RailRadar LogoRailRadar

74988 Train Running Status Today — Fazilka - Bathinda DEMU

74988
Fazilka - Bathinda DEMU
Arrival
Day 1 - 19 Jul
Departure
74988DMU

Fazilka - Bathinda DEMU

Runs On

MonTueWedThuFriSatSun
Distance
123 km
Duration
3h 5m
Halts
19
Avg Speed
39.9 km/h
Max Speed
96 km/h
Return
74987
Arrival
Day 1 - Jul 19
Departure
FAZILKA JUNCTION
0.0 km
4:15PM4:15PM
4:23PM4:23PM
CHAK BANWALA
9.0 km
4:24PM4:24PM
4:30PM4:30PM
CHAK PAKHEWALA
15.0 km
4:31PM4:31PM
4:38PM4:38PM
RORANWALA
23.0 km
4:39PM4:39PM
4:45PM4:45PM
LAKHEWALI
31.0 km
4:47PM4:47PM
4:55PM4:55PM
BHAGSAR
37.0 km
4:56PM4:56PM
5:01PM5:01PM
BADHAI BALAMGARH HALT
40.0 km
5:02PM5:02PM
5:07PM5:07PM
MUKTSAR
48.0 km
5:10PM5:10PM
5:20PM5:20PM
CHAREWAN
55.0 km
5:21PM5:21PM
5:25PM5:25PM
JHABELWALI
57.0 km
5:26PM5:26PM
5:31PM5:31PM
BARIWALA
63.0 km
5:33PM5:33PM
5:43PM5:43PM
WANDER JATANA
71.0 km
5:44PM5:44PM
5:58PM5:58PM
KOT KAPURA JUNCTION
80.0 km
6:00PM6:00PM
6:13PM6:13PM
ROMANA ALBEL SINGH
89.0 km
6:14PM6:14PM
6:20PM6:20PM
AJIT GILL MATTA
93.0 km
6:21PM6:21PM
6:25PM6:25PM
GANGSAR JAITO
96.0 km
6:27PM6:27PM
6:35PM6:35PM
CHAND BHAN
103.0 km
6:37PM6:37PM
6:45PM6:45PM
GONEANA BHAI JAGTA
111.0 km
6:47PM6:47PM
7:20PM7:20PM
BATHINDA JUNCTION
123.0 km
At FAZILKA JUNCTION
ScheduledUpdated few seconds ago
FKABTI
Next StopCKLA9km - 4:23PM
To ReachBTI123km - 7:20PM

74988 Fazilka - Bathinda DEMU runs from FAZILKA JUNCTION to BATHINDA JUNCTION. It covers 123 km in 3h 5m, stopping at 19 stations. Departs FAZILKA JUNCTION at 16:15 and arrives at BATHINDA JUNCTION at 19:20. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.

74988 Schedule — 19 stops

IST
#StationArrDep
1FAZILKA JUNCTIONFKASRC16:15
2CHAK BANWALACKLA16:2316:24
3CHAK PAKHEWALACKA16:3016:31
4RORANWALARRW16:3816:39
5LAKHEWALILKW16:4516:47
6BHAGSARBSGR16:5516:56
7BADHAI BALAMGARH HALTBDBG17:0117:02
8MUKTSARMKS17:0717:10
9CHAREWANCWN17:2017:21
10JHABELWALIJBW17:2517:26
11BARIWALABRW17:3117:33
12WANDER JATANAWDJ17:4317:44
13KOT KAPURA JUNCTIONKKP17:5818:00
14ROMANA ALBEL SINGHRLS18:1318:14
15AJIT GILL MATTAAJTM18:2018:21
16GANGSAR JAITOGJUT18:2518:27
17CHAND BHANCBX18:3518:37
18GONEANA BHAI JAGTAGNA18:4518:47
19BATHINDA JUNCTIONBTI19:20DST

Frequently Asked Questions — 74988 Fazilka - Bathinda DEMU

What time does 74988 (Fazilka - Bathinda DEMU) start from FAZILKA JUNCTION?
It departs from FAZILKA JUNCTION (FKA) at 16:15 and reaches BATHINDA JUNCTION (BTI) at 19:20.
What is the last station for 74988?
The final station of 74988 is BATHINDA JUNCTION (BTI), arriving at 19:20. You can see the full schedule and route map above.
Where is train number 74988 right now?
You can check the live location of 74988 (Fazilka - Bathinda DEMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 74988?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 74988 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 74988?
It covers a total distance of 123 km from FAZILKA JUNCTION to BATHINDA JUNCTION in about 3 hours and 5 minutes.
On which days does 74988 run?
This train runs on: Daily. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.