68126 Train Running Status Today — Barbil - Tatanagar MEMU
68126
Barbil - Tatanagar MEMU68126
Barbil - Tatanagar MEMUArrival
Day 1 - 18 Jul
Departure
68126MEMU
Barbil - Tatanagar MEMU
Runs On
MonTueWedThuFriSatSun
Distance
150 kmDuration
3h 55mHalts
17Avg Speed
38.3 km/hMax Speed
85.7 km/hReturn
68125Arrival
Day 1 - Jul 18
Departure
BARBIL
0.0 km•
6:15AM6:16AM
6:28AM6:33AM
BARA JAMDA JUNCTION
10.0 km•
6:30AM6:36AM
6:46AM6:52AM
NOAMUNDI
23.0 km•
6:47AM7:00AM
6:55AM
PADA PAHAR JUNCTION
26.1 km
6:55AM
7:10AM7:19AM
DANGOAPOSI
32.0 km•
7:20AM7:39AM
7:32AM7:51AM
MALUKA
42.0 km•
7:33AM7:56AM
7:44AM8:01AM
KENDPOSI
53.0 km•
7:45AM8:08AM
7:54AM8:11AM
TALABURU
61.0 km•
7:55AM8:18AM
8:04AM8:27AM
JHINKPANI
70.0 km•
8:05AM8:29AM
8:12AM8:35AM
SINGHPOKHARIA
80.0 km•
8:13AM8:44AM
8:19AM8:49AM
CHAIBASA
88.0 km•
8:20AM8:56AM
8:26AM9:01AM
PANDRASALI
96.0 km•
8:27AM9:09AM
8:44AM9:26AM
RAJKHARSAWAN JUNCTION
108.0 km•
8:45AM9:27AM
8:52AM9:34AM
MAHALI MARUP
115.0 km•
8:53AM9:35AM
9:01AM9:43AM
SINI JUNCTION
123.0 km•
9:02AM9:44AM
9:10AM
BIRBANS
130.1 km
9:10AM
9:19AM10:01AM
GAMHARIA JUNCTION
139.0 km•
9:20AM10:02AM
9:27AM10:09AM
ADITYAPUR
146.0 km•
9:28AM10:10AM
10:10AM10:52AM
TATANAGAR JUNCTION
150.0 km•
Departed PANDRASALI
41m LateUpdated few seconds ago
BBNTATA
Next StopRKSN108km - 9:26AM
To ReachTATA150km - 10:52AM
Delayed by 41 minutes at PRSL
68126 Barbil - Tatanagar MEMU runs from BARBIL to TATANAGAR JUNCTION. It covers 150 km in 3h 55m, stopping at 17 stations. Departs BARBIL at 06:15 and arrives at TATANAGAR JUNCTION at 10:10. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.
68126 Schedule — 17 stops
IST| # | Station | Arr | Dep |
|---|---|---|---|
| 1 | BARBILBBN | SRC | 06:15 |
| 2 | BARA JAMDA JUNCTIONBJMD | 06:28 | 06:30 |
| 3 | NOAMUNDINOMD | 06:46 | 06:47 |
| 5 | DANGOAPOSIDPS | 07:10 | 07:20 |
| 6 | MALUKAMLKA | 07:32 | 07:33 |
| 7 | KENDPOSIKNPS | 07:44 | 07:45 |
| 8 | TALABURUTABU | 07:54 | 07:55 |
| 9 | JHINKPANIJNK | 08:04 | 08:05 |
| 10 | SINGHPOKHARIASIPA | 08:12 | 08:13 |
| 11 | CHAIBASACBSA | 08:19 | 08:20 |
| 12 | PANDRASALIPRSL | 08:26 | 08:27 |
| 13 | RAJKHARSAWAN JUNCTIONRKSN | 08:44 | 08:45 |
| 14 | MAHALI MARUPMMV | 08:52 | 08:53 |
| 15 | SINI JUNCTIONSINI | 09:01 | 09:02 |
| 17 | GAMHARIA JUNCTIONGMH | 09:19 | 09:20 |
| 18 | ADITYAPURADTP | 09:27 | 09:28 |
| 19 | TATANAGAR JUNCTIONTATA | 10:10 | DST |
Frequently Asked Questions — 68126 Barbil - Tatanagar MEMU
- What time does 68126 (Barbil - Tatanagar MEMU) start from BARBIL?
- It departs from BARBIL (BBN) at 06:15 and reaches TATANAGAR JUNCTION (TATA) at 10:10.
- What is the last station for 68126?
- The final station of 68126 is TATANAGAR JUNCTION (TATA), arriving at 10:10. You can see the full schedule and route map above.
- Where is train number 68126 right now?
- You can check the live location of 68126 (Barbil - Tatanagar MEMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
- How accurate is the running status for train 68126?
- The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
- Why is train 68126 showing offline or not updating?
- If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
- What is the total travel distance of 68126?
- It covers a total distance of 150 km from BARBIL to TATANAGAR JUNCTION in about 3 hours and 55 minutes.
- On which days does 68126 run?
- This train runs on: Daily. Please verify the running status before leaving for the station.
Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.