 20:13 | 20:14 |
| 24 | SHYAMSUNDARSHMR | 20:16 | 20:17 |
| 25 | RAINAGARRNGR | 20:20 | 20:21 |
| 26 | BOKRABOKA | 20:29 | 20:30 |
| 27 | MATHNASHIPURMTIP | 20:35 | 20:36 |
| 28 | BERUGRAMBUGM | 20:39 | 20:40 |
| 29 | GRAM DADPURGMDP | 20:42 | 20:43 |
| 30 | HABASPURHPUR | 20:46 | 20:47 |
| 31 | MUSTAPHACHAKMFCK | 20:51 | 20:52 |
| 32 | MASAGRAMMSAE | 21:05 | DST |
Frequently Asked Questions — 68112 Bankura - Masagram MEMU
- What time does 68112 (Bankura - Masagram MEMU) start from BANKURA JUNCTION?
- It departs from BANKURA JUNCTION (BQA) at 18:05 and reaches MASAGRAM (MSAE) at 21:05.
- What is the last station for 68112?
- The final station of 68112 is MASAGRAM (MSAE), arriving at 21:05. You can see the full schedule and route map above.
- Where is train number 68112 right now?
- You can check the live location of 68112 (Bankura - Masagram MEMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
- How accurate is the running status for train 68112?
- The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
- Why is train 68112 showing offline or not updating?
- If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
- What is the total travel distance of 68112?
- It covers a total distance of 118 km from BANKURA JUNCTION to MASAGRAM in about 3 hours and 0 minutes.
- On which days does 68112 run?
- This train runs on: Mon, Tue, Wed, Thu, Fri, Sun. Please verify the running status before leaving for the station.
Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.