RailRadar LogoRailRadar

74018 Train Running Status Today — Rohtak - Rewari DEMU

74018
Rohtak - Rewari DEMU
Arrival
Day 1 - 20 Jul
Departure
74018DMU

Rohtak - Rewari DEMU

Runs On

MonTueWedThuFriSatSun
Distance
81 km
Duration
1h 50m
Halts
8
Avg Speed
44.2 km/h
Max Speed
85 km/h
Return
74017
Arrival
Day 1 - Jul 20
Departure
ROHTAK JUNCTION
0.0 km
5:00AM5:00AM
5:07AM5:07AM
ASTHAL BOHAR JUNCTION
6.0 km
5:08AM5:08AM
5:24AM5:24AM
DIGHAL
20.0 km
5:25AM5:25AM
5:37AM5:37AM
JHAJJAR
37.0 km
5:39AM5:39AM
5:59AM5:59AM
MACHHRAULI
49.0 km
6:00AM6:00AM
6:11AM6:11AM
PALHAWAS
63.0 km
6:12AM6:12AM
6:22AM6:22AM
GOKALGARH
76.0 km
6:23AM6:23AM
6:44AM
REWARI OUTER CABIN
79.9 km
6:44AM
6:50AM6:50AM
REWARI JUNCTION
81.0 km
At ROHTAK JUNCTION
ScheduledUpdated few seconds ago
ROKRE
Next StopABO6km - 5:07AM
To ReachRE81km - 6:50AM

74018 Rohtak - Rewari DEMU runs from ROHTAK JUNCTION to REWARI JUNCTION. It covers 81 km in 1h 50m, stopping at 8 stations. Departs ROHTAK JUNCTION at 05:00 and arrives at REWARI JUNCTION at 06:50. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. This train runs on Mon, Tue, Wed, Thu, Fri, Sat.

74018 Schedule — 8 stops

IST
#StationArrDep
1ROHTAK JUNCTIONROKSRC05:00
2ASTHAL BOHAR JUNCTIONABO05:0705:08
3DIGHALDGHL05:2405:25
4JHAJJARJHJ05:3705:39
5MACHHRAULIMHRI05:5906:00
6PALHAWASPLHW06:1106:12
7GOKALGARHGKG06:2206:23
9REWARI JUNCTIONRE06:50DST

Frequently Asked Questions — 74018 Rohtak - Rewari DEMU

What time does 74018 (Rohtak - Rewari DEMU) start from ROHTAK JUNCTION?
It departs from ROHTAK JUNCTION (ROK) at 05:00 and reaches REWARI JUNCTION (RE) at 06:50.
What is the last station for 74018?
The final station of 74018 is REWARI JUNCTION (RE), arriving at 06:50. You can see the full schedule and route map above.
Where is train number 74018 right now?
You can check the live location of 74018 (Rohtak - Rewari DEMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 74018?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 74018 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 74018?
It covers a total distance of 81 km from ROHTAK JUNCTION to REWARI JUNCTION in about 1 hours and 50 minutes.
On which days does 74018 run?
This train runs on: Mon, Tue, Wed, Thu, Fri, Sat. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.