91000 Train Running Status Today — Churchgate Mumbai EMU
91000
Churchgate Mumbai EMU91000
Churchgate Mumbai EMUArrival
Day 1 - 18 Jul
Departure
91000EMU
Churchgate Mumbai EMU
Runs On
MonTueWedThuFriSatSun
Distance
82.5 kmDuration
1h 25mHalts
16Avg Speed
58.2 km/hMax Speed
192 km/hReturn
90999Arrival
Day 1 - Jul 18
Departure
VIRAR
0.0 km•
10:55PM10:55PM
11:01PM11:01PM
NALLA SOPARA
4.2 km•
11:01PM11:01PM
11:07PM11:07PM
VASAI ROAD
8.4 km•
11:07PM11:07PM
11:12PM11:12PM
NAIGAON
12.2 km•
11:12PM11:12PM
11:18PM11:18PM
BHAYANDAR
16.8 km•
11:18PM11:18PM
11:23PM11:23PM
MIRA ROAD
20.0 km•
11:23PM11:23PM
11:27PM11:27PM
DAHISAR
23.6 km•
11:27PM11:27PM
11:32PM11:32PM
BORIVALI
25.9 km•
11:32PM11:32PM
11:35PM
KANDIVLI EMU SHED
28.0 km
11:35PM
11:35PM
KANDIVLI
28.7 km
11:35PM
11:38PM
MALAD
30.7 km
11:38PM
11:41PM
GOREGAON
33.1 km
11:41PM
11:43PM
RAM MANDIR
34.7 km
11:43PM
11:44PM
JOGESHWARI
35.8 km
11:44PM
11:47PM11:47PM
ANDHERI
38.2 km•
11:47PM11:47PM
11:52PM
SANTA CRUZ
42.5 km
11:52PM
11:56PM11:56PM
BANDRA
45.5 km•
11:56PM11:56PM
11:58PM
MAHIM
47.2 km
11:58PM
Day 2 - Sun, Jul 19
12:00AM
KINGS CIRCLE
48.7 km
12:00AM
12:01AM
MATUNGA
49.7 km
12:01AM
Day 2 - Sun, Jul 19
12:02AM12:02AM
DADAR WESTERN
50.9 km•
12:02AM12:02AM
12:03AM
PAREL
52.1 km
12:03AM
12:03AM
PAREL LOCO WORKSHOP
52.7 km
12:03AM
12:04AM
WOR STATION
54.4 km
12:04AM
12:05AM
LOWER PAREL
56.3 km
12:05AM
12:05AM
CHINCHPOKLI
57.3 km
12:05AM
12:06AM
REAY ROAD
58.9 km
12:06AM
12:07AM
MAHALAKSHMI
61.0 km
12:07AM
12:07AM
BYCULLA
62.1 km
12:07AM
12:08AM
DOCKYARD ROAD
63.7 km
12:08AM
12:09AM
MUMBAI CENTRAL EMU CARSHED
66.4 km
12:09AM
12:09AM12:09AM
MUMBAI CENTRAL
67.1 km•
12:09AM12:09AM
12:10AM
SANDHURST ROAD
69.5 km
12:10AM
12:11AM12:11AM
GRANT ROAD
72.1 km•
12:11AM12:11AM
12:12AM
DOCKYARD ROAD
75.2 km
12:12AM
12:12AM
SANDHURST ROAD
76.1 km
12:12AM
12:13AM12:13AM
CHARNI ROAD
78.5 km•
12:13AM12:13AM
12:16AM12:16AM
MARINE LINES
79.4 km•
12:16AM12:16AM
12:18AM
18 STATION
80.9 km
12:18AM
12:19AM
CSMT
81.5 km
12:19AM
12:20AM12:20AM
CHURCHGATE
82.5 km•
At VIRAR
ScheduledUpdated few seconds ago
VRCCG
Next StopNSP4.2km - 11:01PM
To ReachCCG82.5km - 12:20AM
91000 Churchgate Mumbai EMU runs from VIRAR to CHURCHGATE. It covers 82.5 km in 1h 25m, stopping at 16 stations. Departs VIRAR at 22:55 and arrives at CHURCHGATE at 00:20. RailRadar shows the real-time GPS position on a live map using crowdsourced location from passengers on board — updated every 30 seconds. It runs daily.
91000 Schedule — 16 stops
IST| # | Station | Arr | Dep |
|---|---|---|---|
| 1 | VIRARVR | SRC | 22:55 |
| 2 | NALLA SOPARANSP | 23:01 | 23:01 |
| 3 | VASAI ROADBSR | 23:07 | 23:07 |
| 4 | NAIGAONNIG | 23:12 | 23:12 |
| 5 | BHAYANDARBYR | 23:18 | 23:18 |
| 6 | MIRA ROADMIRA | 23:23 | 23:23 |
| 7 | DAHISARDIC | 23:27 | 23:27 |
| 8 | BORIVALIBVI | 23:32 | 23:32 |
| 15 | ANDHERIADH | 23:47 | 23:47 |
| 17 | BANDRABA | 23:56 | 23:56 |
| 21 | DADAR WESTERNDDR | 00:02 | 00:02 |
| 32 | MUMBAI CENTRALBCL | 00:09 | 00:09 |
| 34 | GRANT ROADGTR | 00:11 | 00:11 |
| 37 | CHARNI ROADCYR | 00:13 | 00:13 |
| 38 | MARINE LINESMEL | 00:16 | 00:16 |
| 41 | CHURCHGATECCG | 00:20 | DST |
Frequently Asked Questions — 91000 Churchgate Mumbai EMU
- What time does 91000 (Churchgate Mumbai EMU) start from VIRAR?
- It departs from VIRAR (VR) at 22:55 and reaches CHURCHGATE (CCG) at 00:20.
- What is the last station for 91000?
- The final station of 91000 is CHURCHGATE (CCG), arriving at 00:20. You can see the full schedule and route map above.
- Where is train number 91000 right now?
- You can check the live location of 91000 (Churchgate Mumbai EMU) on the interactive map above. We update the train's position every 30 seconds using GPS reports shared by passengers traveling on this train.
- How accurate is the running status for train 91000?
- The running status is highly accurate because it uses real-time GPS locations from passengers currently inside the train. This is much faster than traditional station arrival reports.
- Why is train 91000 showing offline or not updating?
- If a train is showing offline, it means no passengers are currently sharing its live location from inside the coaches. The position will update as soon as a passenger on board connects.
- What is the total travel distance of 91000?
- It covers a total distance of 82.5 km from VIRAR to CHURCHGATE in about 1 hours and 25 minutes.
- On which days does 91000 run?
- This train runs on: Daily. Please verify the running status before leaving for the station.
Disclaimer: RailRadar is a private crowdsourced platform. We are not officially connected to Indian Railways or IRCTC. Please verify platform numbers and schedules at the station.