RailRadar LogoRailRadar

75280 Train Running Status Today — Harnagar - Darbhanga DEMU

75280
Harnagar - Darbhanga DEMU
Arrival
Day 1 - 19 Jul
Departure
75280DMU

Harnagar - Darbhanga DEMU

Runs On

MonTueWedThuFriSatSun
Distance
63 km
Duration
2h 50m
Halts
13
Avg Speed
22.2 km/h
Max Speed
45 km/h
Arrival
Day 1 - Jul 19
Departure
HARNAGAR
0.0 km
4:40AM4:40AM
4:52AM4:52AM
BIRAUL
9.0 km
4:53AM4:53AM
5:12AM5:12AM
NEURI HALT
17.0 km
5:13AM5:13AM
5:30AM5:30AM
BENIPUR HALT
24.0 km
5:31AM5:31AM
5:41AM5:41AM
MAA JAGDAMBA NAWADA HALT
28.0 km
5:42AM5:42AM
5:49AM5:49AM
BAIGANI
30.0 km
5:50AM5:50AM
6:03AM6:03AM
JAGDISHPUR
35.0 km
6:04AM6:04AM
6:30AM6:30AM
SAKRI JUNCTION
44.0 km
6:32AM6:32AM
6:41AM6:41AM
SHAHEED SURAJ NARAYAN SINGH HALT
47.0 km
6:42AM6:42AM
6:54AM6:54AM
TARSARAI
50.0 km
6:55AM6:55AM
7:03AM7:03AM
BIJULI HALT
53.0 km
7:04AM7:04AM
7:08AM7:08AM
KAKARGHATTI
56.0 km
7:09AM7:09AM
7:14AM
DARBHANGA JN CABIN B
57.6 km
7:14AM
7:30AM7:30AM
DARBHANGA JUNCTION
63.0 km
At HARNAGAR
ScheduledUpdated few seconds ago
HRGRDBG
Next StopBIRL9km - 4:52AM
To ReachDBG63km - 7:30AM

75280 Harnagar - Darbhanga DEMU runs from HARNAGAR to DARBHANGA JUNCTION. It covers 63 km in 2h 50m, stopping at 13 stations. Departs HARNAGAR at 04:40 and arrives at DARBHANGA JUNCTION at 07:30. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.

75280 Schedule — 13 stops

IST
#StationArrDep
1HARNAGARHRGRSRC04:40
2BIRAULBIRL04:5204:53
3NEURI HALTNUIH05:1205:13
4BENIPUR HALTBPAH05:3005:31
5MAA JAGDAMBA NAWADA HALTMJNS05:4105:42
6BAIGANIBIGN05:4905:50
7JAGDISHPURJPAH06:0306:04
8SAKRI JUNCTIONSKI06:3006:32
9SHAHEED SURAJ NARAYAN SINGH HALTSSNS06:4106:42
10TARSARAITRS06:5406:55
11BIJULI HALTBJIH07:0307:04
12KAKARGHATTIKKHT07:0807:09
14DARBHANGA JUNCTIONDBG07:30DST

Frequently Asked Questions — 75280 Harnagar - Darbhanga DEMU

What time does 75280 (Harnagar - Darbhanga DEMU) start from HARNAGAR?
It departs from HARNAGAR (HRGR) at 04:40 and reaches DARBHANGA JUNCTION (DBG) at 07:30.
What is the last station for 75280?
The final station of 75280 is DARBHANGA JUNCTION (DBG), arriving at 07:30. You can see the full schedule and route map above.
Where is train number 75280 right now?
You can check the live location of 75280 (Harnagar - Darbhanga DEMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 75280?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 75280 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 75280?
It covers a total distance of 63 km from HARNAGAR to DARBHANGA JUNCTION in about 2 hours and 50 minutes.
On which days does 75280 run?
This train runs on: Daily. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.