RailRadar LogoRailRadar

68130 Train Running Status Today — Badampahar - Tatanagar MEMU

68130
Badampahar - Tatanagar MEMU
Arrival
Day 1 - 20 Jul
Departure
68130MEMU

Badampahar - Tatanagar MEMU

Runs On

MonTueWedThuFriSatSun
Distance
89 km
Duration
2h 30m
Halts
9
Avg Speed
35.6 km/h
Max Speed
76.4 km/h
Return
68129
Arrival
Day 1 - Jul 20
Departure
BADAMPAHAR
0.0 km
7:00AM7:00AM
7:10AM7:10AM
CHHANUA
9.0 km
7:12AM7:12AM
7:18AM7:18AM
KULDIHA
16.0 km
7:20AM7:20AM
7:29AM7:29AM
RAIRANGPUR
25.0 km
7:31AM7:31AM
7:42AM7:42AM
AUNLAJORI JUNCTION
34.0 km
7:52AM7:52AM
8:03AM8:03AM
BAHALDA ROAD
48.0 km
8:05AM8:05AM
8:14AM8:14AM
SIDHIRSAI
56.0 km
8:16AM8:16AM
8:27AM8:27AM
HALUDPUKUR
68.0 km
8:29AM8:29AM
9:30AM9:30AM
TATANAGAR JUNCTION
89.0 km
At BADAMPAHAR
ScheduledUpdated few seconds ago
BMPRTATA
Next StopCHNU9km - 7:10AM
To ReachTATA89km - 9:30AM

68130 Badampahar - Tatanagar MEMU runs from BADAMPAHAR to TATANAGAR JUNCTION. It covers 89 km in 2h 30m, stopping at 9 stations. Departs BADAMPAHAR at 07:00 and arrives at TATANAGAR JUNCTION at 09:30. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. This train runs on Mon, Tue, Wed, Thu, Fri, Sat.

68130 Schedule — 9 stops

IST
#StationArrDep
1BADAMPAHARBMPRSRC07:00
2CHHANUACHNU07:1007:12
3KULDIHAKIJ07:1807:20
4RAIRANGPURRRP07:2907:31
5AUNLAJORI JUNCTIONOND07:4207:52
6BAHALDA ROADBDO08:0308:05
7SIDHIRSAISDHS08:1408:16
8HALUDPUKURHLD08:2708:29
9TATANAGAR JUNCTIONTATA09:30DST

Frequently Asked Questions — 68130 Badampahar - Tatanagar MEMU

What time does 68130 (Badampahar - Tatanagar MEMU) start from BADAMPAHAR?
It departs from BADAMPAHAR (BMPR) at 07:00 and reaches TATANAGAR JUNCTION (TATA) at 09:30.
What is the last station for 68130?
The final station of 68130 is TATANAGAR JUNCTION (TATA), arriving at 09:30. You can see the full schedule and route map above.
Where is train number 68130 right now?
You can check the live location of 68130 (Badampahar - Tatanagar MEMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 68130?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 68130 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 68130?
It covers a total distance of 89 km from BADAMPAHAR to TATANAGAR JUNCTION in about 2 hours and 30 minutes.
On which days does 68130 run?
This train runs on: Mon, Tue, Wed, Thu, Fri, Sat. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.