RailRadar LogoRailRadar

76508 Train Running Status Today — SSS Hubballi - Hosapete DEMU

76508
SSS Hubballi - Hosapete DEMU
Arrival
Day 1 - 19 Jul
Departure
76508EMU

SSS Hubballi - Hosapete DEMU

Runs On

MonTueWedThuFriSatSun
Distance
143.4 km
Duration
2h 35m
Halts
12
Avg Speed
55.5 km/h
Max Speed
70.5 km/h
Return
76507
Arrival
Day 1 - Jul 19
Departure
SSS HUBBALLI JUNCTION (HUBLI)
0.0 km
11:30PM11:30PM
11:31PM
HUBBALLI EAST CABIN
1.6 km
11:31PM
11:32PM
HUBBALLI OUTER CABIN
2.4 km
11:32PM
11:34PM11:34PM
BAMMAPUR
4.7 km
11:34PM11:34PM
11:39PM11:39PM
KUSUGAL
9.6 km
11:39PM11:39PM
11:47PM
HEBSUR
18.8 km
11:47PM
11:51PM11:51PM
SISVINHALLI
22.6 km
11:52PM11:52PM
11:56PM
NAVALGUND ROAD
26.4 km
11:56PM
Day 2 - Mon, Jul 20
12:04AM12:04AM
ANNIGERI
34.9 km
12:05AM12:05AM
12:09AM
KONDIKOPPA
39.1 km
12:09AM
12:15AM
HULKOTI
45.2 km
12:15AM
12:23AM
BINKADAKATTI
52.6 km
12:23AM
12:28AM12:28AM
GADAG JUNCTION
57.6 km
12:30AM12:30AM
12:38AM
KANGINHAL
66.3 km
12:38AM
12:46AM
HARLAPUR
75.7 km
12:46AM
12:51AM
HALLIGUDI
80.5 km
12:51AM
12:54AM
SOMPUR ROAD
84.6 km
12:54AM
1:01AM1:01AM
BANNI KOPPA
92.1 km
1:02AM1:02AM
1:07AM
TALKL STATION
97.3 km
1:07AM
1:07AM
TALAKAL
98.3 km
1:07AM
1:12AM1:12AM
BHANAPUR
103.4 km
1:13AM1:13AM
1:24AM1:24AM
KOPPAL
115.6 km
1:26AM1:26AM
1:40AM1:40AM
GINIGERA JUNCTION
126.7 km
1:41AM1:41AM
1:49AM
HITNAL
133.7 km
1:49AM
1:53AM1:53AM
MUNIRABAD
137.4 km
1:54AM1:54AM
2:05AM2:05AM
HOSAPETE JUNCTION (HOSPET)
143.4 km
At SSS HUBBALLI JUNCTION (HUBLI)
ScheduledUpdated few seconds ago
UBLHPT
Next StopBMAP4.7km - 11:34PM
To ReachHPT143.4km - 2:05AM

76508 SSS Hubballi - Hosapete DEMU runs from SSS HUBBALLI JUNCTION (HUBLI) to HOSAPETE JUNCTION (HOSPET). It covers 143.4 km in 2h 35m, stopping at 12 stations. Departs SSS HUBBALLI JUNCTION (HUBLI) at 23:30 and arrives at HOSAPETE JUNCTION (HOSPET) at 02:05. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. This train runs on Sun.

76508 Schedule — 12 stops

IST
#StationArrDep
1SSS HUBBALLI JUNCTION (HUBLI)UBLSRC23:30
4BAMMAPURBMAP23:3423:34
5KUSUGALKUG23:3923:39
7SISVINHALLISVHE23:5123:52
9ANNIGERINGR00:0400:05
13GADAG JUNCTIONGDG00:2800:30
18BANNI KOPPABNA01:0101:02
21BHANAPURBNP01:1201:13
22KOPPALKBL01:2401:26
23GINIGERA JUNCTIONGIN01:4001:41
25MUNIRABADMRB01:5301:54
26HOSAPETE JUNCTION (HOSPET)HPT02:05DST

Frequently Asked Questions — 76508 SSS Hubballi - Hosapete DEMU

What time does 76508 (SSS Hubballi - Hosapete DEMU) start from SSS HUBBALLI JUNCTION (HUBLI)?
It departs from SSS HUBBALLI JUNCTION (HUBLI) (UBL) at 23:30 and reaches HOSAPETE JUNCTION (HOSPET) (HPT) at 02:05.
What is the last station for 76508?
The final station of 76508 is HOSAPETE JUNCTION (HOSPET) (HPT), arriving at 02:05. You can see the full schedule and route map above.
Where is train number 76508 right now?
You can check the live location of 76508 (SSS Hubballi - Hosapete DEMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
How accurate is the running status for train 76508?
The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
Why is train 76508 showing offline or not updating?
If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
What is the total travel distance of 76508?
It covers a total distance of 143.4 km from SSS HUBBALLI JUNCTION (HUBLI) to HOSAPETE JUNCTION (HOSPET) in about 2 hours and 35 minutes.
On which days does 76508 run?
This train runs on: Sun. Please verify the running status before leaving for the station.

Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.