RailRadar LogoRailRadar

69232 Train Running Status Today — Chittaurgarh - Ujjain Passenger

69232
Chittaurgarh - Ujjain Passenger
Arrival
Day 1 - 18 Jul
Departure
69232MEMU

Chittaurgarh - Ujjain Passenger

Runs On

MonTueWedThuFriSatSun
Distance
291 km
Duration
6h 10m
Halts
9
Avg Speed
47.2 km/h
Max Speed
94 km/h
Return
69231
Arrival
Day 1 - Jul 18
Departure
CHITTAURGARH JUNCTION
0.0 km
4:40PM4:40PM
4:44PM
ORDI
5.5 km
4:44PM
4:49PM
SHAMBHUPURA
11.8 km
4:49PM
4:56PM
GAMBHIRI ROAD
20.9 km
4:56PM
5:02PM5:02PM
NIMBAHERA
29.0 km
5:04PM5:04PM
5:15PM
JAWAD ROAD
39.5 km
5:15PM
5:22PM
BISALWAS KALAN
46.6 km
5:22PM
5:32PM5:32PM
NIMACH
56.0 km
5:34PM5:34PM
5:42PM
JMKL STATION
63.7 km
5:42PM
5:49PM
HARKIYAKHAL
69.2 km
5:49PM
5:56PM
MYKR STATION
75.6 km
5:56PM
6:02PM
MALHARGARH
81.3 km
6:02PM
6:11PM
PIPLIA
89.1 km
6:11PM
6:18PM
SDPN STATION
95.5 km
6:18PM
6:28PM6:28PM
MANDSOR
105.0 km
6:30PM6:30PM
6:44PM
DALAUDA
119.5 km
6:44PM
6:53PM
KACHNARA ROAD
130.0 km
6:53PM
6:55PM
KACHNARA
131.7 km
6:55PM
7:02PM
DHODHAR
139.3 km
7:02PM
7:10PM
MDLM STATION
147.4 km
7:10PM
7:18PM7:18PM
JAORA
156.0 km
7:20PM7:20PM
7:28PM
BARAYALA CHAURASI
162.9 km
7:28PM
7:40PM
NAMLI
172.1 km
7:40PM
7:44PM
NITYANAND DHAM
175.6 km
7:44PM
7:49PM
DHOSAWAS
179.8 km
7:49PM
7:57PM
RATLAM EAST CABIN
186.2 km
7:57PM
8:00PM8:00PM
RATLAM JUNCTION
189.0 km
8:10PM8:10PM
8:12PM
RATLAM EAST CABIN
191.5 km
8:12PM
8:17PM
Q-TRACK LINE CABIN
199.5 km
8:17PM
8:25PM
NAUGANWAN
212.8 km
8:25PM
8:29PM
PRITAM NAGAR
218.0 km
8:29PM
8:32PM
RUNIJA
224.1 km
8:32PM
8:35PM
SUNDERABAD
228.1 km
8:35PM
8:40PM8:40PM
BARNAGAR
236.0 km
8:42PM8:42PM
8:54PM
PIRJHALAR
243.5 km
8:54PM
9:08PM
GAUTAMPURA ROAD
252.2 km
9:08PM
9:22PM
OSRA
260.7 km
9:22PM
9:32PM
FATEHABAD CHANDRAWATIGANJ BYPASS CABIN
266.8 km
9:32PM
9:34PM9:34PM
FATEHABAD CHANDRAWATIGANJ JUNCTION
268.0 km
9:36PM9:36PM
9:40PM
X LEKODA CABIN
269.2 km
9:40PM
10:02PM
LEKODA
276.0 km
10:02PM
10:30PM
CHINTAMAN GANESH
284.7 km
10:30PM
10:41PM
SIPRA BRIDGE
288.1 km
10:41PM
10:50PM10:50PM
UJJAIN JUNCTION
291.0 km
At CHITTAURGARH JUNCTION
ScheduledUpdated few seconds ago
CORUJN
Next StopNBH29km - 5:02PM
To ReachUJN291km - 10:50PM

69232 Chittaurgarh - Ujjain Passenger runs from CHITTAURGARH JUNCTION to UJJAIN JUNCTION. It covers 291 km in 6h 10m, stopping at 9 stations. Departs CHITTAURGARH JUNCTION at 16:40 and arrives at UJJAIN JUNCTION at 22:50. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.

69232 Schedule — 9 stops

IST
#StationArrDep
1CHITTAURGARH JUNCTIONCORSRC16:40
5NIMBAHERANBH17:0217:04
8NIMACHNMH17:3217:34
15MANDSORMDS18:2818:30
21JAORAJAO19:1819:20
27RATLAM JUNCTIONRTM20:0020:10
34BARNAGARBNG20:4020:42
39FATEHABAD CHANDRAWATIGANJ JUNCTIONFTD21:3421:36
44UJJAIN JUNCTIONUJN22:50DST

Frequently Asked Questions — 69232 Chittaurgarh - Ujjain Passenger

What time does 69232 (Chittaurgarh - Ujjain Passenger) start from CHITTAURGARH JUNCTION?
It departs from CHITTAURGARH JUNCTION (COR) at 16:40 and reaches UJJAIN JUNCTION (UJN) at 22:50.
What is the last station for 69232?
The final station of 69232 is UJJAIN JUNCTION (UJN), arriving at 22:50. You can see the full schedule and route map above.
Where is train number 69232 right now?
You can check the live location of 69232 (Chittaurgarh - Ujjain Passenger) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 69232?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 69232 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 69232?
It covers a total distance of 291 km from CHITTAURGARH JUNCTION to UJJAIN JUNCTION in about 6 hours and 10 minutes.
On which days does 69232 run?
This train runs on: Daily. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.